Professional Documents
Culture Documents
Class : Class 1 - Cavite (Imus) and Laguna (Binan & Laguna Techno Park)
REFERENCE:
[1]
DO no. 22 Series of 2015: Revised Guidelines in the Preparation of Approved Budget for the Contructor (ABC)
[2]
DO no. 68 Series of 2016: Road Costruction Cost Estimation Manual
[3]
Standard Labor Rates for DPWH Regional/District Engineering Offices (Memorandum: January 7, 2019)
[4]
DO no. 137 Series of 2017 Cost Estimation Manual for Low Rise Buildings
Designation No. of Person/s No. of Hour/s Hourly Rate [3] Amount (Php)
A. Labor
Truck Mounted Crane (31 - 35 mt) for 3 floors and up 1 0.25 1,861.00 465.25
Dump Truck (12 yd3) 1 0.125 1,420.00 177.50
Cutting Outfit 1 0.25 45.45 11.36
Minor Tools (10% of Labor Cost) 23.01
REFERENCE:
[1]
DO no. 22 Series of 2015: Revised Guidelines in the Preparation of Approved Budget for the Contructor (ABC)
[2]
DO no. 68 Series of 2016: Road Costruction Cost Estimation Manual
[3]
Standard Labor Rates for DPWH Regional/District Engineering Offices (Memorandum: January 7, 2019)
[4]
DO no. 137 Series of 2017 Cost Estimation Manual for Low Rise Buildings
CAVITE-LAGUNA EXPRESSWAY PROJECT
Class 2 - Cavite (Dasmariñas, Trece Martires, General Trias) and Laguna (Sta. Rosa)
DETAILED UNIT PRICE ANALYSIS (DUPA) [2]
Designation No. of Person/s No. of Hour/s Hourly Rate [3] Amount (Php)
A. Labor
Truck Mounted Crane (31 - 35 mt) for 3 floors and up 1 1.000 1,861.00 1,861.00
Service Truck/Cargo Truck (2-5 mt) 1 1.000 783.00 783.00
Cutting Outfit 1 1.000 45.45 45.45
Minor Tools (10% of Labor Cost) 50.99
REFERENCE:
[1]
DO no. 22 Series of 2015: Revised Guidelines in the Preparation of Approved Budget for the Contructor (ABC)
[2]
DO no. 68 Series of 2016: Road Costruction Cost Estimation Manual
[3]
Standard Labor Rates for DPWH Regional/District Engineering Offices (Memorandum: January 7, 2019)
[4]
DO no. 137 Series of 2017 Cost Estimation Manual for Low Rise Buildings
CAVITE-LAGUNA EXPRESSWAY PROJECT
Class 2 - Cavite (Dasmariñas, Trece Martires, General Trias) and Laguna (Sta. Rosa)
DETAILED UNIT PRICE ANALYSIS (DUPA) [2]
Designation No. of Person/s No. of Hour/s Hourly Rate [3] Amount (Php)
A. Labor
Designation No. of Person/s No. of Hour/s Hourly Rate [3] Amount (Php)
A. Labor
Designation No. of Person/s No. of Hour/s Hourly Rate [3] Amount (Php)
A. Labor
Class 1: Bacoor, Imus, Biñan City, Laguna Techno Park, San Pedro, Cainta and Taytay
RESOURCE BASIC WAGE LABOR COST RATE PER
DESCRIPTION
CODE NO. DAILY MONTHLY FACTOR DAY
1 Foreman 720.00 18,780.00 1.80 866.40
2 Leadman 660.00 17,215.00 1.65 798.62
3 Heavy Equipment Operator 600.00 15,650.00 1.50 728.95
4 Highly Skilled Operator 600.00 15,650.00 1.50 728.95
5 Light Skilled Operator 560.00 14,606.67 1.40 680.02
6 Driver 520.00 13,563.33 1.30 631.84
7 Skilled Laborer 520.00 13,563.33 1.30 631.84
8 Semi-Skilled Laborer 480.00 12,520.00 1.20 583.67
9 Unskilled Laborer 400.00 10,433.33 1.00 487.33
Class 2:
Cavite City, Dasmariñas City, Tagaytay City, Trece Martires City, Carmona, General Trias, Rosario,
Cabuyao, Calamba City, San Pablo City, Sta. Rosa City, Los Baños, Sta. Cruz, Batangas City, LIMA
Technology, Lipa City, Tanauan City, Antipolo City, and Lucena City
RESOURCE BASIC WAGE LABOR COST RATE PER
DESCRIPTION
CODE NO. DAILY MONTHLY FACTOR DAY
1 Foreman 671.40 17,512.35 1.80 811.41
2 Leadman 615.00 16,052.99 1.65 748.17
3 Heavy Equipment Operator 45.00 14,593.63 1.50 679.46
4 Highly Skilled Operator 559.50 14,593.63 1.50 679.46
5 Light Skilled Operator 559.50 13,620.72 1.40 634.31
6 Driver 522.20 12,647.81 1.30 589.17
7 Skilled Laborer 484.90 12,647.81 1.30 589.17
8 Semi-Skilled Laborer 447.60 11,674.90 1.20 544.03
9 Unskilled Laborer 373.00 9,729.08 1.00 453.74
Class 3:
Kawit, Silang, Tanza, General Mariano Lavarez, Indang, Naic, Alfonso, Bauan, San Pascual, Santo
Tomas, Balayan, Calaca, Lemery, Mabini, Nasugbu, Rosario, San Jose, San Juan, Rodriguez, Tanay,
Angono, Binangonan, San Mateo, Pililia, Candelaria, Sariaya, and Tiaong
RESOURCE BASIC WAGE LABOR COST RATE PER
DESCRIPTION
CODE NO. DAILY MONTHLY FACTOR DAY
1 Foreman 662.40 17,277.60 1.80 801.32
2 Leadman 607.20 15,837.80 1.65 738.44
3 Heavy Equipment Operator 552.00 14,398.00 1.50 671.04
4 Highly Skilled Operator 552.00 14,398.00 1.50 671.04
5 Light Skilled Operator 515.20 13,438.13 1.40 626.46
6 Driver 478.40 12,478.27 1.30 581.88
7 Skilled Laborer 478.40 12,478.27 1.30 581.88
8 Semi-Skilled Laborer 441.60 11,518.40 1.20 537.30
9 Unskilled Laborer 368.00 9,598.67 1.00 448.14
Engineering Offices)
RATE PER
HOUR
101.43
93.52
84.93
84.93
79.29
73.65
73.65
68.00
56.72
RATE PER
HOUR
100.17
92.31
83.88
83.88
78.31
72.74
72.74
67.16
56.02
Factor of each Factor
Pay + Social Benefits