413.67
0.30
XII
413.30
0.800
IX
0.30 0.50
412.80
VIII
1.0 1.0
4.127
2.69
XI 12
I
V
III
B
408.669
1.0
1.0
0.6 VI II
IV
408.069
0.6 X
407.469
0.60 VII A
406.869
3.65
VOLUME OF CONCRETE
= L X B X D
= 4.0 X 12.0 X 0.80
= 38.4 2.5 96.0 1.450 139.2
Page 4
4.6
h1 = 5.052
F1
F2
h2 = 1.375
F3
Pa2 Pa1
0.818 3.004
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 6.427
Pa
0.714
2
Pa = 0.297 x 2.0 x 1.2 = 0.714 T/met
0.108
Fv = 60.2 X = 21.9 TON
0.297
1371.0 SAFE
F.O.S. = = 3.8 > 2.0
356.4
1591.4 SAFE
F.O.S. = = 2.7 > 2.0
580.4
1671.3 SAFE
F.O.S. = = 2.15 > 2.0
775.9
FV X 0.6
F. S. = FH
1.0
ZXX = X 12.0 X 3.650 X 3.650 = 26.6 MET3
6.0
FV M 581.7 47.0
QMAX = + = + = 15.0 T/MET2
A ZXX 43.8 26.6
FV M 581.7 47.0
QMIN = - = - = 11.5 T/MET2
A ZXX 43.8 26.6
FV M 733.7 104.0
QMAX = + = + = 20.7 T/MET2
A ZXX 43.8 26.6
FV M 733.7 104.0
QMIN = - = - = 12.8 T/MET2
A ZXX 43.8 26.6
FV M 755.6 240.8
QMAX = + = + = 26.3 T/MET2
A ZXX 43.8 26.6
FV M 755.6 240.8
QMIN = - = - = 8.2 T/MET2
A ZXX 43.8 26.6
Page 9
1.0 DIRT WALL 12.00 0.30 0.50 2.50 4.50 0.950 4.28
2.0 ABUTMENT CAP 12.00 0.80 0.50 2.50 12.00 0.700 8.40
3.0 RECTANGULAR AREA (I) 12.00 0.80 3.627 2.50 87.05 0.700 60.93
4.0 TRIANGULAR AREA (III) 12.00 0.300 3.627 2.50 16.32 0.200 3.26
5.0 TRIANGULAR AREA (V) 12.00 1.350 3.627 2.50 73.45 1.550 113.84
349.3 513.0
TOTAL
VOLUME OF CONCRETE
= L X B X D
= 4.0 X 12.0 X 0.8
= 38.4 2.5 96.00 0.550 52.8
Page 10
4.6
h1 = 5.052
F1
F2
h2 = -0.425
F3
Pa2 Pa1
-0.253 3.004
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 4.627
Pa
0.714
2
Pa = 0.297 x 2.0 x 1.2 = 0.714 T/met
0.108
Fv = 39.6 X = 16.3 TON
0.297
1.0
ZXX = X 12.0 X 2.5 X 2.5 = 12.0 MET2
6.0
FV M 377.1 38.5
QMAX = + = + = 16.0 T/MET2
A ZXX 29.4 12.0
FV M 377.1 38.5
QMIN = - = - = 9.6 T/MET2
A ZXX 29.4 12.0
FV M 529.1 141.1
QMAX = + = + = 29.7 T/MET2
A ZXX 29.4 12.0
FV M 529.1 141.1
QMIN = - = - = 6.2 T/MET2
A ZXX 29.4 12.0
FV M 545.4 212.8
QMAX = + = + = 36.3 T/MET2
A ZXX 29.4 12.0
FV M 545.4 212.8
QMIN = - = - = 0.8 T/MET2
A ZXX 29.4 12.0
Page 14
413.48
XII
412.98
VIII
1 1
4.311
3.3
XI 14
I
V
III
B
408.669
1
II 1
0.600 VI
IV
408.069
0.600 X
407.469
0.600 VII A
406.869
3.325
A OVERTURNING
9 SLAB RECTANGULAR PROTION (X) 1.000 2.725 0.600 2.500 4.088 1.663 6.795
h1 = 4.736
F1
F2
h2 = 1.375
F3
Pa2 Pa1
0.736 2.535
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 6.111
Pa
0.642
2
Pa = 0.297 x 1.800 x 1.200 = 0.642 T/met
0.108
Fv = 3.924 X = 1.569 TON
0.297
82.270 SAFE
F.O.S. = = 3.596 > 2.0
22.879
87.486 SAFE
F.O.S. = = 2.417 > 2.0
36.202
FV X 0.600
F. S. =
FH
2
A = 3.325 X 1.000 = 3.325 MET
1
ZXX = X 1.000 X 3.325 X 3.325 = 1.843 MET2
6
FV M 39.24 5.84
QMAX = + = + = 14.97 T/MET2
A ZXX 3.325 1.843
FV M 39.24 5.84
QMIN = - = - = 8.631 T/MET2
A ZXX 3.325 1.843
FV M 40.81 16.55
QMAX = + = + = 21.26 T/MET2
A ZXX 3.325 1.843
FV M 40.81 16.55
QMIN = - = - = 3.288 T/MET2
A ZXX 3.325 1.843
Page 20
B OVERTURNING
1 RECTANGULAR AREA (I) 1.000 0.500 4.311 2.500 5.389 0.550 2.964
2 TRIANGULAR AREA (III) 1.000 0.300 4.311 2.500 1.617 0.200 0.323
3 TRIANGULAR AREA (V) 1.000 1.325 4.311 2.500 7.140 1.242 8.866
22.239 26.446
TOTAL
h1 = 4.736
F1
F2
h2 = -0.425
F3
Pa2 Pa1
-0.227 2.535
Page 21
AS PER IRC 78-2000 The abutment shall be designed for a Live Load surcharge equivalent to 1.2 met. height of earth fill.
FH
h= 4.311
Pa
0.642
Page 22
2
Pa = 0.297 x 1.800 x 1.200 = 0.642 T/met
0.108
Fv = 3.154 X = 1.148 TON
0.297
30.293 SAFE
F.O.S. = = 3.153 > 2.0
9.608
32.732 SAFE
F.O.S. = = 2.102 > 2.0
15.575
Page 23
FV X 0.600
F. S. =
FH