INDEX
1.WELL TESTING DATA SUMMARY
7. SEQUENCE OF EVENTS
Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.
dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 12:00 06/10/2022 15:00 3:00 128+128 125 216 280 206 N 214 105 100
Type ESP
ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load
06-October-2022
2022/10/06 11:30 ESWT#3 arrived on location well no : HUM-23A.
2022/10/06 11:33 Held safety meeting prior to rig up.
2022/10/06 11:35 Checked well Existing conditions :- WHP=214 psig .GC=200 psig .
2022/10/06 11:37 Started spot equipment, commenced rig up .
2022/10/06 11:47 Completed rig up and started to perform pressure test.
2022/10/06 11:52 Completed pressure test for U/S and D/S @ 750 psig (OK).
2022/10/06 11:54 Diverted flow through choke manifold at fixed choke size (128+128)/64"on bypass Separator
2022/10/06 11:56 Diverted flow to separator .
2022/10/06 11:58 Lowered 0.750" orifice plate into gas line.
2022/10/06 12:00 Started Flow measurements .
2022/10/06 12:15 128+128 130 215 205 104 213 865.42 0.870 0.00 359.760 0.820 415.70 78.29 494.00 0.00 N/A 0.00 865.42
2022/10/06 12:30 128+128 128 215 205 105 213 869.73 0.870 0.00 372.232 0.820 427.98 78.35 506.33 0.00 N/A 0.00 869.73
2022/10/06 12:45 128+128 127 215 205 106 213 887.88 0.870 0.00 360.793 0.820 406.35 78.36 484.71 0.00 N/A 0.00 887.88
2022/10/06 13:00 N/A N/A 128+128 129 215 205 105 213 859.57 0.870 0.00 369.942 0.820 430.38 78.31 508.69 0.00 N/A 0.00 859.57
2022/10/06 13:15 128+128 121 215 205 103 213 867.97 0.870 0.00 354.416 0.820 408.33 78.43 486.75 0.00 N/A 0.00 867.97
2022/10/06 13:30 128+128 126 217 206 106 215 866.32 0.870 0.00 358.805 0.820 414.17 78.80 492.97 0.00 N/A 0.00 866.32
2022/10/06 13:45 128+128 128 216 206 106 214 871.66 0.870 0.00 355.229 0.820 407.53 78.58 486.12 0.00 N/A 0.00 871.66
2022/10/06 14:00 N/A N/A 128+128 121 216 206 106 214 868.32 0.870 0.00 360.448 0.820 415.11 78.74 493.85 0.00 N/A 0.00 868.32
2022/10/06 14:15 128+128 129 218 208 105 216 874.47 0.870 0.00 353.917 0.820 404.72 79.13 483.85 0.00 N/A 0.00 874.47
2022/10/06 14:30 128+128 121 218 208 104 216 890.93 0.870 0.00 361.802 0.820 406.09 79.21 485.31 0.00 N/A 0.00 890.93
2022/10/06 14:45 128+128 124 217 207 106 215 878.46 0.870 0.00 353.719 0.820 402.66 79.01 481.67 0.00 N/A 0.00 878.46
2022/10/06 15:00 N/A N/A 128+128 121 217 207 107 215 889.60 0.870 0.00 352.524 0.820 396.27 79.06 475.33 0.00 N/A 0.00 889.60
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
06-October-2022
2022/10/06 12:15 15 9.4 121 9.37 0.00 9.37 0.962 60 0.870 60 0.870 1.000 1.000 9.01 865.4 9.01 31.2
2022/10/06 12:30 30 18.8 118 9.42 0.00 9.42 0.962 60 0.870 60 0.870 1.000 1.000 9.06 869.7 18.07 31.2
2022/10/06 12:45 45 28.4 118 9.62 0.00 9.62 0.962 60 0.870 60 0.870 1.000 1.000 9.25 887.9 27.32 31.2
2022/10/06 13:00 60 37.7 118 9.31 0.00 9.31 0.962 60 0.870 60 0.870 1.000 1.000 8.95 859.6 36.28 31.2
2022/10/06 13:15 75 47.1 119 9.40 0.00 9.40 0.962 60 0.870 60 0.870 1.000 1.000 9.04 868.0 45.32 31.2
2022/10/06 13:30 90 56.5 118 9.39 0.00 9.39 0.962 60 0.870 60 0.870 1.000 1.000 9.02 866.3 54.34 31.2
2022/10/06 13:45 105 65.9 119 9.44 0.00 9.44 0.962 60 0.870 60 0.870 1.000 1.000 9.08 871.7 63.42 31.2
2022/10/06 14:00 120 75.4 119 9.41 0.00 9.41 0.962 60 0.870 60 0.870 1.000 1.000 9.04 868.3 72.47 31.2
2022/10/06 14:15 135 84.8 119 9.47 0.00 9.47 0.961 60 0.870 60 0.870 1.000 1.000 9.11 874.5 81.58 31.2
2022/10/06 14:30 150 94.5 120 9.65 0.00 9.65 0.961 60 0.870 60 0.870 1.000 1.000 9.28 890.9 90.86 31.2
2022/10/06 14:45 165 104.0 119 9.52 0.00 9.52 0.961 60 0.870 60 0.870 1.000 1.000 9.15 878.5 100.01 31.2
2022/10/06 15:00 180 113.6 119 9.64 0.00 9.64 0.961 60 0.870 60 0.870 1.000 1.000 9.27 889.6 109.27 31.2
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
2022/10/06 12:15 15 104 228 62 118.44 0.750 0.820 115.62 1.1043 1.0033 0.9602 1.0289 126.561 359.760 3.747 100 0.8
2022/10/06 12:30 30 105 228 66 122.65 0.750 0.820 115.62 1.1043 1.0036 0.9594 1.0287 126.453 372.232 7.625 100 0.8
2022/10/06 12:45 45 106 228 62 118.99 0.750 0.820 115.62 1.1043 1.0033 0.9588 1.0286 126.342 360.793 11.383 100 0.8
2022/10/06 13:00 60 105 228 65 121.93 0.750 0.820 115.62 1.1043 1.0035 0.9592 1.0286 126.416 369.942 15.237 100 0.8
2022/10/06 13:15 75 103 228 60 116.56 0.750 0.820 115.62 1.1043 1.0032 0.9612 1.0291 126.698 354.416 18.929 100 0.8
2022/10/06 13:30 90 106 229 61 118.31 0.750 0.820 115.62 1.1043 1.0033 0.9589 1.0288 126.363 358.805 22.666 100 0.8
2022/10/06 13:45 105 106 229 60 117.18 0.750 0.820 115.62 1.1043 1.0032 0.9587 1.0286 126.312 355.229 26.366 100 0.8
2022/10/06 14:00 120 106 229 62 118.90 0.750 0.820 115.62 1.1043 1.0033 0.9586 1.0287 126.311 360.448 30.121 100 0.8
2022/10/06 14:15 135 105 230 59 116.59 0.750 0.820 115.62 1.1043 1.0031 0.9596 1.0291 126.480 353.917 33.808 100 0.8
2022/10/06 14:30 150 104 231 62 119.11 0.750 0.820 115.62 1.1043 1.0033 0.9600 1.0292 126.564 361.802 37.576 100 0.8
2022/10/06 14:45 165 106 230 59 116.75 0.750 0.820 115.62 1.1043 1.0032 0.9582 1.0287 126.243 353.719 41.261 100 0.8
2022/10/06 15:00 180 107 230 59 116.38 0.750 0.820 115.62 1.1043 1.0031 0.9580 1.0287 126.210 352.524 44.933 100 0.8
2022/10/06 15:00 End of test . Bypass separator .
2022/10/06 15:05 Started rig down surface lines.
2022/10/06 15:15 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
6-Oct-2022
Eastern United Petroleum Services
SEQUENCE OF EVENTS
WHP (psi(g))
FLP (psi(g))
0 0 0 0 0 0
12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45
October 06 2022 (Thursday)