You are on page 1of 2

2021-10-02

MR. ERIC CRUZ

Blk 40 lot 15 Parkway Settings Nuvali

RE: COST PROPOSAL

Mr. Eric Cruz and Ms. Kim De Guzman,

We are pleased to present our quotation for the below mentioned items:

PROJECT: HOUSE EXTENSION


LOCATION: AVIDA SETTINGS NUVALI
COST BREAKDOWN:
Item Description Qty Unit Total Amount (PHP)
Div. 01 General Requirements 1 lot 106,511.71
Div. 02 Earthworks 1 lot 25,494.98
Div. 03 Structural Works 1 lot 257,617.86
Div. 04 Masonry Works 1 lot 167,715.41
Div. 05 Roofing Works 1 lot 188,322.31
Div. 06 Doors & Windows 1 lot 75,660.00
Div. 07 Finishing Works 1 lot 203,828.26
Div. 08 Plumbing Works 1 lot 39,847.96
Div. 09 Electrical Works 1 lot 85,131.25
Div. 10 Metal Works 1 lot 16,200.00
Total Direct Cost     1,166,329.74
Overseas, Contingencies, & Miscellaneous (12%)     139,959.57
Profit (8%)     93,306.38
Total Indirect Cost     233,265.95
Total Amount     1,399,595.69
*NOTE: Tiles, Water Supply, Electrical Supply, Furnitures and Fixtures are OSM (OWNER SUPPLIED MATERIAL) AND EXCLUDED
FROM THE QUOTATION.
TERMS & CONDITIONS
1. Terms of Payment: 30% down payment; 80% will be on progress billing.
2. Government and building permits are not included in the above given costs.
3. Processing of building and working permits must be processed by the client.
4. Above cost are exclusive of 12% VAT
5. Mobilization costs outside Metro Manila will incur an additional cost of PHP 3,000.00.

We trust that our offer meets your requirements and merits your kind approval. Please feel free to call our office hot-line nos. Or we will
be glad to sit down with you to further discuss our proposal at your convenience.

We look forward to be of service to your requirements. Thank you.

Prepared
by:

MR. REY LEONARD M. AMORATO MR. GENO PAULO BARCELO


Architect / S&M Officer General Manager
Noted by:

You might also like