A-QAC-PRO-730-38944 MONITORING AND MEASURING EQUIPMENT CONTROL PROCEDURE A-MTL-PRO-730-38931 pWPS FOR COLUMN PIPE TO COLUMN PIPE AND 10 INCH DIA. PIPE TO PIPE WELDING WITH GTAW + SMAW PROCESS A-MTL-PRO-730-38932 pWPS FOR STAINLESS STEEL PIPING OF <2" WITH GTAW PROCESS A-MTL-PRO-730-38933 pWPS FOR STAINLESS STEEL PIPING OF >2" WITH GTAW+SMAW PROCESS A-MTL-PRO-730-38934 pWPS FOR STAINLESS STEEL TO CARBON STEEL MATERIAL WELDING WITH GTAW PROCESS A-MTL-PRO-730-38935 pWPS FOR STAINLESS STEEL TO CARBON STEEL MATERIAL FILLET WELDING WITH SMAW PROCESS A-MTL-PRO-730-38936 PQR FOR CROWN TO PETAL AND PETAL TO PETAL WELDING WITH SMAW PROCESS A-MTL-PRO-730-38937 PQR FOR COLUMN PIPE TO COLUMN PIPE AND 10 INCH DIA. PIPE TO PIPE WELDING WITH GTAW + SMAW PROCESS A-MTL-PRO-730-38938 PQR FOR STAINLESS STEEL PIPING OF <2" WITH GTAW PROCESS A-MTL-PRO-730-38939 PQR FOR STAINLESS STEEL PIPING OF >2" WITH GTAW+SMAW PROCESS A-MTL-PRO-730-38940 PQR FOR STAINLESS STEEL TO CARBON STEEL MATERIAL WELDING WITH GTAW PROCESS A-MTL-PRO-730-38941 PQR FOR STAINLESS STEEL TO CARBON STEEL MATERIAL FILLET WELDING WITH SMAW PROCESS A-MTL-PRO-730-38942 WPS FOR CROWN TO PETAL AND PETAL TO PETAL WELDING WITH SMAW PROCESS A-MTL-PRO-730-38943 WPS FOR COLUMN TO BASE PLATE, CROSS BRACING AND NOZZLE ASSEMBLY WELDING WITH SMAW PROCESS A-MTL-PRO-730-38944 WPS FOR COLUMN PIPE TO COLUMN PIPE AND 10 INCH DIA. PIPE TO PIPE WELDING WITH GTAW + SMAW PROCESS A-MTL-PRO-730-38945 WPS FOR STAINLESS STEEL FILLET WELDS WITH SMAW PROCESS A-MTL-PRO-730-38946 WPS FOR STAINLESS STEEL PIPING OF <2" WITH GTAW PROCESS A-MTL-PRO-730-38947 WPS FOR STAINLESS STEEL PIPING OF >2" WITH GTAW+SMAW PROCESS A-MTL-PRO-730-38948 WPS FOR STAINLESS STEEL TO CARBON STEEL MATERIAL WELDING WITH GTAW PROCESS A-MTL-PRO-730-38949 WPS FOR STAINLESS STEEL TO CARBON STEEL MATERIAL FILLET WELDING WITH SMAW PROCESS A-QAC-CER-730-38928 WELDER/ WELDING OPERATOR QUALIFICATIONS A-CON-PRO-730-38930 PROCEDURE FOR ERECTION AND TESTING OF SITE ERECTED 3 CS STORAGE TANKS & SPHERES BY CONVENTIONAL A-CMM-PRO-730-38926 METHOD SITE (if applicable) ACCEPTANCE TEST PROCEDURE A-QAC-PRO-730-38945 MATERIAL IDENTIFICAITON AND TRACEABILITY PROCEDURE A-QAC-PRO-730-38946 BASE LINE THICKNESS MEASUREMENT PROCEDURE A-QAC-MAN-730-38928 CONSTRUCTION RECORD BOOK A-CON-PRO-730-38931 SPHERE MATERIAL LIFTING PROCEDURE (includes lifting beam, frame, slings) A-RHU-ORG-730-38926 CVS OF KEY PERSONNEL A-RHU-ORG-730-38927 ALL INSURANCES (WORKMEN’S COMPENSATION, PLANT, CONSTRUCTION EQUIPMENT AND ALL RISKS A-PLN-SCH-730-38928 INSURANCE, L4 SCHEDULEMOTOR VEHICLE INSURANCE WITH COMPLETE PLANNING INCLUDING THIRD PARTY PACKAGE INCLUDING AND PASSENGER RESOURCE LOADING LIABILITY, ETC.) A-CON-PRO-730-38932 MS FOR ERECTION & WELDING OF SPHERICAL TANKS (730-TK-03 A/B & C) A-CON-PRO-730-38933 MS FOR ERECTION & WELDING OF NOZZLES (730-TK-03 A/B & C) A-CON-PRO-730-38934 MS FOR ERECTION & WELDING OF STAIRWAY ACCESS AND TOP PLATFORM A-CON-PRO-730-38935 MS FOR ERECTION OF SCAFFOLDING ACCESS PLATFORM FOR BLASTING, PAINTING & INSULATION WORKS A-CON-PRO-730-38936 MS FOR STRUCTURAL ERECTION OF SUPPORT COLUMN & DIAGONAL BRACINGS A-CON-PRO-730-38937 MS FOR ERECTION OF INSULATION WORKS OF SPHERICAL TANKS (730-TK-03 A/B & C) A-CON-PRO-730-38938 MS FOR BLASTING AND PAINTING OF SPHERICAL TANKS (730-TK-03 A/B & C) A-CON-PRO-730-38939 MS FOR HYRDO PNEUMATIC TESTING OF SPHERICAL TANKS (730-TK-03 A/B & C) A-CON-PRO-730-38940 MS FOR ERECTION OF SPHERICAL TANKS INTERNAL PIPING A-CON-PRO-730-38941 MS FOR HYDROTEST OF INTERNAL PIPING CONNECTIONS & FIRE FIGHTING SYSTEM A-CON-PRO-730-38942 MS FOR ERECTION AND WELDING OF SPHEROCAL TANKS FIRE & FIGHTING SYSTEM A-PLN-PLN-730-38926 MANPOWER MOBILIZATION PLAN A-QAC-PLN-730-38926 PROJECT QUALITY PLAN FOR SPHERE CONSTRUCTION A-QAC-PRO-730-38926 PROCEDURE FOR CALIBRATION OF WELDING EQUIPMENTS A-MTL-PRO-730-38931 PROCEDURE FOR WELDING CONSUMABLE CONTROL A-MTL-PRO-730-38932 INSPECTION AND TEST PLAN FOR INSTALLATION AND TESTING OF SPHERES A-MTL-PRO-730-38933 WELDING REPAIR PROCEDURE A-MTL-PRO-730-38934 PICKLING AND PASSIVATION PROCEDURE A-CST-PRO-730-38926 INVOICING AND PAYMENT PROCEDURE A-PLN-SCH-730-38926 OVERALL SPHERE SCHEDULE - PDF A-PLN-SCH-730-38927 OVERALL SPHERE SCHEDULE - EXCEL A-MTL-PRO-730-38927 pWPS FOR CROWN TO PETAL AND PETAL TO PETAL WELDING WITH SMAW PROCESS A-MTL-PRO-730-38928 MATERIAL CONTROL AND TRACEABILITY PROCEDURE A-QAC-PRO-730-38928 WELDING CONTROL PROCEDURE A-MTL-PRO-730-38929 WELD LOCATION PLAN A-QAC-PRO-730-38930 HYDROSTATIC TESTING AND DRYING PROCEDURE OF SPHERES A-QAC-PRO-730-38931 PROCEDURE FOR SPHERE CALIBRATION A-QAC-CER-730-38926 NDE OPERATOR QUALIFICATIONS A-CMM-PRO-730-38926 GALVANISING REPAIR PROCEDURE FOR STRUCTURAL STEEL COMPONENTS A-MTL-PRO-730-38930 SURFACE PREPARATION AND PAINTING PROCEDURE A-QAC-PRO-730-38937 PROCEDURE FOR RADIOGRAPHY TESTING (RT) A-QAC-PRO-730-38938 PROCEDURE FOR MAGNETIC TESTING (MT) A-QAC-PRO-730-38939 PROCEDURE FOR ULTRASONIC TESTING (UT) (if applicable) A-QAC-PRO-730-38940 PROCEDURE FOR PENETRANT TESTING (PT) A-QAC-PRO-730-38941 PROCEDURE FOR HARDNESS TESTING (HT) A-QAC-PRO-730-38942 PROCEDURE FOR POSITIVE MATERIAL IDENTIFICATION (PMI) A-QAC-CER-730-38927 MATERIAL,WELDING AND NDE TEST SUMMARY OF COMPLETE SPHERE A-QAC-DOS-730-38927 ARH FINAL DOSSIER A-LGT-PRO-730-38927 PRESERVATION PROCEDURE A-CON-PRO-730-38929 CONSTRUCTION METHOD STATEMENT A-PLN-MRE-730-38927 MONTHLY PROGRESS REPORT A-HSE-PRO-730-38926 PLANT & EQUIPMENT SAFETY PROCEDURE A-HSE-PRO-730-38928 GROUND DISTURBANCE PROCEDURE A-HSE-PRO-730-38929 MANAGEMENT OF HSSE RECORDS A-HSE-LST-730-38926 DRUM ROLLER PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38927 EXCAVATOR PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38928 FORKLIFT PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38929 MANLIFT PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38930 MOBILE CRANE PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38931 SCISSOR LIFT PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38932 SIDE BOOM PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38933 SKID STEER LOADER PRE-USE INSPECTION CHECKLIST A-HSE-LST-730-38934 WHEEL LOADER PRE-USE INSPECTION CHECKLIST A-HSE-PLN-730-38926 HSSE MANAGEMENT PLAN A-LGT-PRO-730-38929 LAND TRANSPORT MANAGEMENT PROCEDURE A-HSE-PRO-730-38930 RISK ASSESSMENT PROCEDURE