You are on page 1of 15

ARN 405 _ Sustainable Architecture

SUSTAINABLE SITES

Supriya Baingaha_18110024
Intro to Project

A hous

4Room, 3washroom, 1 hal

Area- 2700 square ft

Located at Chhawni Road,


Band

Market Area
Site Selection

E TV center
SIT

A Neem Tree
Brownfield Development

There was just a abandoned mud house before the start of

construction, nothing else

Development Density

The site is in the main market

of the city

Resedential as well as market

areas are there


Community Connectivity

TV center

PNB Bank

Jain Lodge
Dance Academy

Mall

3Major roads and a chourah

Main Site is inside a lane of this are

Lane is also a part of site


Site Conditions
In Banda, the climate is warm and temperate. The
summers are much rainier than the winters in
Banda.

The climate here is classified as Cwa by the Köppen-


Geiger system.

The temperature here averages 26.0 °C | 78.8 °F.


Precipitation here is about 959 mm | 37.8 inch per Sun Path Diag
year

Soil: Black Cotton Soil

Average Temp Graph Climate Graph


Spill Prevention & Control

Although they have created a platform for


mixing material but no specific
prevention for rest materials
Soil Erosion Control measures
They havent taken any measures but will be
doing landscapping here
Dust prevention and control emasures

No specific prevention as such but they

covered the openings with plastic for the

shed but this may act as dust prevention in

someway
Parking related aspects (parking footprint, visitor
parking, electric charging)
Both Visitors and personal parking will be
on site
Space for one Car is inside the main gate
and visitors can park in that lane part
Measures to mitigate heat island effect
A small garden will be there near parking space

No plan for green roof or green wall

Temperature of cities is higher than the


temperature of the surrounding areas, our site
being in market will have comparitively higher
temperature.


Storm water management plan


They have ground water boring (150ft)

In addition a thick pipe will be there from roof


and go to ground from here for proper use of BORING
rainwater, hence maintained ground water
level

Pavement will be done for this lane part, so


that ground can easily absorb storm water.
Basic facilities for construction workers
Workers come on site at around 9am and go back at
around 6pm. They come on foot from their
house(4-5km from site
Water Facility- they are drinking direct boring water

No Sanitation facilit
No proper place for res
They bring their own lunch and have it their only
UHI mitigation measures

The road/lane to the main site is narrow and


building beside them are heighted, hence the
lane doent recive much sunligh

Permeable Pavement will be use

No plan for roof, they might me having one


more floor

Plantation of trees will be done at parkin

In addition a small garden will be there


Alternative fuel promotion policy
No plan as such

Transportation plan Pedestrian and bicycle


friendliness
Main Public Transport for the city is E-
Ricksaw and as the main site is inside a
lane, it will not affect the transportation
plan

E T
SI
There is no footpath in nearby roads and
these are kindof main roads which are not
safe for cycling and pedestrians.
Light pollution reduction

They are planning for light for that lane part and a light at main gate.