You are on page 1of 2

NAME: RONIEL JOSEPH PURCIA FIELDWORK NO.

3
COURSE & SEC: BSCE – 2A CE214
PROFESSOR: ENGR. ROMEO SANTOS SEPTEMBER 15, 2021

TITLE:  Profile Levelling


Objectives:
1. Determine the elevation of road center line
2. Plot the profile of the road 

Procedure:
1. Create an imaginary center line of a road measuring 200 meters.
2. Along this line, establish stations 20 meters apart beginning at 0+000 and ending to 0+200.  
Also, within the vicinity of the center line establish five (5) benchmarks; Indicate on the drawing the assumed description
of the benchmarks
3.  Plot the profile of the road.

STATION BACKSIGHT FORESIGHT I.F.S ELEVATION H.i REMARKS


BM#1 0.8 75 75.8
BM#2 0.9 1.1 74.4 75.3
0+000 1.0 74.8
+020 0.7 75.1
+040 1.5 74.3
BM#3 1.2 1.4 73.9 75.1
+060 1.3 72.6
+080 1.1 72.8
BM#4 1.5 1.7 73.4 74.9
+100 1.5 71.9
+120 1.7 71.7
+140 1.3 72.1
BM#5 0.7 74.2 74.9
+160 1.1 73.1
+180 0.9 73.3
+200 0.6 73.6
BM#5

+200m
BM#3 BM#4
+180m
BM#1ELE:
75m +040m +060m +160m
+080m
+020m +100m +140m
+120m

0+000m BM#2

PROFILE
76

75
ELEVATION

74

73

72

71

70
0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160 0+180 0+200

STATION