SouthGasCompressionPlant(SGCP)PipelineProject
CONTRACT#6600042366,BI-10-01996-0006
Saipem Aramco Contract StatusOF StatusOF
PipelineTyp Date of Time of LineTag/Locat ItemTagNo. Drawing No PMT
Sl.No. ContractorRFIN0 EPMRFINo. Location Discipl. SATIP # Activity # SAIC # DescriptionofActivity Insp. Insp. or /Sub PID Insp. Status HardCop ScanCop Remarks
e Inspection Inspection ion & Rev# Insp.
Level Level Con Insp y y
SECURITY TINAT-GGM- TINANT Compaction Testing(FDT) Inspection of select fill RE-SCH. DUE TO
FCC-SGCP-CIV- SUPPORT 4th layer (Final) select fill materials under the grade Angelo / Edgardo Mohamm
1 00203
1401517220 N/A 25-Sep-21 1:30 PM
BUILDING
TINAT GGM 150528-001- CIV SATIP-A-114-01 3.2 SAIC-A-1005 T150528002
Slab at the grid line A-B/1-5 for Security Support
W W
Ziaul Haq Bangco ed I Khan
WORK PERMIT
BLDG-D84 V0F2 ISSUED
(SSB) Building , TINAT-GGM
SECURITY
FCC-SGCP-CIV- SUPPORT MDRK RH-B- TA151762- Anti Termite Treatment application inspection Angelo / Edgardo Mohamm
2 00205
N/A 25-Sep-21 9:00 AM
BUILDING
MDRK RH-B 151762-001- CIV ITP-BLDG-001 2.1 IC-BLDG-02
002-V0F2B
under the grade Slab at the grid line A-B/1-5, I W
Ziaul Haq Bangco ed I Khan
(SSB) BLDG-D83 Security Support Building , MIDRIKA RH-B