You are on page 1of 1
Recommendation: ‘Based on our review and analysis ofthe atonal cadngs, hte she summary of eur recommendation based onthe infomation proved. 1.) Two (2) Operable Wats located atthe 6 Flor (Reterto $1, $2 and $5) ‘Operable Wal 1 Is leates near Grid N under 10 foc es. We provided stet beams to be chemicaly anchored tothe exsing 10° floor conciete beams. The ‘super can atach by welding er ting nel suspension system the provided steel beam. Refer tothe Brochure under suspension sytem in page, (Operable Wl 2i cated along Grid P dry under the {0 oor existing beam But we proved steal beam under our existing bear tobe chemlaty anchored othe ‘xing cals and we also consider the requted clearances from the provided ravings and supple’ specications. This stoi the anchoring to the existing concrete beam. Same wth Operable Wal 1, supple’s suspension syste can be weed or baled othe proved steel bean, We also considered te provided flow of tho operable wal o reduce the ledng consideration on he afected beams. Forte chemical anchor, you can use Hit or Flcher or oer brands ut subrt specfeaons for approval. uring intalation, before ering, use rebar scam to ensure thatthe exiting rebars wl be avoid 2) Revohing Doors located a 9 to 12° Flor (Refer to $10 $4 and $6) Revohing Doors located a 9 to 12 Foor ware drecty under er near the exstng boam except forthe revoWng der at 9 Feor near Gi K and 6, For the revoting {0 58 forthe load cnsieraton to be uss bythe CFRP supper inthe analyse) 1.8. Based on the provided speceaton, the revolving deo it stand alone wth space above the see casng fr maintenance. Forte chemical anchor, you can use Hit or Fischer or other brands but eutmnt specications for approval. During instalation, before cillng, use rebar scanner 19 ensure that ne existing rebars willbe avolee. =

You might also like