Professional Documents
Culture Documents
PROGRAMME
GROUP 5
Hanura Nurul Haq Satrio Arif Abdulla Rosilawati Tiara Nurfaisa Salsabila
(1800961) (1800398) (1800613) (1804632)
Points
explained : 01 IPAL EXPLANATION
02 GENERAL CONDITION OF
PT.KAHATEX IPAL
03 THE ADVANTAGES OF PT
KAHATEX IPAL
Preliminary
Simple PowerPoint Presentation
In the PowerPoint
Simple textile industry, PT Kahatex has three units of wastewater
Presentation
Simple PowerPoint
treatment Presentation
plants (IPAL). The first WWTP (unit 1) was established
in 1992 with a capacity (volume) of 3000 m3 / day, the second
IPAL (unit 2) was established in 1994 with a capacity (volume) of
6000 m3 / day, while the third IPAL (unit 3) was established in
1997-1998 with a capacity (volume) of 27,000 m3 / day. The outlet
You can simply impress your audience and
or
add afinal output
unique zing of tothis
and appeal your wastewater from IPAL 1 and IPAL 2 is
Presentations. Easy to change colors, photos
channeled to IPAL 3.
and Text. You can simply impress your
audience and add a unique zing and appeal
to your Presentations.
2. GENERAL CONDITION OF PT.KAHATEX
Simple PowerPoint Presentation IPAL
Simple PowerPoint Presentation
The process
Simple of each
PowerPoint WWTP with the same tendency, namely the
Presentation
Simple PowerPoint
wastewater will Presentation
go through the process of Equalization &
Neutralization, Cooling Tower (cooling), Aeration, Sedimentation,
Chemical Effluent. And at IPAL 3 there is a Lamela process in the
pretreatment process. The following will discuss the IPAL process
one by one
You can simply impress your audience and
add a unique zing and appeal to your
Presentations. Easy to change colors, photos
and Text. You can simply impress your
audience and add a unique zing and appeal
to your Presentations.
Process of IPAL PT.Kahatex
1 2 3 4 5
Equalization Neutralization Cooling Tower Aeration Sedimentation
Process of IPAL PT.Kahatex
1 2 3 4
Pretreatment Final Cooling Tower Screw Press
IPAL 3 Effluent (Pendingin) Machine
3. THE ADVANTAGES OF PT
KAHATEX IPAL
1 2 3 4 5
Controlled by
Investing funds of 20 billion for There is an additional
BBPK (Center for
replacement of equipment such as indicator in the form of
Pulp and Paper)
diffusers, cooling towers, addition a fish pond
and Sucofindo,
of screw press machines from one
conducted
to three units
regularly, namelyEvery year there are always Adding waste
once a month. upgrades in other words, there monitoring tools such
are always tools that are as pH control, flow
changed to maintain meter
environmental conditions for
BUDGET
No. TYPE OF EXPENDITURE COST
1 Equipment 3.500.000
2 Materials 600.000
4 Etc. 400.000
Total 4.750.000