You are on page 1of 14

ARN 405_Sustainable Architecture

SUSTAINABLE SITES

Anand kasaudhan
18110003
SITE LOCATION

Location : Lalganj Bazar Basti


Uttar Pradesh SIT
E
(26°39'48.4"N 82°49'27.5"E)

SITE INFO.
Purpose: Residential House(Basement+ G)
Site Area: 2250 sqft
Site dimension: 15 x 150 sqft
Built-up Area: 3000 sqft
Ground coverage: 50%
ECO-SENSITIVE ASPECTS

Site is located at the main market of the


Village.
'Kuwano' River is passing through the
village.
During the monsoon season, the water
level increases and gets closer to the
site.

River water 200 m away from site


BROWNFIELD DEVELOPMENT

There was just abandoned land before the


start of construction, nothing else.

DEVELOPMENT DENSITY SITE

Located at the main market.


The road is newly constructed which
directly connects the market to the city.
COMMUNITY CONNECTIVITY

2 major roads and chouraha


Road 1 is the main road which connects
the town with the city. SIT
E
Road 2 is the local road that connects
the site with village areas.
Banks: The central bank of India and RO

1D
AD
2

AOR
Bank of Baroda
Police station
Small Bus stand
SITE CONDITIONS

Climate is warm and temperate.


High Temp: 38 °C
Low Temp: 8 °C
Mean Temp: 25 °C
Precipitation: 70.6 mm Sun path diagram
Humidity: 65%
Dew Point: 17 °C
Wind: 3 km/h
Pressure: 1007 mbar
Visibility: 2 km
Soil: alluvial soil
SPILL PREVENTION AND CONTROL MEASURES

They have created a specific


platform for mixing
construction materials to
make mortar.
No specific prevention for rest
materials.
SOIL EROSION CONTROL MEASURES

Plantation - 2 huge mango tree is


located in the backside of site.
They are thinking to do gardening in
half of the site.
PARKING RELATED ASPECTS (PARKING FOOTPRINT, VISITOR
PARKING, ELECTRIC CHARGING)
The site is constructed 25 ft away from the main road.
The front area can be used for Bike parking.
Basement is created for car parking.
MEASURES TO MITIGATE HEAT ISLAND EFFECT

Ground coverage is only 50%.


The half area is used for plantation.
There is a forest area just behind the
site.
The temperature of the surrounding
area is lower than the temp of cities.
STORM WATER MANAGEMENT PLAN

Groundwater boring (150 ft)


Pumping centrifugal jet pump also
provided for construction of the first
floor.
BASIC FACILITIES FOR CONSTRUCTION WORKERS

Workers are from a nearby village (3 km).


They come at 9 am and go back near 5 pm
Have a break of 1 hour for lunch.
They are drinking direct boring water.
No sanitation facility.
Have a proper place for rest.
they are provided with proper breakfast in
the morning.
UHI MITIGATION MEASURES

Follow the tips they are taking to help reduce the heat island effect
and improve your community’s resilience to heatwaves.

Increase shade around the site.


Huge garden area.
The road to the site is wide and buildings
beside the site are not heightened, hence
the site receives much sunlight.
TRANSPORTATION PLAN PEDESTRIAN AND BICYCLE FRIENDLINESS

The main road connects it with the city.


Main Public Transport for the city is auto-
rickshaw and Bus.
There is no such footpath but having wide
mud path for pedestrians.

You might also like