Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997% 0.00105 0.00105 0.00105 0.00105 0.00105
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start July August September
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487% 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997% 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253% 9.73E-05
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start September October November
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487% 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997% 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694% 0.00769 0.00769
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154% 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468% 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374% 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832% 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253% 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start November December January
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487% 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694% 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154% 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468% 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374% 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832% 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253% 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February March
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470% 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487% 0.00062 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154% 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468% 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374% 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832% 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253% 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April May
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470% 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154% 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468% 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374% 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832% 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470% 0.00026 0.00026 0.00026 0.00026
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141% 0.00035 0.00035 0.00035 0.00035
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start July August September
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
0.00081
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
5E-05
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start September October November
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
0.00059 0.00059 0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
3E-05
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
5E-05 5E-05
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
0.001%
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
0.00103 0.00103 0.00103 0.00103
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start November December January
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
0.00022 0.00022
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
0.00091 0.00091 0.00091 0.00091 0.00091 0.00091
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
3E-05 3E-05
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
0.00439 0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
0.00226
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February March
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
0.00022 0.00022 0.00022 0.00022
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
0.00091 0.00091 0.00091 0.00091 0.00091 0.00091
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
0.0005 0.0005 0.0005 0.0005 0.0005
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
0.00439 0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
0.00226 0.00226 0.00226 0.00226 0.00226 0.00226 0.00226 0.00226
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April May
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
0.00081 0.00081 0.00081
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
0.00022 0.00022 0.00022
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
0.014%
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
0.00092 0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
9.5E-05 9.5E-05
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
0.00091 0.00091 0.00091
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
0.00226 0.00226
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 1% 1% 1%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 1% 2% 3%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 1% 1% 1% 1% 1% 1% 1% 1%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 4% 5% 6% 8% 9% 10% 11% 12%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start July August September
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
0.0007 0.0007 0.0007 0.0007 0.0007
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 1% 0% 0% 0% 0% 0% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 13% 14% 14% 14% 14% 14% 15% 15%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start September October November
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
SUBBASE AND BASE COURSE 20 Mon, 04-Jul-22 Fri, 29-Jul-22 0.066% 0.0001 0.0001 0.0001
100.000%
Legend: Accomplishment 0% 2% 2% 2% 3% 4% 4% 4%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 15% 17% 19% 21% 24% 27% 31% 35%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start November December January
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
0.0007 0.0007 0.0007
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
0.00242 0.00242 0.00242
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
0.00066 0.00066 0.00066 0.00066 0.00066 0.00066 0.00066
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
0.00052 0.00052 0.00052
RIVER BANK PROTECTION WORKS FOR -3 25.630%
DOLORES 152 Mon, 02-Aug-21 Tue, 25-Jan-22 190 Wed, 05-May-21 Tue, 25-Jan-22
RIVER 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068
N.DEPOT SUB STATION 20 Fri, 05-Nov-21 Sat, 27-Nov-21 20 Fri, 05-Nov-21 Sat, 27-Nov-21 0 0.041%
SUBBASE AND BASE COURSE 20 Mon, 04-Jul-22 Fri, 29-Jul-22 0.066% 0.0001
100.000%
Legend: Accomplishment 4% 4% 4% 4% 4% 5% 4% 4%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 39% 43% 47% 51% 55% 60% 64% 68%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February March
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
0.00242 0.00242 0.00242 0.00242 0.00242 0.00242 0.00242
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
0.00066 0.00066 0.00066
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
0.00052 0.00052 0.00052 0.00052 0.00052 0.00052
RIVER BANK PROTECTION WORKS FOR -3 25.630%
DOLORES 152 Mon, 02-Aug-21 Tue, 25-Jan-22 190 Wed, 05-May-21 Tue, 25-Jan-22
RIVER
N.DEPOT SUB STATION 20 Fri, 05-Nov-21 Sat, 27-Nov-21 20 Fri, 05-Nov-21 Sat, 27-Nov-21 0 0.041%
100.000%
Legend: Accomplishment 2% 3% 3% 2% 2% 2% 3% 2%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 71% 74% 76% 79% 81% 83% 86% 88%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start March April May
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 2% 2% 2% 2% 0% 0% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 90% 92% 94% 96% 96% 97% 97% 97%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start May June July
Duration RL. WT.
Bill No. Item Description Duration Start End Duration Start End Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
0.00016
100.000%
Legend: Accomplishment 1%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 100%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
January February March April May June
Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1
June July August September October
Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105
0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019 0.00019
0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
0.00105
0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769
0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
March April May June July
Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
0.00327 0.00327 0.00327
0.00059 0.00059
3E-05
9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081 0.00081
0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091
0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
3E-05 3E-05
0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
9.73E-05
0.014%
9.5E-05 9.5E-05
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 1% 1% 1% 1%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 2% 3% 4% 5%
0.00103
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
1% 1% 1% 1% 1% 1% 1% 0% 0% 0% 0% 0% 0% 0% 0% 2% 2% 2% 3%
6% 8% 9% 10% 11% 12% 13% 14% 14% 14% 14% 14% 15% 15% 15% 17% 19% 21% 24%
0.0005 0.0005 0.0005 0.0005 0.0005
0.001%
0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103
0.00242 0.00242 0.00242 0.00242 0.00242 0.00242 0.00242 0.00242 0.00242 0.00242
0.00066 0.00066 0.00066 0.00066 0.00066 0.00066 0.00066 0.00066 0.00066 0.00066
0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068 0.01068
4% 4% 4% 4% 4% 4% 4% 4% 5% 4% 4% 2% 3% 3% 2% 2% 2% 3%
27% 31% 35% 39% 43% 47% 51% 55% 60% 64% 68% 71% 74% 76% 79% 81% 83% 86%
0.00439
2% 2% 2% 2% 2% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 1% 1% 1%
88% 90% 92% 94% 96% 96% 97% 97% 97% 97% 97% 97% 97% 97% 98% 99% 99% 100%
Northern Builders
Project Schedule
Project Title: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
i BidDoc Schedule Cosnt.n Period Construction Period (Feb. 1, 2021 - May 31,2022) - 7 Months Left and Additonal a Month Based on Current Schedule (Duration:14mons)
ii Current Schedule BDSCP Construction Period (Mar. 1, 2021 -May 31,2022) -7 Months Left Based on Current Schedule (Duration:14mons)
iii Revised Schedule for Const. P. Construction Period (May 5, 2021 - July 29, 2022)
29 Days
Offset
BidDocs End
Date Schedule
Part A Earth Works 124 1-Feb-21 5-Jun-21 124 2-Mar-21 4-Jul-21 April 30, 2022
(Monday)
Current
Schedule -
Part D Structural Works 289 1-Apr-21 15-Jan-22 289 30-Apr-21 13-Feb-22 Offset at 29
days due to
turnover of
area. End Date
is May 31,2022
Part E Miscellaneous Structures 87 1-Jun-21 27-Aug-21 87 30-Jun-21 25-Sep-21 (Tuesday)
Base on our
Actual Site
Bill No. 4 Depot Buildings 118 1-Jun-21 27-Sep-21 118 30-Jun-21 26-Oct-21 Condition &
Material Status
29 Days - End Date We
Offset Need to Finish
The Project July
Earth Works 118 1-Jun-21 27-Sep-21 118 30-Jun-21 26-Oct-21 29, 2022
(Friday)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11
0.750% 10.360% 10.360% 12.615% 13.200% 4.796% 3.695% 3.825% 6.658% 7.319%
0.750% 11.110% 21.469% 34.084% 47.285% 52.080% 55.775% 59.600% 66.258% 73.577%
1 2 3 4 5 6 7 8 9 10
0.000% 0.000% 0.000% 0.000% 0.844% 1.990% 3.233% 4.857% 6.006% 6.401%
11 12 13 14 15
11 12 13 14 15 16 17 18
6.401% 6.401% 6.401% 6.401% 6.401% 6.401% 6.401% 6.401%
Northern Builders
Project Schedule
Project Title: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
i BidDoc Schedule Cosnt.n Period Construction Period (Feb. 1, 2021 - May 31,2022) - 7 Months Left and Additonal a Month Based on Current Schedule (Duration:14mons)
ii Current Schedule BDSCP
iii Revised Schedule for Const. P.
29 Days
Offset
BidDocs End
Date Schedule
Part A Earth Works 124 1-Feb-21 5-Jun-21 124 2-Mar-21 4-Jul-21 April 30, 2022
(Monday)
Current
Part D Structural Works 289 1-Apr-21 15-Jan-22 289 30-Apr-21 13-Feb-22 Schedule -
Offset at 29
days due to
turnover of
area. End Date
is May 31,2022
Part E Miscellaneous Structures 87 1-Jun-21 27-Aug-21 87 30-Jun-21 25-Sep-21 (Tuesday)
Base on our
Actual Site
Bill No. 4 Depot Buildings 118 1-Jun-21 27-Sep-21 118 30-Jun-21 26-Oct-21 Condition &
Material Status
29 Days - End Date We
Offset
Need to Finish
The Project July
Earth Works 118 1-Jun-21 27-Sep-21 118 30-Jun-21 26-Oct-21 29, 2022
(Friday)
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(5) Gravel Bag filled with Crushed Stone 160 Mon, 20-Sep-21 Thu, 24-Mar-22
206(6)a Structural Cast in Situ Concrete, 40 MPa for 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical 0% 0% 0% 0% 0%
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 119 Mon, 21-Jun-21 Fri, 05-Nov-21
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
103(1)c Embankment for At grade section for Depot 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(5) Gravel Bag filled with Crushed Stone 160 Mon, 20-Sep-21 Thu, 24-Mar-22
0% 0% 0%
206(6)a Structural Cast in Situ Concrete, 40 MPa for 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(5) Gravel Bag filled with Crushed Stone 160 Mon, 20-Sep-21 Thu, 24-Mar-22
206(6)a Structural Cast in Situ Concrete, 40 MPa for 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(5) Gravel Bag filled with Crushed Stone 160 Mon, 20-Sep-21 Thu, 24-Mar-22
206(6)a Structural Cast in Situ Concrete, 40 MPa for 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
103(5) Grade Stabilized Crushed Stone (M-40) 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Drainage System & River Bank Protection 46 Thu, 06-Jan-22 Thu, 10-Mar-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
103(5) Grade Stabilized Crushed Stone (M-40) 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm) 0% 0% 0%
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Drainage System & River Bank Protection 46 Thu, 06-Jan-22 Thu, 10-Mar-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
103(5) Grade Stabilized Crushed Stone (M-40) 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Drainage System & River Bank Protection 46 Thu, 06-Jan-22 Thu, 10-Mar-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
103(5) Grade Stabilized Crushed Stone (M-40) 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Drainage System & River Bank Protection 46 Thu, 06-Jan-22 Thu, 10-Mar-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Legend: 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.1% 1.1% 1.1% 1.1%
BidDocs Schedule 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 2% 3% 4%
Currrent Schedule
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06% 0.06% 0.06% 0.06%
Revised Schedule 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.06% 0.13% 0.19% 0.25%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Legend: 1.1% 1.1% 1.2% 1.2% 1.2% 1.2% 1.2% 1.2% 0.1% 0.1% 0.2% 0.2% 0.3% 0.3% 0.4% 0.4% 1.6% 1.9% 1.9% 3.1%
BidDocs Schedule 5% 6% 8% 9% 10% 11% 12% 13% 14% 14% 14% 14% 14% 15% 15% 15% 17% 19% 21% 24%
Currrent Schedule
0.06% 0.06% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.03% 0.03% 0.79% 0.79% 0.89% 7.74% 0.89% 0.89% 0.89% 0.00% 0.00% 0.00%
Revised Schedule 0.31% 0.38% 0.47% 0.56% 0.66% 0.75% 0.84% 0.93% 0.96% 0.99% 1.79% 2.58% 3.46% 11.20% 12.09% 12.98% 13.88% 13.88% 13.88% 13.88%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Legend: 3.7% 3.8% 3.8% 3.9% 3.9% 4.4% 3.9% 3.9% 4.6% 4.2% 4.4% 2.5% 2.9% 2.5% 2.5% 2.5% 2.4% 2.7% 2.0% 2.0%
BidDocs Schedule 27% 31% 35% 39% 43% 47% 51% 55% 60% 64% 68% 71% 74% 76% 79% 81% 83% 86% 88% 90%
Currrent Schedule
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Revised Schedule 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Legend: 2.0% 1.8% 2.1% 0.5% 0.2% 0.1% 0.1% 0.0% 0.1% 0.1% 0.1% 0.0% 0.7% 0.7% 0.7% 0.7%
BidDocs Schedule 92% 94% 96% 96% 97% 97% 97% 97% 97% 97% 97% 97% 98% 99% 99% 100%
Currrent Schedule
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Revised Schedule 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88% 13.88%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
RL. WT.
Duration
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Mobilization / Demobilization
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 12 0.470%
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 16 0.141%
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 7 1.487%
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 4 1.997%
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 8 7.694%
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 6 4.154%
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 20.468%
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 7 8.374%
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 7 8.832%
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 4 0.253%
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105 0.00105
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769 0.00769
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22 0.00062 0.00062 0.00062 0.00062
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758 0.00758
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05 9.73E-05
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026 0.00026
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22 0.00035 0.00035 0.00035 0.00035
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22 0.00143 0.00143
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22 0.00327
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22
201(4)d Backfill 19 Tue, 23-Feb-21 Sat, 13-Mar-21 115 Thu, 10-Feb-22 Thu, 23-Jun-22
104(1) Subgrade Preparation (Common Material) 8 Tue, 16-Feb-21 Tue, 23-Feb-21 24 Wed, 01-Jun-22 Tue, 28-Jun-22
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 41 Mon, 01-Feb-21 Sat, 13-Mar-21 150 Tue, 07-Sep-21 Mon, 28-Feb-22
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 71 Mon, 22-Feb-21 Mon, 03-May-21 119 Mon, 21-Jun-21 Fri, 05-Nov-21
103(1)c Embankment for At grade section for Depot 74 Mon, 15-Mar-21 Thu, 27-May-21 96 Sat, 06-Nov-21 Fri, 25-Feb-22
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 50 Mon, 12-Apr-21 Mon, 31-May-21 180 Wed, 06-Oct-21 Tue, 03-May-22
(Common Material)
205(1) Cement Mixed Approach Block for internal 57 Mon, 15-Mar-21 Mon, 10-May-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
bridge
205(2) Geogrid, 37.5KN/m 52 Mon, 01-Mar-21 Wed, 21-Apr-21 170 Wed, 06-Oct-21 Thu, 21-Apr-22
205(3) Geogrid, 75.0KN/m 65 Mon, 15-Mar-21 Tue, 18-May-21 170 Tue, 12-Oct-21 Wed, 27-Apr-22
205(5) Gravel Bag filled with Crushed Stone 2 Fri, 28-May-21 Sat, 29-May-21 160 Mon, 20-Sep-21 Thu, 24-Mar-22
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
RL. WT.
Duration
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structura Works (Part D)
207(1)c Reinforcing Steel, Grade 60 for Structure in 283 Mon, 12-Apr-21 Wed, 19-Jan-22 172 Sat, 25-Sep-21 Wed, 13-Apr-22 5 2.280%
Depot
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22 6 0.195%
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22 13 0.014%
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22 5 0.736%
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22 12 0.019%
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22 3 1.363%
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22 2 1.170%
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21 6 0.009%
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21 5 0.015%
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22 10 0.249%
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7 0.001%
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22 7 2.632%
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22 4 1.241%
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22 5 2.484%
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
3E-05
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
5E-05 5E-05 5E-05
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
0.00103 0.00103
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
3E-05 3E-05
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
0.001%
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
0.00439 0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103 0.00103
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
0.00226 0.00226
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
0.00092 0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091 0.00091
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
0.0005 0.0005 0.0005 0.0005 0.0005
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
0.00439 0.00439 0.00439
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
0.00226 0.00226 0.00226 0.00226 0.00226 0.00226 0.00226 0.00226 0.00226
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
0.014%
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
0.00092 0.00092
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
9.5E-05 9.5E-05
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
206(6)a Structural Cast in Situ Concrete, 40 MPa for 24 Mon, 03-May-21 Wed, 26-May-21 115 Mon, 08-Nov-21 Mon, 21-Mar-22
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 12-Apr-21 Tue, 13-Apr-21 2 Tue, 10-May-22 Wed, 11-May-22
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 88 Tue, 01-Jun-21 Fri, 27-Aug-21 162 Sat, 06-Nov-21 Fri, 13-May-22
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 5 Tue, 01-Jun-21 Sat, 05-Jun-21 15 Wed, 01-Jun-22 Fri, 17-Jun-22
206(6)i Structural Concrete, 40 MPa for Retaining Wall 163 Mon, 09-Aug-21 Tue, 18-Jan-22 114 Mon, 29-Nov-21 Sat, 09-Apr-22
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 156 Mon, 02-Aug-21 Tue, 04-Jan-22 137 Wed, 06-Oct-21 Mon, 14-Mar-22
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 1 Mon, 05-Apr-21 Mon, 05-Apr-21 43 Mon, 18-Oct-21 Mon, 06-Dec-21
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 1 Tue, 06-Apr-21 Tue, 06-Apr-21 12 Mon, 27-Sep-21 Sat, 09-Oct-21
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 8 Wed, 07-Apr-21 Wed, 14-Apr-21 25 Tue, 01-Feb-22 Tue, 01-Mar-22
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Thu, 15-Apr-21 Thu, 15-Apr-21 1 Wed, 10-Nov-21 Wed, 10-Nov-21
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 1 Fri, 16-Apr-21 Fri, 16-Apr-21 120 Mon, 08-Nov-21 Sat, 26-Mar-22
Assemblies
Miscellaneous Structures (Part E) 78 Tue, 01-Jun-21 Mon, 30-Aug-21 62 Mon, 25-Oct-21 Tue, 18-Jan-22
Plumbing & Sanitary Works (Part F) 64 Tue, 31-Aug-21 Fri, 12-Nov-21 53 Wed, 19-Jan-22 Sat, 02-Apr-22
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
BidDocs Detailed Schedule Revised Detailed Schedule Offset Start January February
RL. WT.
Duration
Bill No. Item Description Duration Start End Duration Start End Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
Structural Earth Works 105 Thu, 27-May-21 Sat, 25-Sep-21 87 Thu, 12-Aug-21 Sat, 11-Dec-21 3 1.125%
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2 2.419%
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22 2 0.657%
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22 2 0.471%
100.000%
Legend: Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time Commulative Accomplishment 0% 0% 0% 0% 0% 0% 0% 0%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
Legend: 0% 0% 0% 0% 0% 0% 0% 0% 1% 1% 1%
Notes / Remarks
BidDocs Schedule -Slack Time 0% 0% 0% 0% 0% 0% 0% 0% 1% 2% 3%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
Legend: 1% 1% 1% 1% 1% 1% 1% 1% 1% 0% 0%
Notes / Remarks
BidDocs Schedule -Slack Time 4% 5% 6% 8% 9% 10% 11% 12% 13% 14% 14%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
Legend: 0% 0% 0% 0% 0% 0% 2% 2% 2% 3% 4%
Notes / Remarks
BidDocs Schedule -Slack Time 14% 14% 14% 15% 15% 15% 17% 19% 21% 24% 27%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
SUBBASE AND BASE COURSE 20 Mon, 04-Jul-22 Fri, 29-Jul-22 0.0001 0.0001 0.0001
Legend: 4% 4% 4% 4% 4% 4% 4% 5% 4% 4% 2%
Notes / Remarks
BidDocs Schedule -Slack Time 31% 35% 39% 43% 47% 51% 55% 60% 64% 68% 71%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22
0.00242 0.00242 0.00242 0.00242 0.00242 0.00242
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
0.00066 0.00066
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
0.00052 0.00052 0.00052 0.00052 0.00052
RIVER BANK PROTECTION WORKS FOR
DOLORES 152 Mon, 02-Aug-21 Tue, 25-Jan-22 190 Wed, 05-May-21 Tue, 25-Jan-22
RIVER
N.DEPOT SUB STATION 20 Fri, 05-Nov-21 Sat, 27-Nov-21 20 Fri, 05-Nov-21 Sat, 27-Nov-21
Legend: 3% 3% 2% 2% 2% 3% 2% 2% 2% 2% 2%
Notes / Remarks
BidDocs Schedule -Slack Time 74% 76% 79% 81% 83% 86% 88% 90% 92% 94% 96%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
0.00016 0.00016
Legend: 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 1%
Notes / Remarks
BidDocs Schedule -Slack Time 96% 97% 97% 97% 97% 97% 97% 97% 97% 98% 99%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: Jan 23, 2021 (Saturday)
Project Finish: Mar 15, 2022 (Tuesday)
No. of Months: 14
Drainage System & River Bank Protection 53 Mon, 29-Nov-21 Fri, 28-Jan-22 46 Thu, 06-Jan-22 Thu, 10-Mar-22
STRUCTURAL WORKS 63 Mon, 18-Oct-21 Wed, 29-Dec-21 53 Wed, 01-Dec-21 Fri, 11-Feb-22
Drainage Work 54 Thu, 25-Nov-21 Wed, 26-Jan-22 45 Wed, 05-Jan-22 Tue, 08-Mar-22
0.00016 0.00016
Legend: 1% 1%
Notes / Remarks
BidDocs Schedule -Slack Time 99% 100%
BidDocs Schedule
Revised Schedule Dist. Bet. BDS to RS Start Date Revised Schedule
Northern Builders
Project Schedule
Project: Malolos-Clark Railway Project - Civil & Buuilding Works (Package CP N-05)
Sub-Con: Northern Builders
Project Start: May 05, 2021 (Wednesday)
Project Finish: Jul 29, 2022 (Friday)
No. of Months: 14
201(3)a Structures Excavation for Geosynthethic Reinforced Soil 49 Tue, 07-Sep-21 Fri, 12-Nov-21 7
Structure (GRS), Integral Bridge, Retaining Wall, Electrical
Manholes and Detention Basins
103(1)b Embankment (Using Common Excavation Soil) 70 Fri, 27-Aug-21 Thu, 02-Dec-21 6
103(1)c Embankment for At grade section for Depot 74 Mon, 11-Oct-21 Thu, 20-Jan-22 7
(Selected Borrow Material)
205(7) Embankment for GRS and Integral Bridge 118 Wed, 06-Oct-21 Fri, 18-Mar-22 6
(Common Material)
205(1) Cement Mixed Approach Block for internal 108 Wed, 06-Oct-21 Fri, 04-Mar-22 7
bridge
205(5) Gravel Bag filled with Crushed Stone 88 Mon, 20-Sep-21 Wed, 19-Jan-22 4
206(6)a Structural Cast in Situ Concrete, 40 MPa for 115 Mon, 08-Nov-21 Sat, 16-Apr-22 6
GRS
206(6)b Structural Cast in Situ Concrete, 28 MPa for 2 Mon, 10-May-21 Tue, 11-May-21 1
Electrical Manhole
206(6)g Structural Cast in Situ Concrete, 40 MPa for 162 Sat, 06-Nov-21 Tue, 21-Jun-22 5
Integral Bridge
103(5) Grade Stabilized Crushed Stone (M-40) 15 Wed, 01-Jun-22 Tue, 21-Jun-22 12
206(6)i Structural Concrete, 40 MPa for Retaining Wall 114 Mon, 29-Nov-21 Thu, 05-May-22 3
(include waterstop at construction joint)
205(6) Forming Anchor & Stopper for GSR and 137 Wed, 06-Oct-21 Thu, 14-Apr-22 2
Integral Bridge
206(10)c Blind Layer Concrete/Lean Concrete (t=100mm),15 MPa for 43 Mon, 18-Oct-21 Wed, 15-Dec-21 6
Earth Retaining System (GRS method), including Crushed
Stone layer (200mm)
206(10)f Blinding Layer Concrete/Lean Concrete (t=100mm), 15 MPa 12 Mon, 27-Sep-21 Tue, 12-Oct-21 5
for, Integral Bridge, Including Crushed Stone Layer
(200mm)
206(10)i Blinding Layer Concrete/Lean Concrete (t=50mm), 15 MPa 25 Tue, 01-Feb-22 Mon, 07-Mar-22 10
for Retaining Wall, including compacted crushed stone
layer (200mm)
206(10)j Blind Layer Concrete/ Lean Concrete (50mm) 15 Mpa for 1 Wed, 10-Nov-21 Wed, 10-Nov-21 7
Miscellaneous Manholes in Main Line and Depot, including
compacted sand layer(150mm)
209(5) Miscellaneous Steelwork - Expansion Joint 120 Mon, 08-Nov-21 Sat, 23-Apr-22 7
Assemblies
Drainage System & River Bank Protection 46 Thu, 06-Jan-22 Thu, 10-Mar-22 2
Legend: Notes /
BidDocs Schedule Remarks