Professional Documents
Culture Documents
2 Instruction IM QM
2 Instruction IM QM
General Description
Open the earthing Fit the cable in same Close the earthing switch
switch using the order as for the IM
operating lever cubicle. Use a torque
wrench and a 16 mm
socket to tighten the
bolts. Tightening
torque : 50 Nm
● Pull out the voltage indicator block. The cubicle can remain energize.