Professional Documents
Culture Documents
reviewer4@nptel.iitm.ac.in ▼
Unit 5 - Week
4
Course
outline
Week 4 Assignment 4
The due date for submitting this assignment has passed.
How to access As per our records you have not submitted this Due on 2018-09-12, 23:59 IST.
the portal assignment.
Week 2 a. Cooperation
b. Competition
Week 3
c. Codestruction
Week 4
No, the answer is incorrect.
Lecture 21 : Score: 0
Stakeholder
Accepted Answers:
Diaglogue
a. Cooperation
Lecture 22:
Management of 2) Stakeholder debate aims at: 1 point
Stakeholder
Diaglogue a. Cooperation
Lecture 23 : b. Competition
Planning of
CSR Activities: c. Codestruction
Responsibility
Paradigms No, the answer is incorrect.
Score: 0
Lecture 24 :
CSR Design Accepted Answers:
and b. Competition
Implementation:
Stakeholder 3) With reference to the level of engagement in stakeholder dialogue, when the views of all or 1 point
Integration most stakeholders are taken into account while making decisions, the level of inclusion is
Lecture 25 :
CSR Design a. High
and
Implementation:
b. Low
Stakeholder
No, the answer is incorrect.
Integration
(Contd.) Score: 0
Accepted Answers:
Week 4 : © 2014 NPTEL - Privacy & Terms - Honor Code - FAQs -
Lecture a. High
A project of In association with
Material
4) With reference to the level of engagement in stakeholder dialogue, when one position has 1 point
Feedback for priority over all the others, the level of tolerance is
Week 4
Funded by
Quiz : Week 4 a. High
Assignment 4 Powered by
b. Low
Week 5
No, the answer is incorrect.
Score: 0
Week 6
Accepted Answers:
Week 7 b. Low
5) With reference to the legal domain in the intersecting circle paradigm of corporate 1 point
Week 8
responsibility, opportunistic compliance could result in:
Download
Videos a. Changing operating regions to those with less stringent laws
7) With reference to the factors affecting stakeholders’ potential for threat and cooperation, if a 1 point
stakeholder controls key resources, the potential threat he poses to the organization
a. Increases
b. Decreases
8) With reference to the factors affecting stakeholders’ potential for threat and cooperation, if a 1 point
stakeholder is less powerful than the organization, his potential for cooperation with the organization
a. Increases
b. Decreases