THREE PHASE FAULT ANALYSIS WITH AUTO RESET

FOR TEMPORARY FAULT AND TRIP FOR


PERMANENT FAULT.
Bhawna Gupta1,Aatif Yousuf Wani2,Shakir Shafi3, Danish Maqbool Naik4,
Mohd Hussain Para5,Rayees Yousuf6,
1
Assistant Professor, Electrical Engg. Department, GCET Jammu
2,3,4,5,6
Students, Electrical Engg. Department, Gcet Jammu

ABSTRACT negligible disturbance it will turn the system in


semi-permanent fault. Semi-permanent fault
Two types of faults occur in any electrical occurs in forested area. Permanent fault does not
power system temporary fault and permanent clear on tripping & reclosing. The designed
fault. They cause problems such as over mechanism can resolve temporary fault by
voltage, over current, insulator failure. This letting fault arc to de energize, and then it
fault damages the transmission system. automatically recloses the line to restore service.
Various equipments such as circuit breaker, Accordingly, this mechanism can significantly
relays, transformers etc can get severely reduce the outage time due to faults and provide
damaged. Faults such as LG,LLG,LL,LLLG a higher level of service durability to the
occur in power system and to get clearance of customer. However for permanent faults this
these fault circuit breaker is used which mechanism will keep system in tripped
disconnects the line. It will remain condition until the fault is cleared.
disconnected, for reclosing the circuit this
mechanism resets the supply line after small Types of Faults in Power System
interruption if temporary fault occurs or it
The fault in the power system is mainly
will remain in tripped condition if fault is
categorized into two types they are
permanent.
Open Circuit Fault
KEYWORDS: 555 Timer, Relays, Comparator,
Transformer (220 V– 12V AC) Short Circuit Fault.
I INTRODUCTION 1. Open Circuit Fault
Transient fault and permanent fault are two The open circuit fault mainly occurs because of
types of faults which occur in a power system. the failure of one or two conductors
Among them the transient fault is for short
duration which occur due to swinging wires, The open circuit fault is categorized as
little time contact with other conducting
 Open Conductor Fault
components& insulator flashover etc. This is
 Two conductors Open Fault
cleared by immediate tripping of circuit breakers
 Three conductors Open Fault
to isolate the fault. Lightning is one of the most
2. Short-Circuit Fault
common causes of transient fault. The transient
fault vanisheswithin few seconds. On the In this type of fault, the conductors of the
otherhand permanent fault occur for longer different phases come into contact with each
period of time. Disturbance on line can cause other with a power line, power transformer or
semi-permanent fault i.e. if there is small or any other circuit element due to which the large
current flow in one or two phases of the system. III. WORKING PRINCIPLE
The short-circuit fault is divided into the
A total of six transformers are used in this
symmetrical and unsymmetrical fault.
project for the conversion 230V12V. In order to
Symmetrical fault energize the whole circuit for the analysis of
three phase fault, a low voltage of value equal to
The faults which involve all the three phases is
12 volts is used. Of all the six transformers, the
known as the symmetrical fault. The faults
primary of all six transformers are connected in
which involve all the three phases is known as
star configuration and out of the rest six
the symmetrical fault i.e. LLLG fault
secondary’s the secondary of three transformers
unsymmetrical fault are connected in star and that of the remaining 3
transformers are in delta in order to get LL and
The fault gives rise to unsymmetrical current, LG faults ,i.e. line to line and line to ground
i.e., current differing in magnitude and phases in fault respectively.DC voltage is obtained by first
the three phases of the power system are known rectifying and secondly filtering,the output of all
as the unsymmetrical fault. IT include LG LL, the transformers individually. After this,this
LLG, LLL output i.e. DC voltage is given to six relays. For
II. LITERATURE REVIEW LL or LG fault i.e. line to line or line to ground
fault. A total of six push buttons are connected
Two types of faults occur in a power system across the relay coil. All the points which are
transient fault and permanent fault. To prevent common to the relay are grounded all the six NC
equipment from damage due to fault, protection contacts of the six relays are connected in
is the most important requirement in electrical parallel,now these parallel connected points are
power system. The temporary fault vanishes if connected to the second pin of IC 555 timer.
the line is separated from system suddenly. After With the help of 10Kohm resistor,this is
the arc is completely de-energized the line can connected in mono-stable (timer1) mode. Now
be reclosed to restore normal service. It is the output of this 555 IC is given to another
observe from experiments that about 80% of same IC i.e 555 IC timer which operates in
fault is cleared after the 1st trip. 10% stay in for astable (timer2) mode. For knowing the status of
the second reclosed made after a time delay. The each IC 555,each is connected to LEDs.
3% required for 3rd reclosed and approximately
7% fault is permanent in nature and results in
lock out of the reclosing relay.To tackle this, a
mechanism is built which can easily detect the
faults and automatically disconnects the supply
to avoid large damages to the control grid
substations. In this mechanism three 1phase
transformers are connected in star inputs and star
outputs and three 1phase transformers are
connected in delta in which input is of 230V and
output is of 12V.to tolerate short duration faults
555 timer is used. The switches are used to
create line to line and line to ground fault. In the
low voltage side for activating the tripping
mechanism short duration fault return the supply Operational amplifier LM358 whose input pin
immediately to the load i.e. called as temporary non inverting one is now fed with output from
trip while long duration will result in permanent the second IC. On the other hand, the inverting
trip.
pin, i.e pin22 of the operational amplifier is
connected to fix the voltage to preset to potential
divider. The voltage coming out from the
voltage divider at the pin number 2 is fixed in
such a way thatt it exceeds pin number 3 i.e non
inverting of operational amplifier which is used
as comparator in order that pin number one
gives 0 logic that doesn't succeed to operate the
relay with the help of driver transistor. The relay
which is used to disconnect the load is "3CO
relay"

IV.OPERATION
The common point of all six relay coils
disconnect from NC and moves to the NO
points, when each ch of the relay get DC Voltage,
On application of three phase supply to the
board. Pin number 02 of timer 1 is provided with
high voltage. On pressing any push button the active situation for very long duration to the
common contacts moves to the NC on providing timer-2.
2. Due to this longer active input the
logic low at trigger pin IC 555 i.e. timer-1.
timer As a output of timer-22 (astable state) from pin number
result of it, it develops an output at pin number 03 starts charging capacitor C via resistor R in
03.Timer-2 2 which is used in astable
asta mode is order that the output of comparator goes high.
given with this output. On providing the output These output drives the 3CO relay permanently
of timer-1 to timer-2. In timer-2,the
,the RESET pin switch ON and disconnect the loadconnected to
goes to high which is indicated by flashing LED. its NC contacts. For energizinging the above circuit
For temporary fault i.e. when we press push voltage regulator IC 7805 is used which give
button and release them immediately the timer-1 12V and 5V DC.
(mono-stable state) disables timer-2
timer outputs
which goes to zero.If any on the push button is
pressed for longer duration the timer-1
timer (mono-
stable state) output provides
V.COMPONENTS
The components that are used in this project
are follows:-

Transformer
This system is built using three single phase
transformers which are wired in star input and
star output, and 3 transformers are connected in
delta connections, having input 220 volt and
output at 12 volt
Timer
The 555 Timer is an integrated circuit
implementing a variety of timer &multi-vibrator
&multi
applications. Depending on the manufacturer,
manuf
the standards 555 package includes over 20
transistors, 2 diodes & 15 resistors on a silicon
chip installed in an 8-pin
pin mini dual-in-line
dual
package.

VI. CONCLUSION AND ANALYSIS


In order to develop automatic tripping
mechanism for three phase transient fault and
permanent faults this project is desig designed.
Transient faults remains for short duration so
this project gives ann effective mechanism for
reclosing
sing the circuit, hence this project helps in
Voltage regulator providing reliable supply to the costumers. Also
The LM78XX/LM78XXA series of three for permanent faultslts this mechanism provide
terminal positive regulators are available. Each permanent tripping
pping hence protects the
type employs internal current limiting, thermal equipments from getting damaged
shut down and safe operating area protection,
FUTURE SCOPE
making it essentially indestructible.If adequate
This project can be extended to develop a
heat sinking is provided they can deliver over
mechanism to send message to the authorities
1A output current. These devices can be used
via SMS by interfacing GSM module.
with external component
mponent to obtain adjustable
voltage and current.In In this project we used
voltage regulator IC 7805 to provide fix voltage REFERENCE
to IC circuit it has 3 pin 1] S.Bakanagari1,A.M.Kumar,
gari1,A.M.Kumar, M.
Cheenya, ‘Three Phase Fault
Comparator Analysis with Auto Reset for
A comparator is an electronic circuit, which Temporary Fault and Trip for’,
compares the two inputs that are applied to it Permanent Fault, November 2013
and produces an output. The output value of the
comparator indicates which of the inputs is 2] International Journal for scientific
greater or lesser. research & Development
Development\ Vol. 3,
Issue 01, 2015 \ ISSN (online):
2321-0613,
0613, “Auto Reset and
VI. HARDWARE Tripping Technique for Temporary
and Permanent Fault Analysis”.
3] http://en.wikipedia.org/wiki/Earth_
leakage_circuit_breaker “Elektron”
4] D. C. Yu, D. Chen, S. Ramasamy
and D. G. Flinn, “A Windows
Based Graphical Package for
Symmetrical Components
Analysis”, IEEE Transactions on
Power Systems, Vol. 10, No. 4, pp
1742-1749, November 1995.

5] Jun Zhu. “Analysis of


Transmission System Faults the
Phase Domain”, Texas A&M
University. Master Thesis, 2004.
6] J.F.Sayyad, “analysis and
automatic rest of 3phase fault” ,
IJAREEIE, , 3march 2016

7] HAVRAN, F.J. 1999.” Fault


investigation on power
transmission system”. ESKOM.
Internal document: 38, 96-
99KELLER, P. 1998. Correct fault
analysis. Eskom internal
document.