392.00
0.30
XII
391.625
0.800
IX
0.30 0.50
391.13
VIII
1.0 1.0
9.57
2.83
XI 8
I
V
III
B
381.556
1.0
1.0
0.6 VI II
IV
380.956
0.6 X
380.356
0.60 VII A
379.756
7.300
3
RL of Formation = 392.0 DESNISTY OF SOIL 1.8 T/met
RL of Foundation = 379.8 Effictive SPAN IN MET 7.980
Use Plain Concrete, Density = 2.5 T/met3
Assume LWL at Footing Level
WIDTH OF BRIDGE IN MET = 12.000
SBC REQUIRED = 29.7 T/met2
Page 3
A OVERTURNING
1759.1 7675.7
TOTAL
VOLUME OF CONCRETE
= L X B X D
= 4.0 X 12.0 X 0.80
= 38.3 2.5 95.8 2.750 263.3
Page 4
4.6
Total Load for IRC Class 'AA' Loading in Ton = 70.0 Ton
Point of Application of Load from Right Support 5.945 met
Left Reaction in Ton (R) = 52.1 56.0 2.750 154.0
Reaction from STAAD IN Ton= 56.0
25% IMPACT LADING
h1 = 6.0340
F1
F2
h2 = 5.8350
F3
Pa2 Pa1
3.123 3.229
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 11.869
Pa
0.642
0.108
Fv = 96.1 X = 35.0 TON
0.297
8877.5 SAFE
F.O.S. = = 4.7 > 2.0
1906.0
9294.9 SAFE
F.O.S. = = 4.1 > 2.0
2282.5
9550.2 SAFE
F.O.S. = = 3.35 > 2.0
2854.6
FV X 0.6
F. S. =
FH
1.0
ZXX = X 12.0 X 7.300 X 7.300 = 106.6 MET3
6.0
FV M 1923.7 50.1
QMAX = + = + = 22.4 T/MET2
A ZXX 87.6 106.6
FV M 1923.7 50.1
QMIN = - = - = 21.5 T/MET2
A ZXX 87.6 106.6
FV M 2075.5 186.7
QMAX = + = + = 25.4 T/MET2
A ZXX 87.6 106.6
FV M 2075.5 186.7
QMIN = - = - = 21.9 T/MET2
A ZXX 87.6 106.6
FV M 2110.5 601.8
QMAX = + = + = 29.7 T/MET2
A ZXX 87.6 106.6
FV M 2110.5 601.8
QMIN = - = - = 18.4 T/MET2
A ZXX 87.6 106.6
Page 9
1.0 DIRT WALL 12.00 0.30 0.50 2.50 4.50 1.750 7.88
2.0 ABUTMENT CAP 12.00 0.80 0.50 2.50 12.00 1.500 18.00
3.0 RECTANGULAR AREA (I) 12.00 0.80 9.069 2.50 217.66 1.500 326.48
4.0 TRIANGULAR AREA (III) 12.00 1.100 9.069 2.50 149.64 0.733 109.73
5.0 TRIANGULAR AREA (V) 12.00 3.200 9.069 2.50 435.31 2.967 1291.43
6.0 EARTH OVER WALL TRA.PORTION(VIII)12.00 3.200 9.069 1.80 313.42 4.033 1264.15
7.0 EARTH OVER WALL REC.PORTION (IX)12.00 3.200 1.00 1.80 69.12 3.500 241.92
8.0 EARTH OVER WALL REC.PORTION (XI)12.00 0.800 10.069 1.80 173.99 5.500 956.96
9.0 APPROACH SLAB REC.PORTION (XII) 12.00 3.500 0.30 2.50 31.50 3.900 122.85
1407.1 4339.4
TOTAL
VOLUME OF CONCRETE
= L X B X D
= 4.0 X 12.0 X 0.8
= 38.3 2.5 95.76 1.350 129.3
Page 10
4.6
Total Load for IRC Class 'AA' Loading in Ton = 70.0 Ton
Point of Application of Load from Right Support 5.9 met
Left Reaction in Ton (R) = 52.1 56.0 1.4 75.6
h1 = 6.034
F1
F2
h2 = 4.035
F3
Pa2 Pa1
2.159 3.229
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 10.069
Pa
0.642
0.108
Fv = 77.6 X = 29.9 TON
0.297
1.0
ZXX = X 12.0 X 5.1 X 5.1 = 52.0 MET2
6.0
FV M 1525.6 118.7
QMAX = + = + = 27.2 T/MET2
A ZXX 61.2 52.0
FV M 1525.6 118.7
QMIN = - = - = 22.6 T/MET2
A ZXX 61.2 52.0
FV M 1677.4 300.8
QMAX = + = + = 33.2 T/MET2
A ZXX 61.2 52.0
FV M 1677.4 300.8
QMIN = - = - = 21.6 T/MET2
A ZXX 61.2 52.0
FV M 1707.3 615.2
QMAX = + = + = 39.7 T/MET2
A ZXX 61.2 52.0
FV M 1707.3 615.2
QMIN = - = - = 16.1 T/MET2
A ZXX 61.2 52.0
Page 14
391.89
XII
391.39
VIII
1 1
9.834
3.4
XI 10
I
V
III
B
381.56
1
II 1
0.600 VI
IV
380.96
0.600 X
380.36
0.600 VII A
379.76
6.600
A OVERTURNING
126.864 501.763
TOTAL
h1 = 5.799
F1
F2
h2 = 5.835
F3
Pa2 Pa1
3.123 3.103
Page 16
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 11.63
Pa
0.642
Page 17
0.108
Fv = 7.471 X = 2.860 TON
0.297
588.765 SAFE
F.O.S. = = 3.936 > 2.0
149.580
607.638 SAFE
F.O.S. = = 3.109 > 2.0
195.436
FV X 0.600
F. S. =
FH
Page 18
1
ZXX = X 1.000 X 6.600 X 6.600 = 7.260 MET2
6
FV M 140.0 22.97
QMAX = + = + = 24.38 T/MET2
A ZXX 6.600 7.260
FV M 140.0 22.97
QMIN = - = - = 18.06 T/MET2
A ZXX 6.600 7.260
FV M 142.9 59.39
QMAX = + = + = 29.83 T/MET2
A ZXX 6.600 7.260
FV M 142.9 59.39
QMIN = - = - = 13.47 T/MET2
A ZXX 6.600 7.260
Page 19
B OVERTURNING
1 RECTANGULAR AREA (I) 1.000 0.500 9.834 2.500 12.292 1.250 15.366
2 TRIANGULAR AREA (III) 1.000 1.000 9.834 2.500 12.292 0.667 8.195
3 TRIANGULAR AREA (V) 1.000 2.900 9.834 2.500 35.648 2.467 87.932
100.686 268.369
TOTAL
h1 = 5.799
F1
F2
h2 = 4.035
F3
Pa2 Pa1
2.159 3.103
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 9.834
Pa
0.642
Page 21
0.108
Fv = 6.701 X = 2.439 TON
0.297
309.811 SAFE
F.O.S. = = 3.409 > 2.0
90.872
320.542 SAFE
F.O.S. = = 2.629 > 2.0
121.924
FV X 0.600
F. S. =
FH
Page 22