You are on page 1of 1

Chandpur Power Generations Ltd.

OPERATION DAILY LOG BOOK


SHIFT: ………………………….
GROUP: …………………….
SHIFT TIMING: To HRS DATE: …….../………/………….

Shift Personnel: 1 …………………… 2 …………………….. 3 ……………………… 4 …………………….. 5 ……………………….. 6 .…………………………… 7 ………………………… 8 ………………………9………………………..10……………………….

SHIFT RECEIVING STATUS ENERGY STATUS AT 00:00 Hrs PLF- STATUS AT 00:00 Hrs
Engine no. DG- 01 DG-02 DG-03 DG-04 DG-05 DG-06 Total Generation Last 24 hrs(Kwh) Month To
Last 24 Hrs Year To Date
Engine Status/Load Energy Meter Reading At 00:00Hrs(Kwh) Date
Power Factor Total Dispatch Last 24:00 Hrs (Kwh)
Operation Priority
TC Wet Wash due FUEL CONSUMPTION STATUS AT 00:00 Hrs FUEL BALANCE STATUS AT 00:00 Hrs
TC Dry wash due HFO Consumption Last 24 Hrs,MT HFO,MT
LFO Consumption Last 24 Hrs,MT LFO,MT
DECLARED AVAILABILITY LDC'S DEMAND PRESENT DESPATCH LO Consumption Last 24 Hrs,MT LO,MT
Avg.Power Factor
MW Mvar MW Mvar MW Mvar

SHIFT RUNNING SUMMARY


LDC LOAD DEMAND & DISPATCH REQUEST STATUS ENGINE START /STOP/TRIP STATUS
SL. NO. TIME FROM TO DEMAND(MW) DISPATCH(MW) NLDC CONTACT PERSON Remarks STARTING STOPING TRIPPING H/O TO T/O FROM
ENGINE No. REMARKS
1 TIME TIME TIME MAINT. MAINT.
2
3
4
5
6
7
8
9
10
11
12
13
14
15

EXPANSION VESSEL LEVEL & FRESH WATER TOP UP STATUS TO ENGINE COOLING SYSTEM
Engine no. DG- 01 DG-02 DG-03 DG-04 DG-05 DG-06
HT LEVEL
LT LEVEL
Water added Qty,L(HT)
Water added Qty,L(LT)

Purpose/Cause of water
filling

MAINT.WATER TANK LEVEL % TOP UP CHEMICAL ADD LEVEL%


REPLENSHING TANK LEVEL % TOP UP CHEMICAL ADD LEVEL% OBSERVATION/DISCREPENCY/MISCELLENEOUS EVENTS/NOTES
ENGINE LUBE OIL SUMP LEVEL
TIME DG- 01 DG-02 DG-03 DG-04 DG-05 DG-06

ENGINE'S SUMP OIL TOP UP, SWEETENING AND DAILY CONSUMPTION

Sump Level Flow Meter Reading Daily LO


Level at Added Sweetened Level at
Engine no. consumpti Remarks MAINTENANCE REQUEST
00:00 Hr Qty(Liter) (Ltrs) 24:00 Hr
Bef Top- After Top- on (Liters)
Initial Final Unit Observation/Problem
up(cm) up(cm)
OR-01
OR-02
OR-03
OR-04
OR-05
OR-06
SLOC = Cost = BDT. Total=
PARTS MOVEMENT/INTERCHANGE STATUS
Unit Description of Parts movement/interchange

SHIFT LEAVING STATUS


Engine no. DG-01 DG-02 DG-03 DG-04 DG-05 DG-06 OTHERS NOTES
Engine Status/Load
LO Separator Status
Preheat JWT,°C
FO temp eng inlet,°C
DECLARED AVAILABILITY LDC'S DEMAND PRESENT DESPATCH Avg.POWER
MW Mvar MW Mvar MW Mvar FACTOR

PLEASE CHECK THE APPROPRIATE BOXES:


HFO Separator in service 1 2 3
HFO Feed pump in service 1 2
HFO transfer pump in service 1 2
HFO Storage Tank in Service 1 2
HFO Storage Tank Return Line in Service 1 2
Aux Boiler in service Yes No
EGB in service 1 2 3
Boiler Feed water pump in service 1 2
Starting Air Compressor in service 1 2
Instrument Air Compressor in service 1 2
WTP in operation Yes No
Treated Water Tank Level Normal Low
HFO Storage Tank-01 Level & Temp % ◦C
HFO Storage Tank-02 Level & Temp % ◦C
HFO Day- Tank-1Level & Temp % ◦C
HFO Day Tank-2 Level & Temp % ◦C
HFO Buffer Tank Level & Temp % ◦C
HFO Separator Delivery to Day-1 Day-2 Buffer
Sludge Tank Level %
Oily Water Buffer Tank Level %
Walkie-Talkie Handed Over Pcs
Mobile Phone Handed Over Pcs
Pendrive Handed Over Yes No
Temperature Gun Handed Over Yes No
FTP : HFO Auto Filter Flash Counter
Booster Flash Counter
1
DG # 05 2
DG # 06 3
Outgoing Shift-In-Charge Incoming Shift-In-Charge

Name Sign Name Sign

You might also like