Eastern United Petroleum Services

WELL TEST REPORT


CLIENT Wafra Joint Operations (WJO)
CONTRACT JO/SA260/PO21
WELL HUM-23A
S/C SC-25
DATE 06-Oct-2022

Eastern United Petroleum Services


Eastern United Petroleum Services

INDEX
1.WELL TESTING DATA SUMMARY

2.WELL TESTING DATA SHEET

3.OIL RATE CALCULATION SHEET

4.GAS RATE CALCULATION SHEET

5.DIFFERENTIAL PRESSURE CHARTS

6.SURFACE EQUIPMENT LAYOUT

7. SEQUENCE OF EVENTS

8. PARAMETERS CHART TRENDS

Eastern United Petroleum Services


Eastern United Petroleum Services

WELL TESTING DATA SUMMARY

Eastern United Petroleum Services


Field : HUMMA WELL TESTING UNIT
Well : HUM-23A Eastern United Petroleum Services
S/C : SC-25 WELL TESTING DATA SUMMARY Identification Number: ESWT03
Date : 6-Oct-2022 Operator name: ABDUL GHANI

Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.

dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 12:00 06/10/2022 15:00 3:00 128+128 125 216 280 206 N 214 105 100

Type ESP

ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load

psia Hz F amps V inch amps amps


N/A N/A N/A N/A 384

Total GOR Specific Gravity Shrinkage CO2


Total Liquid Rate Total BS&W Gas Rate GOR1 Oil Rate Water Rate GOR2 Water Salinity
1+2 factor
Oil Gas
SG (1-Shrinkage)
bbl/d % Mscf/d SCF/bbl bbl/d bbl/d SCF/bbl SCF/bbl ppm SG @60 ºF %
(air = 1) @ 60 ºF
874.19 0.00 359.465 411.20 874.19 0.00 78.69 489.89 N/A 0.870 0.820 0.962 0.8
General comments:-HUM-23A has been flowing artificially by ESP through a 3"flowline with a back pressure valve.
Started flow period through fixed choke128+128/64".
The well was producing under stable conditions throughout the period of the test.
General comments
The data given here are the average readings of entire flow period.
The test was witnessed by JO POD Engineer:- Mr.SAYEED AL-DOSSARY.
Note:-ESP downhole sensor was not available and Frequency was not visible.
Eastern United Petroleum Services

WELL TESTING DATA SHEET

Eastern United Petroleum Services


HUM-23A
Unit ESWT03
HUMMA
6/10/2022 Data Sheet
BOTTOM HOLE WELL HEAD SEPARATOR OIL OR CONDENSATE GAS GOR WATER Total liquid rate
DATE Time
Pressure Temp. Choke WHT Tg.pres. Gc.pres. Temp. Press. Rate Gravity BSW Rate Gravity GOR1 GOR2 GORT RATE Salinity WLR RATE
yyyy/mm/dd hh:mm psia degF /64" degF psig psig degF psig BOPD g/cc % MSCFD Air=1 SCF/ bbl BWPD PPM % BBLS/D

06-October-2022
2022/10/06 11:30 ESWT#3 arrived on location well no : HUM-23A.
2022/10/06 11:33 Held safety meeting prior to rig up.
2022/10/06 11:35 Checked well Existing conditions :- WHP=214 psig .GC=200 psig .
2022/10/06 11:37 Started spot equipment, commenced rig up .
2022/10/06 11:47 Completed rig up and started to perform pressure test.
2022/10/06 11:52 Completed pressure test for U/S and D/S @ 750 psig (OK).
2022/10/06 11:54 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
2022/10/06 11:56 Diverted flow to separator .
2022/10/06 11:58 Lowered 0.750" orifice plate into gas line.
2022/10/06 12:00 Started Flow measurements .

2022/10/06 12:15 128+128 130 215 205 104 213 865.42 0.870 0.00 359.760 0.820 415.70 78.29 494.00 0.00 N/A 0.00 865.42
2022/10/06 12:30 128+128 128 215 205 105 213 869.73 0.870 0.00 372.232 0.820 427.98 78.35 506.33 0.00 N/A 0.00 869.73
2022/10/06 12:45 128+128 127 215 205 106 213 887.88 0.870 0.00 360.793 0.820 406.35 78.36 484.71 0.00 N/A 0.00 887.88
2022/10/06 13:00 N/A N/A 128+128 129 215 205 105 213 859.57 0.870 0.00 369.942 0.820 430.38 78.31 508.69 0.00 N/A 0.00 859.57
2022/10/06 13:15 128+128 121 215 205 103 213 867.97 0.870 0.00 354.416 0.820 408.33 78.43 486.75 0.00 N/A 0.00 867.97
2022/10/06 13:30 128+128 126 217 206 106 215 866.32 0.870 0.00 358.805 0.820 414.17 78.80 492.97 0.00 N/A 0.00 866.32
2022/10/06 13:45 128+128 128 216 206 106 214 871.66 0.870 0.00 355.229 0.820 407.53 78.58 486.12 0.00 N/A 0.00 871.66
2022/10/06 14:00 N/A N/A 128+128 121 216 206 106 214 868.32 0.870 0.00 360.448 0.820 415.11 78.74 493.85 0.00 N/A 0.00 868.32
2022/10/06 14:15 128+128 129 218 208 105 216 874.47 0.870 0.00 353.917 0.820 404.72 79.13 483.85 0.00 N/A 0.00 874.47
2022/10/06 14:30 128+128 121 218 208 104 216 890.93 0.870 0.00 361.802 0.820 406.09 79.21 485.31 0.00 N/A 0.00 890.93
2022/10/06 14:45 128+128 124 217 207 106 215 878.46 0.870 0.00 353.719 0.820 402.66 79.01 481.67 0.00 N/A 0.00 878.46
2022/10/06 15:00 N/A N/A 128+128 121 217 207 107 215 889.60 0.870 0.00 352.524 0.820 396.27 79.06 475.33 0.00 N/A 0.00 889.60
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

OIL RATE CALCULATION SHEET

MEASUREMENT WITH METER

Vnet = Vo x OMF x ( 1 - Shr ) x K x (1 - BSW )

Vnet Corrected Oil Volume


Vo Volume of oil recorded by meter
OMF Meter factor
(Physical inaccuracy in meter when checked before the job with water)
Shrinkage Factor (1-SHR) is estimated based on KATZ Data.
K factor = 1 as KATZ table gives Shrinkage Factor already at 60 degF.

Eastern United Petroleum Services


HUM-23A
HUMMA
06-October-2022 Oil Rate Measurement
DATE TIME METER OIL 1-Shr OIL GRAVITY Net volume Net STO Cumulative API
Time
cumul READING Temp Vs BSW V'O* Temp. Gravity Temp. Grav. 60°F OMF k of STO. Vo product. rate Production Gravity
Factor
yyyy/mm/dd hh.mm Mins bbl degF bbl % bbl degF g/cc degF g/cc bbl BOPD bbls at 60°F

06-October-2022

2022/10/06 12:15 15 9.4 121 9.37 0.00 9.37 0.962 60 0.870 60 0.870 1.000 1.000 9.01 865.4 9.01 31.2
2022/10/06 12:30 30 18.8 118 9.42 0.00 9.42 0.962 60 0.870 60 0.870 1.000 1.000 9.06 869.7 18.07 31.2
2022/10/06 12:45 45 28.4 118 9.62 0.00 9.62 0.962 60 0.870 60 0.870 1.000 1.000 9.25 887.9 27.32 31.2
2022/10/06 13:00 60 37.7 118 9.31 0.00 9.31 0.962 60 0.870 60 0.870 1.000 1.000 8.95 859.6 36.28 31.2
2022/10/06 13:15 75 47.1 119 9.40 0.00 9.40 0.962 60 0.870 60 0.870 1.000 1.000 9.04 868.0 45.32 31.2
2022/10/06 13:30 90 56.5 118 9.39 0.00 9.39 0.962 60 0.870 60 0.870 1.000 1.000 9.02 866.3 54.34 31.2
2022/10/06 13:45 105 65.9 119 9.44 0.00 9.44 0.962 60 0.870 60 0.870 1.000 1.000 9.08 871.7 63.42 31.2
2022/10/06 14:00 120 75.4 119 9.41 0.00 9.41 0.962 60 0.870 60 0.870 1.000 1.000 9.04 868.3 72.47 31.2
2022/10/06 14:15 135 84.8 119 9.47 0.00 9.47 0.961 60 0.870 60 0.870 1.000 1.000 9.11 874.5 81.58 31.2
2022/10/06 14:30 150 94.5 120 9.65 0.00 9.65 0.961 60 0.870 60 0.870 1.000 1.000 9.28 890.9 90.86 31.2
2022/10/06 14:45 165 104.0 119 9.52 0.00 9.52 0.961 60 0.870 60 0.870 1.000 1.000 9.15 878.5 100.01 31.2
2022/10/06 15:00 180 113.6 119 9.64 0.00 9.64 0.961 60 0.870 60 0.870 1.000 1.000 9.27 889.6 109.27 31.2
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

GAS RATE CALCULATION SHEET

GAS RATE MEASURED BY DANIEL ORIFICE PLATE METER


Reference is made to the rules and coefficients given in AGA gas measurement comittee report No 3
for orifice metering.
Q = C x SQRT( hw x Pf)
Q : Production rate at reference conditions.
C : Orifice flow coefficient.
hw : Differential pressure in inches of water.
Pf : Flowing pressure in psia.
C = Fu x Fb x Fg x Y x Ftf x Fpv
Fu : Unit conversion factor in desired reference conditions.
Fb : Basic orifice factor ( Q in Cu.ft / hour ).
Fg : Specific gravity factor.
Y : Expension factor
Ftf : Flowing temperature factor.
Fpv : Supercompressibility factor ( estimated ). Table of Fu factor
Reference conditions
Remarks: Units 60 deg.F 0 degC 15 degC 15 deg.C
Fm : Manometer factor is equal one since only bellows type meters are used. 14.73 psia 760 mmHg 760 mmHg 750 mmHg
Fr : Reynolds factor is considered to be one. Cu.ft / hour 1 0.9483 1.0004 1.0137
Fpv : All coefficients are taken from AGA NX 19 manual for natural gas Cu.ft / day 24 22.76 24.009 24.329
More accurate values could only be determined by laboratory measurement.
m3 / hour 0.02832 0.2685 0.02833 0.0287
m3 / day 0.6796 0.6445 0.6799 0.6889

Eastern United Petroleum Services


HUM-23A

06-October-2022 HUMMA Gas Rate Measurement


Flowing SQR Orifice GAS Gas Production Cumul
DATE Time Cumul Pf Hw H2S CO2
Temp.
Hw * Pf Diameter Gravity Fb Fg Y Ftf Fpv C Rate Production
yyyy/mm/dd hh:mm Minutes degF psia " H2O Inches (air=1) MSCF/Day MSCF PPM %

06-October-2022 Gas Rate Measurement

2022/10/06 12:15 15 104 228 62 118.44 0.750 0.820 115.62 1.1043 1.0033 0.9602 1.0289 126.561 359.760 3.747 100 0.8
2022/10/06 12:30 30 105 228 66 122.65 0.750 0.820 115.62 1.1043 1.0036 0.9594 1.0287 126.453 372.232 7.625 100 0.8
2022/10/06 12:45 45 106 228 62 118.99 0.750 0.820 115.62 1.1043 1.0033 0.9588 1.0286 126.342 360.793 11.383 100 0.8
2022/10/06 13:00 60 105 228 65 121.93 0.750 0.820 115.62 1.1043 1.0035 0.9592 1.0286 126.416 369.942 15.237 100 0.8
2022/10/06 13:15 75 103 228 60 116.56 0.750 0.820 115.62 1.1043 1.0032 0.9612 1.0291 126.698 354.416 18.929 100 0.8
2022/10/06 13:30 90 106 229 61 118.31 0.750 0.820 115.62 1.1043 1.0033 0.9589 1.0288 126.363 358.805 22.666 100 0.8
2022/10/06 13:45 105 106 229 60 117.18 0.750 0.820 115.62 1.1043 1.0032 0.9587 1.0286 126.312 355.229 26.366 100 0.8
2022/10/06 14:00 120 106 229 62 118.90 0.750 0.820 115.62 1.1043 1.0033 0.9586 1.0287 126.311 360.448 30.121 100 0.8
2022/10/06 14:15 135 105 230 59 116.59 0.750 0.820 115.62 1.1043 1.0031 0.9596 1.0291 126.480 353.917 33.808 100 0.8
2022/10/06 14:30 150 104 231 62 119.11 0.750 0.820 115.62 1.1043 1.0033 0.9600 1.0292 126.564 361.802 37.576 100 0.8
2022/10/06 14:45 165 106 230 59 116.75 0.750 0.820 115.62 1.1043 1.0032 0.9582 1.0287 126.243 353.719 41.261 100 0.8
2022/10/06 15:00 180 107 230 59 116.38 0.750 0.820 115.62 1.1043 1.0031 0.9580 1.0287 126.210 352.524 44.933 100 0.8
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

DIFFERENTIAL PRESSURE CHARTS

Eastern United Petroleum Services


Eastern United Petroleum Services

SURFACE EQUIPMENT LAYOUT

Eastern United Petroleum Services


HUM-23A
HUMMA

6-Oct-2022
Eastern United Petroleum Services

SEQUENCE OF EVENTS

Eastern United Petroleum Services


HUM-23A
06-October-2022
HUMMA
Time
hh:mm
SEQUENCE OF EVENTS
06-October-2022
11:30 ESWT#3 arrived on location well no : HUM-23A.
11:33 Held safety meeting prior to rig up.
11:35 Checked well Existing conditions :- WHP=214 psig .GC=200 psig .
11:37 Started spot equipment, commenced rig up .
11:47 Completed rig up and started to perform pressure test.
11:52 Completed pressure test for U/S and D/S @ 750 psig (OK).
11:54 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
11:56 Diverted flow to separator .
11:58 Lowered 0.750" orifice plate into gas line.
12:00 Started Flow measurements .
15:00 End of test . Bypass separator .
15:05 Started rig down surface lines.
15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

PARAMETERS CHART TRENDS

Eastern United Petroleum Services


WELL NUMBER | HUM-23A
FIELD NAME | HUMMA
550 450 370 4000 3000 8000
FLP
WHP
Static Press
Combined GORs
Gas Rate (Inst)
481 394 324 Total Fluids Rate 3500 2625 7000

CHOKE SIZE | 128+128


413 338 278 3000 2250 6000

Combined GORs (scf/bbl)


Total Fluids Rate (bbl/d)

Gas Rate (Inst) (Mscfd)


344 281 231 2500 1875 5000
Static Press (psi(g))

WHP (psi(g))
FLP (psi(g))

275 225 185 2000 1500 4000

206 169 139 1500 1125 3000

138 113 93 1000 750 2000

69 56 46 500 375 1000

0 0 0 0 0 0
12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45
October 06 2022 (Thursday)