INSPECTION REPORT

INSULATION CHECK
Subcontractor

Refernce QCP No Report n°:

Test Notification n°: Date

LINE DATA
REF DWG / ISO SYSTEM LINE / EQUIPMENT

INSULATION DATA

REF INSULATION SPEC :


INSULATION MATERIAL/ DENSITY:

INSULATION TYPE: COLD HOT ACOUSTIC

METAL JACKETING TYPE:


INSULATION CHECK
RESULT (*)
ACTIVITY INSPECTION DATA AND SIGNATURE
C NC NA

PRESSURE TEST CLEARANCE CHECK


SURFACE CLEANING CHECK
PRELIMINARY INSPECTION
SURFACE TREATMENT COMPLET. CHECK

THICKNESS / DENSITY CHECK

APPLICATION CHECK (see typical dwg)

INSULATION ERECTION FASTENING CHECK


OVERLAPPING CHECK
Vapor barrier check (if required)
THICKNES
THICKNESS CHECK
APPLICATION CHECK (see typical dwg)
FASTENING AND BAND/SCREW SPACING CHEC K
METAL JACKETING ERECTION fixing and sealing/weather proofing
Cladding long. seam orientation correct check

OVERLAPPING CHECK
Application of aluminum foil for SS piping and
Aluminum foil for SS piping and equipment
equipment

CML's windows/covers CML's windows/covers check


FINAL ACTIVITY COMPLETION CHECK
Remarks:

Conform Test instrument used


NOT Conform Report No TAG No

INSPECTORS CERI GAMA CONSORTIUM STEG


Name :
Signature:
Date :
IN-01.00