Professional Documents
Culture Documents
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
EX LES
TO LOCATION DESIGNATED BY SAUDI ARAMCO
CA
PROJECT ENGINEER.
IST
B
I
3. ALL WORK SHALL COMPLY WITH THE CONDITIONS SET OUT IN
NG
EX LES
SAUDI ARAMCO CONSTRUCTION SAFETY MANUAL.
CA
TO
I
13
ST
B
4. POWER SUPPLY MUST BE COMPLETELY LOCK-OUT AND
.8 M AI
I
RE
DISCONNECTED BEFORE THE START OF ANY ELECTRICAL
NG
ACTIVITY IN COMPLIANCE WITH THE REQUIREMENTS OF G.I.6.012
U/ N
TO
"ISOLATION LOCK-OUT & USE OF HOLD TAGS".
13
G
3 V
32 20
.8 M AI
-T /1
RE
5. ERECT TEMPORARY BARRICADES AND WARNING SIGNS FOR
26 VA 08
DL 0 K /2 PROTECTION AND SAFETY OF THE GENERAL PUBLIC THROUGHOUT
U/ N
15 .8K
V
315 THE CONSTRUCTION PERIOD. REMOVE THE SAME UPON COMPLETION
G
13 OR AS INDICATED BY SAUDI ARAMCO PROJECT ENGINEER.
LEGEND
-T
32
4
/1
20
V
218 EXISTING PRIMARY 13.8KV U/G DISTRIBUTION CABLES,
2
25 VA 08 3-1/C #120MM XLPE/EPR, DIRECT BURIAL TYPE
DL 0 K /2
15 .
13
8K
V
216 TO REMAIN
REFERENCE DRAWINGS
DRAWING CERTIFIED
215
DATE: 12/08/2020
CSTSD REF. No. IF-0009
123
METERS
SCALE: 1 :150M
REVISION VALIDATION
20U077-077
dd%mm%yy
235 P HA-005744 001 00
xxxname %filename%filename%filename%filename%filename%filename%filename% Saudi Aramco 2615 ENG. (05/05)