You are on page 1of 24

Gujarat Technological University,

Ahmedabad
AN INTERNSHIP REPORT

on
“VALUATION OF
RESIDENTIAL BUILDING”
Subject code: 3170001
BACHELOR OFENGINEERING

in

Civil Engineering

Submitted to: Submitted by:


Mr. Divyesh Patel TANK KRUNAL H
Assistant Professor 170940106033
Department of Civil Engineering Department of Civil Engineering
VIEAT, Kim (094) VIEAT, Kim (094)

Vidhyadeep Institute of Engineering and Technology

Civil Engineering Department

June,2021
DECLARATION

I hereby declare that this project work is an authentic record of my own work done
under the supervision of my mentor Mr. KRUNAL H TANK at R J
CORPORATION, Amroli and Internal Guide Mr. Divyesh Patel, Assistant Professor,
Civil Engineering Department, VIEAT, Anita, Kim. This project work is only meant for
submission to the Civil Engineering department, Vidhyadeep Institute of Engineering
and Technology, as the requirement of 2-week industrial training. All the data used in
calculations is correct to best of my knowledge and observed practically at the site.

TANK KRUNAL H

(170940106033)

ii
CERTIFICATE
This is to certify that project work embodied in this report entitled “VALUATION
OF RESIDENTIAL BUILDING” has been carried out by Tank Krunal H
(170940106012) at “R J CORPORATION, Amroli” for Bachelors of Engineering at
Vidhyadeep Institute of Engineering & Technology, Kim (094)affiliated by Gujarat
Technological University. This Internship project work has been carried out under my
supervision and to the satisfaction of department. The student work has been accepted
for publication.

Date:
Place: Kim,Surat

Signature of Guide: Signature of HOD


Mr. Divyesh Patel Mrs. Vrunda Sule
Assistant professor Head of Department
CED, VIEAT, KIM CED, VIEAT, KIM

Signature of External Examiner

iii
JOINING LETTER

iv
COMPLETION CERTIFICATE

v
ACKNOWLEDGEMENT

The success and outcome of this project required a lot of guidance and
assistance from many people and I am extremely privileged to have got this all along
the completion of my project. All that I have done is only due to such supervision and
assistance and I would not forget to thank them.

I would like to thanks to My Parents for their everlasting love and financial
support throughout my numerous academic years. Without their support, I would not
have been able to accomplish my dreams.

It gives us immense pleasure to express my deep sense of gratitude to our Guide Mr.
Divyesh Patel, Assistant Professor, Civil Engineering Department, VIEAT, Anita, Kim
for his valuable guidance, motivation, constant inspiration and above all for his ever-co-
operating attitude that enabled us in bringing up this project in the present form.

I would also like to thank my Friends and Staff of my college who have directly
or indirectly provided their unerring support throughout the course of this dissertation
work, without whom none of this would have been possible.

Thank you all Tank Krunal H.


(170940106033)

vi
EXECUTIVE SUMMARY

The 2-week Summer Internship Program at R J RESIDENCY for Valuation of


residential building in a vital part of the 1-year BE Civil engineering Course. Since
majority of the students come without any prior work experience, the Summer
Internship adds worth to their CVs by giving each student immense learning. At R J
CORPORATION, a student can bag an internship through various means since the
company gives us ample opportunities to interact with industry experts.

my whole period of internship, I have been working in a real-life project that provides
me an insight how to deal with customers, how to adjust with the sudden changes of
requirements and most importantly how to work in a large team I have to go through
some technical and non technical challenges in this period. But at the end I have
discovered the slope of my learning curve is in higher side.

To full fill the academic requirements of the internship. I am required to submit an


internship report. This report summarizes my experiences, challenges, learnings and
outcomes from the internship period.

vii
ABOUT THE COMPANY

R J CORPORATION was instituted in April 2001 with a motive of creating sensible


and responsive designs in fields related to built environment. Started with meager
resources the organization has grown steadily with inflow of physical resources and
expertise. Presently the organization is having a young and enthusiastic group of
Architects and Designers supported by technically skilled staff for achieving excellence
in the field of architecture and design.

Since its inception the firm is striving to achieve perfection in various aspects related to
innovations in design, energy efficiency, construction management and on site
execution. Specific thrust is given to transparency in dealing, quality assurance and
Standard Operating Systems.

Presently the firm is dealing into projects related to Residential and Institutional
Architecture, Industrial Architecture, Interior architecture, Urban Design and
Landscape. Members of the organization are also actively involved in academics and
collaborate with like minded firms for important projects contributing to the betterment
of living environment. The organization has a wide consultant base for structural
engineering, Landscape Design, Services and Infrastructure design, arts and project
management.

A healthy working environment is offered in the office in order to assure innovation and
creativity in design. Freedom at individual level is given for development of design and
innovation in construction technology to the project in-charge and at the same time a
quality check is kept on the quality of working through a central monitoring system.

The firm has been awarded with prestigious awards for excellence in Design from
HUDCO, IIID & has been selected as Upcoming Young Designers 09′ for Architectural
Practice in India by Indian Architects & Builders (IA&B) Magazine. The firm is
committed towards innovation in design and transparent way of dealing in design
profession.

viii
COMPANY PROJECTS

1. Radhe Residency
2. Happy Residency
3. Mahavir Heights
4. Shivanjali Row House
5. Maruti Residency

ix
TABLE OF CONTENTS

ACKNOWLEDGEMENT ............................................................................................... vi
EXECUTIVE SUMMARY.........................................................................................vii
ABOUT THE COMPANY ........................................................................................viii
COMPANY PROJECTS..............................................................................................ix
Table of Contents .............................................................................................................. x
CHAPTER 1 Introduction ............................................................................................. 1
1.1 Justification of internship ................................................................................... 1
1.2 Aim of the study ................................................................................................. 1
1.3 Objective of the study ........................................................................................ 2
1.4 Scope of the study .............................................................................................. 2
CHAPTER 2 Weekly progress ...................................................................................... 3
2.1 List of Activities involved.................................................................................. 3
2.2 Week-1 Progress ................................................................................................ 3
2.3 Week-2 Progress ................................................................................................ 3
CHAPTER 3 Case study ............................................................................................... 4
CHAPTER 4 Opportunities ........................................................................................... 7
4.1 What roles you served? ...................................................................................... 7
4.2 What work you carried out? ............................................................................... 7
4.3 What contribution you made to company? ........................................................ 7
CHAPTER 5 Learning .................................................................................................. 8
CHAPTER 6 Challenges Faced .................................................................................. 10
CHAPTER 7 References ............................................................................................. 11
APPENDIX..................................................................................................................... 12
7.1 Appendix A ...................................................................................................... 13
7.2 Appendix B ..................................................................................................... 14

x
CHAPTER 1 INTRODUCTION

Internship program has become the bridge for those who want to enter to corporate level from
the college life, through internship I got to know the real working environment that was very
much different from my course study. The internship is an integral platform for anyone to
gain experience in an actual workplace.

During my internship, I got a chance to work in R J CORPORATION and know about how to
make innovations in design, energy efficiency, and construction management. All my
experience helped me realize parts like grouping work, work environment, peering support,
carried out in the organization. Thus, the internship duration provided me with the
opportunity to broaden my knowledge, acknowledge my strengths/weakness that would be
more helpful to shape up my career in the future. It also helps me to control and develop my
attitude and behavior in dealing with different kinds of people and situation.

1.1 Justification of internship

 To gain experience.
 To have a better understanding.
 Have the opportunity to learn and watch.
 Gain the ability to put new things into practice.
 Build confidence.
 To get a feel for different industries.
 To communicate


1.2 Aim of the study

This report gives knowledge of the difficulties that I looked in my work environment. It
likewise gives a thought regarding how I adjust with the expert climate. A short portrayal
about the work space is added to this report. It likewise sums up the results of the temporary
position time frame. A concise conversation about my works is likewise given. Finally a
comparison of my skills before and after internship is provided which will justify my
achievements.

1
1.3 Objective of the study

 Learn new software (AutoCAD)


 Make plans

1.4 Scope of the study

This report gives knowledge of the difficulties that I looked in my work environment. It
likewise gives a thought regarding how I adjust with the expert climate. A short depiction
about the workplace is added to this report. It additionally sums up the results of the entry
level position period. A short conversation about my works is additionally given. At long last
a correlation of my abilities when temporary job is given which will legitimize my
accomplishments.

2
CHAPTER 2 WEEKLY PROGRESS

2.1 List of Activities involved

 Discussion about Design process. There are typically 5 stages of architectural design
involved in a design-build of any project.
1. Pre-design (pd)
2. Schematic design (sd)
3. Design development (dd)
4. Construction drawings (cd)
5. Construction
 Study Area discussion

2.2 Week-1 Progress

 Literature study
 Study area
 Previous proposals

2.3 Week-2 Progress

 Learn AutoCAD
 Basic about Revit software
 Make Plans in AutoCAD

3
CHAPTER 3 CASE STUDY

1. PRE-DESIGN (PD)
The first objective is to get-together with a client and determines overall project vision and
goals. Irrespective of the industry being residential , healthcare, industrial, hospitality etc.,
there are some key areas to discuss the project – scope, features, purpose, and functionality.

In this phase, we carry out

 Client consultation
 Existing conditions survey and documentation
 Photographs
 Measurements
 Compile existing drawings if any
 Prepare high-level base drawings
 Statement of probable build/construction cost
 Programming space and use
 Code review

This phase ends with owner’s decision to move forward with a project.

2. SCHEMATIC DESIGN (SD)


In this phase, we do series of rough sketches/drawings that illustrate the basic concepts of the
design. Also, initial research of local compliance and regulations are completed at this time.

At the end of this phase, we deliver

 Floor plans of all levels with generic openings and plumbing fixtures
 Exterior building elevations with representative openings and finishes
 Building cross-section
 Typical wall section

And we move to the next phase with the owner’s approval.

3. DESIGN DEVELOPMENT (DD)


Design development collects the results from the schematic design phase and takes them one
step further.

4
This phase involves finalizing the design and specifying items such as materials, window and
door locations and general structural details.

At the end of this phase, we deliver

 Floor plans with a proposed basis of design openings and plumbing fixtures
 Overall dimensions
 Structural grid dimensions
 Interior wall dimensions
 Exterior elevations with a proposed basis of design openings and finishes
 Additional building sections
 Wall sections at all typical conditions
 Typical details
 Additional details to establish a basis for design products

Now we have given shape to project’s vision through drawings and written specifications.

4. CONSTRUCTION DRAWINGS (CD)


By now we have a final design. We can begin preparing construction drawings/blueprints,
notes, and technical specifications necessary for bidding, construction, and permit
application. Construction contractors will use these detailed drawings and specifications to
prepare for the construction.

In this phase, we deliver

 Floor plans fully annotated


 All dimensions
 Room, wall, door, and window identification
 Section and detail indicators
 General notes and detailed notes
 Exterior elevations fully annotated
 All building sections required for construction
 Wall sections at all conditions
 Details fully annotated
 Structural plans, details, and notes
 Plumbing plans, schedules, details, and notes

5
 HVAC plans, schedules, details, and notes
 Electrical power and lighting plans, schedules, details, and notes

And we move to the final phase

5. CONSTRUCTION

Finally, the construction is underway.

During this phase, we will build as per the design intent. Also if there are any changes, we
discuss changes and options with the owner. It ensure that alterations are compatible with
owner’s vision for the project. This is the last phase and at the end of this phase, a project is
ready for the use/occupancy.

6
CHAPTER 4 OPPORTUNITIES

4.1 What roles you served?

In the beginning of internship my work is to simply try to learn how the company works.
Than i Assist and contribute to the team in making of report, power point presentation and
making of building plans.

4.2 What work you carried out?

Performing clerical duties: Creating Power Point presentations, drafting reports, designing
creative’s, and help in making plans.

4.3 What contribution you made to company?

I contribute two weeks as an intern to the company and there I make lot of new friends and
learn from them the method of the making plans in AutoCAD and Revit on the base of Civil
Engineering.

I learn how to manage with the client and the things which the clients want from us and also I
had been learnt at there.

7
CHAPTER 5 LEARNING

Improving our Practical skill

By working in such a big design company we have improved our practical skill on many sec-
tors of work in the office.

Some of the practical skills we have improved in the internship program are:

Design Process:

We practice real time design process in our every design assignment. From Information gathering
to final preparation of design documents.

Presentation skills:

Working with many projects we learned and greatly develop different types of pre-
sentation approaches.

Material:

Working with many design helps us by increasing our building material knowledge.

Software Awareness:

Mostly in the office we use the latest and updated software, Like Revit Architecture, AutoCAD,
ArchiCAD 18, Artlantis 5, Adobe Photoshop CC, Adobe Illustrator CC, Adobe Indesign CC,
Adobe Light room, . As a result of this we learn much new software, and more familiar with the
one we use before.

8
Improving Communication Skill

Interpersonal skills are the life skills we use every day to communicate and interact with
other people, individually and in groups. Interpersonal skills include not only how we
communicate with others, but also our confidence, and our ability to listen and understand.
Problem solving, decision making and personal stress management are also considered
interpersonal skills. At the beginning of the Internship program we were very afraid to
approach the employees in the office; our contact was only with our supervisor and with the
General Manager. But as time goes we improve our interpersonal communication skill. From
our internship experience we can say that interpersonal communication is crucial to
efficiently finish any design projects, which involves large number of manpower in different
section of work.

In addition we have learnt how to become active listener and to be assertive to express my
idea freely.

9
CHAPTER 6 CHALLENGES FACED

 Afraid to Ask Questions


 Supervisors Forget That You're New to the Field
 Your Work Is Not Used
 A New Lifestyle

10
CHAPTER 7 REFRENCES

[1] Ashok Jain, Limit state design.

[2] Fischer Gregor and C. Li Victor, (2003) intrinsic response control of moment
resisting frames utilizing advanced composite materials and structural elements. ACI
structural Journal V.100, N0.2.

[3] Indian Standard Code Of Practice For Ductile Detailing Of Reinforced Concrete
Structures To Seismic Forces IS: 13920- 1993, Indian Standard Institute, New Delhi

[4]. Response Analysis of Multi-Storey RC Buildings under Equivalent Static and Dynamic
Loads According to Egyptian Code Sayed Mahmoud1, Waleed Abdallah2 1Department of
Construction Engineering, College of Engineering, Dammam University Dammam, Saudi
Arabia 2Faculty of Engineering at Mataria, Helwan University Cairo, Egyp

[5] Structural Design of concrete structure using E-Tabs, Shivam Asawa, IOSR Journal of
Mechanical and Civil Engineering (IOSR-JMCE) Volume 14, Issue 1 ver. 4 (Jan – Feb2017),
PP 49-51

[6] Design and analysis of multi-storeyed building under static and dynamic loading
conditions by using E-TABS by Balaji and Selvarasan in International Journal of Technical
Research and Applications, Volume 4 , Issue 4(July-Aug, 2016), PP.1-5

[7] Effect of base isolation in multistoried reinforced concrete building by M. Rajesh Reddy,
Dr.N. Srujana, N.Lingeshwaran, IJCIET International Journal of civil engineering &
technology, Volume 8, Issue 3, March 2017, PP. 878-887

[8] Mahesh N. Patil, Yogesh N. Sonawane, “Seismic Analysis of Multi-storied Building”,


International Journal of Engineering and Innovative Technology, ISSN: 2277-3754, Volume
4, Issue 9, March 2015

11
APPENDIX

7.1 Appendix A

Floor Plan

Work Done by Me:

I have prepared floor plan with the help of my Mentor.

12
It has improved my knowledge of working drawing and also taught me how a building
constructed on the basis of drawing.

Column and Door, Window Plan

Work Done by Me:

All the column ,window and Door marking done by me