TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Page 1 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
REVISION HISTORY
Page 3 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
00 –– First Issue
Page 5 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Page 7 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Page 9 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Page 10 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Page 11 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
3. Drawings:
Engineering drawings (For approval, Approved, As built, As installed)
Electrical circuit diagrams
Piping and Instrument drawings for the product path shall meet the ASME and 3A
specifications requirements as applicable.
System schematics.
AUTOMATION
7.0 Minimum requirements in critical process area to be subjected to automation.
8.0 SUPPORT REQUIRED FROM VENDOR
Pre- Installation support
8.1
Foot prints of Machine, Utilities and Piping requirements.
Start up support
FAT required before delivery. Supplier should provide a checklist and is responsible for total
completion up to performance qualification including training.
i. Technical staff of supplier shall come to install the equipment and shall be present up to
8.2 first three successful performance qualifications run.
ii. Technical staff of supplier shall train the applicable equipment operator of Aurobindo
Pharma Ltd before operation qualification testing.
iii. Technical staff shall help Aurobindo Pharma Ltd to prepare the SOP of Operation,
Cleaning and Preventive maintenance of the equipment.
Page 12 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
Limitations and Requirement from vendor on post validation changes, AMC / Service
Requirement on post installation vendor equipment and training for Operation and
Maintenance to staff concerned.
8.3
Vendor is responsible for performance of the equipment even in post validation
discrepancy.
Required training on Operation and Maintenance.
Any other specific requirement
8.4
• Required failure modes and effective analysis document.
• Operation and maintenance manuals.
•Calibration certificates with traceability
VALIDATION REQUIREMENT WITH SCOPE
Validation topic Yes/ No Scope
Design Qualification YES Supplier
9.0 FAT & SAT YES Supplier / user
Installation Qualification YES Supplier / user
Operational Qualification YES Supplier / user
Performance Qualification YES Supplier / user
ABBREVIATIONS
AMC : Annual Maintenance Contract
ANDA : Abbreviated New Drug Application
ASME : American Society for mechanical engineering
FAT : Factory Acceptance Test.
GMP : Good Manufacturing Practices
ISO : International Organization for standards
10.0 PLC : Programmable Logic Control
MOC : Material of Construction.
NIST : National Institute of Standards and Technology
NPL : National Physical Laboratory
NEC : National Electrical Code
WFI : Water for injection
PW : Purified water
HMI : Human machine interface
DISCUSSION / REVIEW / COMMENTS
11.0 The user requirement specification of Pure Steam Generation and Distribution System reviewed
for releasing the purchase order.
Page 13 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR PURE
TITLE :
STEAM GENERATION AND DISTRIBUTION SYSTEM
APPROVAL SIGNATORIES
Prepared By
Reviewed By
Approved By
END OF DOCUMNET
Page 14 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307