Professional Documents
Culture Documents
TITLE :
FOR INJECTION GENERATION SYSTEM
Page 1 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
REVISION HISTORY
Page 3 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
00 –– First Issue
Page 5 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Page 7 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Switches for manual operation- feed pump, purging valve, venting valve and dumping
valve.
Indication Lamp for - feed pump on.
Auto/Manual mode switch.
Main supply switch
Feed pump and sampling valve should stop automatically with respect to following
controls:
Boiler steam temperature low WFI pressure high
Feed pump over load relay
Insufficient feed water
Purging Problem
Feed water conductivity high
Emergency stop
Purging valve should start automatically with respect to following control:
• Boiler steam temperature low
• Column water level high
Purging valve will operate on water level accumulate in last column
• Last column level high
• Purging ON time parameter
•
Purging Hold time
Required safety interlocking between steam control valve to non-condensable gases regulator
Required indication of any respective fault at the P & I diagram with LED indication.
3.11 Desired level of instrumentation and Accuracy levels
Level transmitter:
•
Level transmitter for opening and closing of inlet valves for storage tank to avoid dry
running of distribution pump.
• Accuracy: +/- 0.5% in full scale, capacitance type.
Conductivity transmitter:
• A conductivity transmitter in the supply line shall monitor the quality of PW.
• Accuracy: +/- 0.2 to 0.5 % in full scale
•
Range 0 to 20 µs/cm
Temperature transmitter:
Page 8 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
• RTD type temperature transmitters shall be installed in the tank and in the return line of
distribution loop for monitoring the temperature continuously while the system is in
normal mode.
• Accuracy: +/- 0.5% in full scale, Duplex type.
Pressure gauge:
• Pressure gauge shall be bourdon type with a diaphragm isolator and shall be required for
monitoring of pressure at pump discharge.
• Accuracy: +/- 0.5% in full scale.
Language requirement (Specify such as English/others).
3.12
English
Data Acquisition
3.13 The vendor should provide the print out facility with memory and with 3 level password
protection.
Attachment / connectivity with other equipments
Required attachment to Purified Water storage tank for input of feed water. Required
3.14
attachment to WFI storage tank and WFI distribution loop. Required attachment to Plant steam
generator and Compressed Air generator
Software details
HMI: Siemens colour touch screen with a suitable size for easy operation
PLC:Siemens
Siemens with 21 CFR part11 compliance GAMP-5. Software backup, auto password
3.15 expiry and password change option, printer required and online web support through
modem for emergency trouble shooting.
3 to 4 unique levels should be available for the system to perform various operations
such as operator/ supervisor/ manager etc. Each level should have a unique password.
Required PLC and Software backup
Operational Range
3.16 Minimum Maximum
Supplier should provide operating ranges.
Tolerance Limits
3.17
0.2 to 0.3 of any instrument
Least Count (if applicable)
3.18
Minimum legibility.
3.19 Any other specific requirements (e.g. Maintenance requirement)
All product contact pipeline should be orbital welded.
The vendor must be able to provide routine repairs when needed beyond the warranty
period at cost to the customer.
Required audio / visual alarms for all critical insufficiency.
Page 9 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Page 10 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Power Failure and recovery– Specify the requirements in case of power failure.
4.6
Required UPS back up for power supply.
Any other specific GMP requirement
Require a design to prevent mixing of plant steam and pure steam
All parts coming to contact with pure steam are electro polished, pipe joints are orbital
4.7
welded and gaskets are made from pure Teflon or pharmaceutical grade silicon
Steam safety valve shall (Non-sanitary) spring loaded, MOC CS maximum.
Orbital welding shall be done using 99.993 % pure argon gas.
5.0 SAFETY REQUIREMENTS
Desired Product / Process Safety Systems
Safety valve provided on the boiler stream inlet at column and pure steam line.
Feed Pump: Regarding feed pump thermal over loaded relay, feed water pressure sensor
at the inlet of the feed pump and NRV
Required float type level controller for last column waste water
Emergency off:
5.1 Level sensor: Level sensor in column should control the level of water to prevent the
plant steam from contamination with the feed water.
Pressure control: At high pressure of pure steam, feed pump should stop
Out of Specification and system failure audio and visual alarm system
Feed water pump should start after and if plant steam temperature meets the process set
point. Feed water pump should stopped when air pressure is below the set point, feed
water conductivity is high, Boiler steam temperature is low, in case of in sufficient
evaporation, feed water pressure low.
Desired personnel safety systems
5.2 Emergency stop provision.
All Electrical Wiring should be concealed
6.0 DOCUMENTATION REQUIREMENT
Desired Document
1. User manuals:
Operation and Maintenance manuals
Specialized procedures, if applicable (such as Calibration, Cleaning, etc.)
Specifications and sources of some important materials, if applicable (such as
lubricants, cleaning agents, etc.)
2. Preventive maintenance manual including:
Equipment and Instrument list with component descriptions
Electrical component parts list with descriptions
Spare parts list with appropriate identification nos., if any
Change parts list with appropriate identification nos., if any
Page 11 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
The equipment shall be designed to use standard tools for maintenance and repairing.
Any special tools required for maintenance should be provided along with the
equipment.
3. Drawings:
Engineering drawings (For approval, Approved, As built, As installed)
Electrical circuit diagrams
Piping and Instrument drawings for the product path shall meet the ASME and 3A
specifications requirements as applicable.
System schematics.
AUTOMATION
7.0 Minimum requirements in critical process area to be subjected to automation.
8.0 SUPPORT REQUIRED FROM VENDOR
Pre- Installation support
8.1
Foot prints of Machine, Utilities and Piping requirements.
Start up support
8.2 FAT required before delivery. Supplier should provide a checklist and is responsible for total
completion up to performance qualification including training.
Limitations and Requirement from vendor on post validation changes, AMC / Service
8.3 Requirement on post installation vendor equipment and training for Operation and
Maintenance to staff concerned.
Page 12 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Vendor is responsible for performance of the equipment even in post validation
discrepancy.
Required AMC service.
Required training on Operation and Maintenance.
Any other specific requirement
8.4 The machine should be such a way that to fit with tunnel sterilizer.
Control cabinet with integrated temperature monitoring to protect the installed components
VALIDATION REQUIREMENT WITH SCOPE
Validation topic Yes/ No Scope
Design Qualification YES Supplier
9.0 FAT & SAT YES Supplier / user
Installation Qualification YES Supplier / user
Operational Qualification YES Supplier / user
Performance Qualification YES Supplier / user
ABBREVIATIONS
AMC : Annual Maintenance Contract
ANDA : Abbreviated New Drug Application
ASME : American Society for mechanical engineering
DQ : Design Qualification
EU : European Union,
FAT : Factory Acceptance Test.
GMP : Good Manufacturing Practices
10.0 ISO : International Organization for standards
IQ : Installation Qualification
LAF : Laminar Air Flow
OQ : Operational Qualification
PQ : Performance Qualification
PLC : Programmable Logic Control
MOC : Material of Construction.
NIST : National Institute of Standards and Technology
NPL : National Physical Laboratory
NEC : National Electrical Code
DISCUSSION / REVIEW / COMMENTS
11.0 The user requirement specification of Water for Injection Generation System reviewed for
releasing the purchase order.
APPROVAL SIGNATORIES
Page 13 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307
USER REQUIREMENT SPECIFICATION FOR WATER
TITLE :
FOR INJECTION GENERATION SYSTEM
Prepared By
Reviewed By
Approved By
END OF DOCUMNET
Page 14 of 14
__________________________________________________________________________________
Formulations Unit-IV, AUROBINDO PHARMA LIMITED, Plot No’s - 4, 34 to 48, EPIP, IP-Pashamylaram, Sanga Reddy (Dist.), Hyderabad – 502307