You are on page 1of 1

AMINES & PLASTICIZERS LTD, MUMBAI, INDIA

DRUM UNLOADING PROCEDURE

Drum Unloading Procedure


• Check the levels of Amine in the storage tank.
• Provide the Helmet, Hand Gloves, and Goggles, Mouth Mask, Safety shoes and filling
point bucket.
• Provide good ventilation and lighting in working areas.
• Use of Forklift, Drum Trolley for Loading / Unloading activity.
• Draw out sample from the drum and send it to laboratory for analysis and check for the
quality. Use clean Dip tube for sampling.
• Ensure product filled drums are neatly covered with clean Tarpaulin to avoid dust and
moisture on drums.
• Connect the Drum to the unloading pump with the proper hose.
• Remove the air lock from the pump by opening the pump vent.
• Start the pump and check the pressure in pressure gauge.
• Open the discharge valve of the pump slowly to transfer the material to the storage tank.
• After transfer of the liquid is completed, close the pump discharge valve and switch off
the pump.
• Disconnect the hose. Drain out the material.

CONFIDENTIAL
The information contained in this document is confidential and may not be disclosed to others or reproduced or used for any purpose
whatever, without the written consent of Amines & Plasticizers Ltd., INDIA.

You might also like