L&T CONSTRUCTION QUALITY MANAGEMENT SYSTEM

WATER & EFFLUENT TREATMENT IC PROJECT QUALITY MANUAL


INSPECTION TEST PLAN LTCD/WET/PQM/ITP/F01 REV-00

Project Name: Development of Sewerage Collection, Treatment and Reuse System including Operation & Maintenance Date:
for Zone 1,2,3 & Specified Area at Naya Raipur Page: 01 of 01
EOT CRANE INSTALLATION

Sl.N Activity / Quantum of Acceptance Format of MND /


Characteristics to be checked Method of check Ref. Doc. \ Code Responsibility L&T TPI
o. Process Check Criteria Record NRDA

As per
Invoice &
Techinal
Receipt of Identificattion marks,condition of Visual and required
1 100% IS 3177, IS 807 Speciifications/ QA/QC Engineer P/W R V
Material equipments,certified documents Dimensional Check documents as
Contract
per QAP
documents

Technical
Specification in
Civil level clearance from the Approval Erection Execution Engg./
2 Contracts,LE13154 Permission RFI Number P/W R V
respective personnels(if Required) Documents/ RFI points Section Incharge
2-M-WW-SW-DS-
1157 Rev C

As per the
installation manual, LTCD/WET/ER
Visual and Tolerance Execution Engg./
3 Long Travel Wheel Base alingment 100% Technical spec, /EOT/QSF-MR P/W R V
Dimensional Check allowed ±1mm Section Incharge
LE131542-M-WW- 01
Erection of SW-DS-1157 Rev C
EOT and
HOT cranes As per the
For 40 mtrs,
installation manual, LTCD/WET/ER
Visual and max Execution Engg./
4 Trolley wheel span Alingment 100% Technical spec, /EOT/QSF-MR P/W R V
Dimensional Check tolerances ± Section Incharge
LE131542-M-WW- 01
6mm
SW-DS-1157 Rev C

EN 8, EN 9,Approve
LTCD/WET/ER
drawings,Techinical Tolerance Execution Engg./
5 Trolley wheel Base Visual check 100% /EOT/QSF-MR P/W R V
Annexure, allowed ±3mm Section Incharge
01
Installation Manual
Sl.N Activity / Quantum of Acceptance Format of MND /
Characteristics to be checked Method of check Ref. Doc. \ Code Responsibility L&T TPI
o. Process Check Criteria Record NRDA

Long Travel-
Approved drawings, tolerance LTCD/WET/ER
Difference in diagonal of Long travel Execution Engg./
6 Visual 100% installation manuals, ±5mm Trolley /EOT/QSF-MR P/W R V
and Trolley Section Incharge
IS 3177, IS 817 Tolerance 01
±3mm

As per the
installation manual, LTCD/WET/ER
wheel base alingment with girder and Tolerance Execution Engg./
7 Visual 100% Technical spec, /EOT/QSF-MR P/W R V
trolley allowed±5mm Section Incharge
LE131542-M-WW- 01
SW-DS-1157 Rev C

IS 15560( latest LTCD/WET/ER


Type of hook and head room Visual check and Tolerance±3m Execution Engg./
8 100% amendment),Techni /EOT/QSF-MR P/W R V
provided measurement m Section Incharge
cal Annexure 01

Erection of As per Technical upto the LTCD/WET/ER


9 EOT and Drive and Idler Mechanism, Visual and trail runs 100% Annexure, functionality of
Execution Engg./
/EOT/QSF-MR P/W R V
HOT cranes Gear/Motor/brake/Wheels Approved Drawings. Mechanism
Section Incharge
01

12mtrs,=span/
Review of As per the code of LTCD/WET/ER
Test certificates from 600for greater Execution Engg./
10 Maximum allowable deflection span Materials Manufacture IS817, /EOT/QSF-MR P/W R V
Vendor than 12 Section Incharge
certificates IS 3177 01
mtrs=span/750

shall be of LTCD/WET/ER
buffer and the ends to shock Every As per the erection Execution Engg./
11 Visual rubber or /EOT/QSF-MR P/W R V
absorbers Location manual Section Incharge
spring 01
contruction of
IS 3938, as per the the wire rope LTCD/WET/ER
visual check, Execution Engg./
12 Wire rope installation 100% Technical annexure and load /EOT/QSF-MR P/W R V
embrossement Section Incharge
in the contract carrying 01
capacity
LEGENDS: P - Performer, R - Review, W - Witness, V - Verification, H - Hold, R/W - Random Witness , TPI - Vendor Side Engineer

Prepared By (For L&T): Approved By:

© LARSEN & TOUBRO LIMITED –CONSTRUCTION 2015– ALL RIGHTS RESERVED


L&T CONSTRUCTION FORMAT NO:
LTCD/WET/ER/EOT -HOT/QSF-MR 01
WATER & EFFLUENT TREATMENT IC

EOT/HOT INSTALLATION REPORT DATE:


Sewerage Collection, Treatment and Reuse System including Operation & Maintenance for Zone 1,2,3 & Specified Area at Naya Raipur
Project Name UGDS-NRDA-LE131542
Area/Location Time
Referance Drawing Report No

Activity / Process Characteristics to be checked Accepted Rejected Remarks

Long Travel and Trolley wheel to


upto the allowed Tolerances
base alingments

Difference in Diagonal Longtravel


as per tolerance limited
and Trolley

Wheel base to girder and trolley noise and vibration, check for
alingment jolting

Buffer placement and wire rope check placement of buffer and rope
Erection of EOT and Fitup drum limit switches
HOT cranes
Hook head room and dead zone Alignment verify

Grease in the plumbe block of LT Bolts check

Proper fixing check/ check noise


Drive and Idler Meachanism check
and Vibartions

Brakes installation and check Slippage allowed 50-60mm

weld visual, check for porosity,


Welding on the Beam
cracks, melt out, misalingment

Comments if any:

Performed by Inspected by
© LARSEN & TOUBRO LIMITED –CONSTRUCTION 2015– ALL RIGHTS RESERVED