Professional Documents
Culture Documents
INDEX
1.WELL TESTING DATA SUMMARY
7. SEQUENCE OF EVENTS
Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.
dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 06:15 6/10/2022 10:15 4:00 128+128 97 113 60 104 N 110 95 46000
Type SRP
ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load
06-October-2022
2022/10/06 5:45 ESWT#1 arrived on location well no - S-771,
2022/10/06 5:47 Held safety meeting prior to rig up,
2022/10/06 5:49 Checked the well Existing conditions were:- WHP-120 psi and GC- 110 psi,
2022/10/06 5:51 Started to spot the equipment and commenced rig up,
2022/10/06 6:01 Completed rig up and started to perform the pressure test,
2022/10/06 6:06 Completed the pressure test for U/S and D/S @ 750 psig (OK),
2022/10/06 6:08 Diverted the flow through the choke manifold at fixed choke size (128+128)/64" and bypass Separator,
2022/10/06 6:10 Diverted the flow through the separator,
2022/10/06 6:15 Started Flow measurements,
2022/10/06 6:30 128+128 93 112 102 81 109 92 0.945 72.00 0.000 0.912 0 15.92 16 239 6000 72.2 330.86
2022/10/06 6:45 128+128 95 118 110 85 116 94 0.945 70.00 0.000 0.912 0 17.15 17 220 6000 70.2 313.84
2022/10/06 7:00 128+128 95 123 114 87 120 98 0.945 72.00 0.000 0.912 0 18.03 18 255 6000 72.2 353.79
2022/10/06 7:15 N/A N/A 128+128 95 122 113 86 120 110 0.945 70.00 0.000 0.912 0 17.89 18 259 6000 70.2 369.20
2022/10/06 7:30 128+128 95 120 112 86 118 115 0.945 71.00 0.000 0.912 0 17.51 18 285 6000 71.2 399.73
2022/10/06 7:45 128+128 95 120 110 87 118 85 0.945 70.00 0.000 0.912 0 17.56 18 201 6000 70.2 286.95
2022/10/06 7:45 128+128 95 Lower down the orifice plate 0,250" into the gas 2" line,
2022/10/06 8:00 128+128 96 118 109 87 116 85 0.945 71.00 9.407 0.912 111 17.16 128 210 6000 71.2 294.91
2022/10/06 8:15 N/A N/A 128+128 96 116 106 88 113 82 0.945 70.00 8.422 0.912 103 16.66 120 192 6000 70.2 273.68
2022/10/06 8:30 128+128 96 113 104 88 110 89 0.945 70.00 7.872 0.912 88 16.10 105 210 6000 70.2 298.61
2022/10/06 8:45 128+128 96 111 102 88 109 86 0.945 68.00 8.386 0.912 97 15.83 113 185 6000 68.2 271.00
2022/10/06 9:00 128+128 97 110 102 88 108 88 0.945 70.00 8.532 0.912 97 15.63 113 207 6000 70.2 294.26
2022/10/06 9:15 N/A N/A 128+128 97 111 102 88 109 86 0.945 68.00 9.720 0.912 113 15.85 129 184 6000 68.2 270.25
2022/10/06 9:30 128+128 97 112 103 89 110 89 0.945 70.00 9.340 0.912 105 16.07 121 210 6000 70.2 299.13
2022/10/06 9:45 128+128 97 111 102 89 109 83 0.945 69.00 8.909 0.912 107 15.91 123 187 6000 69.2 270.53
2022/10/06 10:00 128+128 97 112 103 89 109 89 0.945 70.00 9.978 0.912 112 15.93 128 210 6000 70.2 299.19
2022/10/06 10:15 N/A N/A 128+128 97 112 103 89 110 89 0.945 68.00 8.525 0.912 95 15.96 111 192 6000 68.2 280.86
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
06-October-2022
2022/10/06 6:30 15 3.5 87 3.46 72.00 0.97 0.991 60 0.945 60 0.945 1.000 1.000 0.96 92.0 0.96 18.3
2022/10/06 6:45 30 6.7 92 3.28 70.00 0.98 0.990 60 0.945 60 0.945 1.000 1.000 0.97 93.5 1.93 18.3
2022/10/06 7:00 45 10.4 93 3.70 72.00 1.03 0.990 60 0.945 60 0.945 1.000 1.000 1.02 98.3 2.96 18.3
2022/10/06 7:15 60 14.3 93 3.86 70.00 1.16 0.990 60 0.945 60 0.945 1.000 1.000 1.15 110.0 4.10 18.3
2022/10/06 7:30 75 18.5 93 4.18 71.00 1.21 0.990 60 0.945 60 0.945 1.000 1.000 1.20 115.1 5.30 18.3
2022/10/06 7:45 90 21.5 93 3.00 70.00 0.90 0.990 60 0.945 60 0.945 1.000 1.000 0.89 85.5 6.19 18.3
2022/10/06 8:00 105 24.5 93 3.08 71.00 0.89 0.990 60 0.945 60 0.945 1.000 1.000 0.88 84.9 7.08 18.3
2022/10/06 8:15 120 27.4 94 2.86 70.00 0.86 0.991 60 0.945 60 0.945 1.000 1.000 0.85 81.6 7.93 18.3
2022/10/06 8:30 135 30.5 94 3.12 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.0 8.85 18.3
2022/10/06 8:45 150 33.4 94 2.83 68.00 0.91 0.991 60 0.945 60 0.945 1.000 1.000 0.90 86.2 9.75 18.3
2022/10/06 9:00 165 36.4 94 3.07 70.00 0.92 0.991 60 0.945 60 0.945 1.000 1.000 0.91 87.7 10.67 18.3
2022/10/06 9:15 180 39.2 95 2.82 68.00 0.90 0.991 60 0.945 60 0.945 1.000 1.000 0.90 85.9 11.56 18.3
2022/10/06 9:30 195 42.4 95 3.12 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.2 12.49 18.3
2022/10/06 9:45 210 45.2 95 2.83 69.00 0.88 0.991 60 0.945 60 0.945 1.000 1.000 0.87 83.3 13.36 18.3
2022/10/06 10:00 225 48.3 95 3.13 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.2 14.29 18.3
2022/10/06 10:15 240 51.3 95 2.93 68.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.3 15.22 18.3
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
2022/10/06 6:30 15 81 124 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9806 1.0240 13.362 0.000 0.000 46000 18.6
2022/10/06 6:45 30 85 130 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9764 1.0244 13.309 0.000 0.000 46000 18.6
2022/10/06 7:00 45 87 135 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9752 1.0250 13.301 0.000 0.000 46000 18.6
2022/10/06 7:15 60 86 134 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9755 1.0250 13.304 0.000 0.000 46000 18.6
2022/10/06 7:30 75 86 132 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9756 1.0246 13.302 0.000 0.000 46000 18.6
2022/10/06 7:45 90 87 133 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9753 1.0246 13.298 0.000 0.000 46000 18.6
2022/10/06 8:00 105 87 130 7 29.49 0.250 0.912 12.71 1.0471 1.0006 0.9749 1.0241 13.293 9.407 0.098 46000 18.6
2022/10/06 8:15 120 88 128 5 26.42 0.250 0.912 12.71 1.0471 1.0005 0.9745 1.0236 13.281 8.422 0.186 46000 18.6
2022/10/06 8:30 135 88 125 5 24.72 0.250 0.912 12.71 1.0471 1.0005 0.9744 1.0230 13.270 7.872 0.268 46000 18.6
2022/10/06 8:45 150 88 124 6 26.34 0.250 0.912 12.71 1.0471 1.0006 0.9742 1.0228 13.266 8.386 0.355 46000 18.6
2022/10/06 9:00 165 88 123 6 26.81 0.250 0.912 12.71 1.0471 1.0006 0.9740 1.0225 13.260 8.532 0.444 46000 18.6
2022/10/06 9:15 180 88 124 8 30.54 0.250 0.912 12.71 1.0471 1.0008 0.9737 1.0227 13.261 9.720 0.545 46000 18.6
2022/10/06 9:30 195 89 125 7 29.35 0.250 0.912 12.71 1.0471 1.0007 0.9735 1.0229 13.259 9.340 0.642 46000 18.6
2022/10/06 9:45 210 89 124 6 28.01 0.250 0.912 12.71 1.0471 1.0006 0.9732 1.0227 13.252 8.909 0.735 46000 18.6
2022/10/06 10:00 225 89 124 8 31.36 0.250 0.912 12.71 1.0471 1.0008 0.9735 1.0227 13.259 9.978 0.839 46000 18.6
2022/10/06 10:15 240 89 124 6 26.80 0.250 0.912 12.71 1.0471 1.0006 0.9734 1.0227 13.254 8.525 0.928 46000 18.6
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services
6-Oct-2022
Eastern United Petroleum Services
SEQUENCE OF EVENTS
GC Press (psi(g))
GOR (scf/bbl)
97 134 100 652 343 36
48 67 50 326 172 18
24 34 25 163 86 9
0 0 0 0 0 0
06:30 06:45 07:00 07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00 09:15 09:30 09:45 10:00
October 06 2022 (Thursday)