You are on page 1of 6

4.

Disassembly and Reassembly


4-1 Cabinet and PCB
Note : Reassembly in reverse order.

4-1-1 Top Cabinet Removal

1) Remove 5 Screws Œ, ´, ˇ.
2) Lift up the Top Cabinet in direction of arrow.

1 SCREW
(3 x 10 B)

3 SCREWS
(3 x 10 B)

1 SCREW
(3 x 10 B)

Fig. 4-1 Top Cabinet Removal

Samsung Electronics 4-1


Disassembly and Reaasembly

4-1-2 Ass’y Front-Cabinet Removal

1) Release 6 Hooks Œ, ´, ˇ, ¨ and Ass’y Front-Cabinet ˆ.

2 HOOKS
1 HOOK

1 HOOK
2 HOOKS

Assy Front-Cabinet

Fig. 4-2 Ass’y Front-Cabinet Removal

4-2 Samsung Electronics


Disassembly and Reaasembly

4-1-3 Ass’y Deck Removal

1) Remove 4 Screws Œ, ´ from the Ass’y Deck ˇ and lift it up.

2 SCREWS 2 SCREWS
(3 x 8 Y) (3 x 10 Y)

Ass’y Deck

Fig. 4-3 Ass’y Deck Removal

Samsung Electronics 4-3


Disassembly and Reaasembly

4-1-4 Main PCB Removal

1) Remove 2 Screws Œ, from the Main PCB ´ and lift it up.

2 SCREWS
(3 x 8 Y)

Fig. 4-4 Main PCB Removal

4-4 Samsung Electronics


Disassembly and Reaasembly

4-1-5 Jack PCB and Sub PCB Removal

1) Remove 5 Screws Œ, ´ from the Jack PCB ˇ and lift it up.


2) Remove 1 Screw ¨ from the Sub PCB ˆ and lift it up.

1 SCREW 4 SCREWS
(3 x 6 Y)
(3 x 6 Y)

1 SCREW
(3 x 6 W)

Fig. 4-5 Jack PCB and Sub PCB Removal

Samsung Electronics 4-5


Disassembly and Reaasembly

4-2 PCB Location

Main PCB

Jack PCB

Sub PCB

Fig. 4-6 PCB Location

4-6 Samsung Electronics

You might also like