What should be checked prior to Risk Assessment?

Choose one or more options


——_

Which equipment and tools are involved?


Ee

Which personnel is involved?

What is the task environment?

| Is there any existing procedure?


SS

Result: : 5% 2 of 20
° NEXT
Risk Assessment 28:04

What should normally contain a verbal (sometimes written)


informal risk assessment, which should be done prior any hazardous
job onboard

© Ship Specific Risk Assessment

© Personal Risk Assessment

© Generic Risk Assessment

@ Toolbox Talk |

Result: : 10% 3 of 20
° NEXT
Risk Assessment 27:45

cy Wearing a life vest while rigging a pilot ladder is an example of


... risk control measure

| @ Protection

© Substitution

© Organization

© Isolation

Result: . 15% 4 of 20
° NEXT
Risk Assessment 26:37

eg Which risk management measure is called “the last resort”?

© substitution by something less hazardous and risky

| @ personal protective equipment

© elimination

© written procedures that are known and understood by those affected

Result: : 20% 6 of 20
° NEXT
Risk Assessment 26:26

Risk must be always brought to a minimum level regardless the

|
Result: : 25% 7 of 20
° NEXT
Risk Assessment 25:00

Ee Process of evaluating the risk(s) arising from a hazard(s)


usually doesn't take into account the adequacy of any existing
controls

= |
Result: : 25% 8 of 20
° NEXT
Risk Assessment 24:16

ee Risk assessment must be always done in writing

7 |
Result: : 25% 9 of 20
° NEXT
Risk Assessment 22:42

How isolation risk control is usually implemented?

© Create a safer system of work and reduce the number of people exposed to the hazard

© All three options are correct

@ Prevent people from coming into contact with the hazard |

©, Eliminate the hazard

Result: : 25% 11
° of 20 NEXT
Risk Assessment 22:11

What can be potentially harmed as a result of hazardous


occurrence?
Choose one or more options
EEE

Environment

Property

Reputation

| People
SS

Result: : 30% 12
° of 20 NEXT
Risk Assessment 21:54

Any risk management will typically involve following stages:

Choose one or more options

| Risk Analysis and Evaluation |

Data Gathering, Familiarization and Hazards Identification |

(_] Incident investigation

| Risk Control |

Result: : 35% 13
° of 20 NEXT
Risk Assessment 21:26

What is a definition of Hazard?

© Itis the combination of the frequency and the severity of the consequence.

© Itis the probability, or frequency, of occurrence of a defined hazard.

©@ Itis the substance, situation or practice that has the potential to cause harm. |

© Itis the magnitude of the consequences of the occurrence of a defined hazard.

Result: . 40% 14
°
of 20
NEXT
Risk Assessment 21:16

To evaluate the risk is to consider the severity and the


likelihood to assess the realistic potential.

| @ True

© False

Result: : 45% 15
° of 20 NEXT
Risk Assessment 20:44

When we intend to control the risk, we are working with

Choose one or more options

(_} mitigation measures, which help to “soften” the situation if it is occurred, by reducing a severity

(_} preventive measures, which help to “soften” the situation if it is occurred, by reducing a severity

(_] mitigation measures, which help to reduce a likelihood of a hazard to occur

preventive measures, which help to reduce a likelihood of a hazard to occur |

Result: : 50% 16
° of 20 NEXT
Risk Assessment 20:31

As a result, risk shall be brought to ALARP (As low as


reasonable practicable) level

| @ True

© False

Result: : 53% 17
° of 20 NEXT
Risk Assessment 20:25

It is always better to reduce the severity of the hazard than the


likelihood

© True

| © False |

Result: : 58% 18
° of 20 NEXT
Risk Assessment 20:11

Hazard and Risk practically means the same

“© Fal
© True

Result: : 63% 19
° of 20 NEXT
Risk Assessment 19:37

What is a definition of Risk?

| ©@ Itis the probability, or frequency, of occurrence of a defined hazard.

© Itis the magnitude of the consequences of the occurrence of a defined hazard.

© Itis the substance, situation or practice that has the potential to cause harm.

© Itis the combination of the frequency and the severity of the consequence.

Result: : 68% 20 of 20
° NEXT
1. What are the main types of Hazards?

Your answer: Hazardous conditions, Hazardous substances, Hazardous acts

ANSWER CORRECT
Risk Assessment 28:31

Generic Risk Assessment is ...

© averbal (sometimes written) informal risk assessment, which should be done prior any hazardous job onboard

© personal safety assessment of a given situation

© done ona specific ship for a specific job

@ done by company for a job, which is common for all vessels |

Result: : 8% 3 of 20
° NEXT
Risk Assessment 23:47

The best risk assessment is the one done by a single person

© True

© False

Result: : 43% 10 o of 20 RT San


Risk Assessment 23:23

What are the parts of organizational risk control

Choose one or more options


EEE

adequate supervision and identification of training needs


SOs @—

EE

reducing the potential risk of the hazard by using a less risky option
7H

safe system of work that reduces the risk to an acceptable level


S2#«
—~S>

written procedures that are known and understood by those affected


SS

Result: : 48% 11
° of 20 NEXT
Risk Assessment 23:12

Risk assessment form for a specific task has to be created


once, and does not need to be reviewed

© © Fal
© True

Result: : 51% 12
° of 20 NEXT
Risk Assessment 22:59

Reducing a load to be lifted by a crane is an example of ... risk


control measure

© Elimination

© Isolation

© Protection

© Substitution |

Result: : 56% 13
° of 20 NEXT
Risk Assessment 22:46

Which risk management measure is the best?

© Substitution of hazard

© Isolation of hazard

©, Protection from hazard

©@ Elimination of hazard |

Result: . 61% 14
°
of 20
NEXT
Risk Assessment 22:36

What is a definition of Severity?

© tis the probability, or frequency, of occurrence of a defined hazard.

© Itis the substance, situation or practice that has the potential to cause harm.

© Itis the combination of the frequency and the severity of the consequence.

©@ Itis the magnitude of the consequences of the occurrence of a defined hazard. |

Result: : 66% 15
° of 20 NEXT
Risk Assessment 21:36

What is a definition of Likelihood?

© Itis the combination of the frequency and the severity of the consequence.

| @ Itis the probability, or frequency, of occurrence of a defined hazard.

© Itis the substance, situation or practice that has the potential to cause harm.

© Itis the magnitude of the consequences of the occurrence of a defined hazard.

Result: 81% @ 18 of 20 SG
Risk Assessment 21:23

Risk should be reduced to a level that is as low as is


reasonably practicable

| @ True

© False

Result: 86% @ 19 of 20 SG