Eastern United Petroleum Services

WELL TEST REPORT


CLIENT Wafra Joint Operations (WJO)
CONTRACT JO/SA260/PO21
WELL S-771
S/C SC-18
DATE 06-Oct-2022

Eastern United Petroleum Services


Eastern United Petroleum Services

INDEX
1.WELL TESTING DATA SUMMARY

2.WELL TESTING DATA SHEET

3.OIL RATE CALCULATION SHEET

4.GAS RATE CALCULATION SHEET

5.DIFFERENTIAL PRESSURE CHARTS

6.SURFACE EQUIPMENT LAYOUT

7. SEQUENCE OF EVENTS

8. PARAMETERS CHART TRENDS

Eastern United Petroleum Services


Eastern United Petroleum Services

WELL TESTING DATA SUMMARY

Eastern United Petroleum Services


Field : WAFRA WELL TESTING UNIT
Well : S-771 Eastern United Petroleum Services
S/C : SC-18 WELL TESTING DATA SUMMARY Identification Number: EASTERN-01
Date : 6-Oct-2022 Operator name: KUMARA DON

Separator
Test Start Test End Duration Choke size WHT WHP Casing Pressure Flow Line Pressure Critical Flow Separator Pressure H2S
liquid Temp.

dd/mm/yyyy hh:mm dd/mm/yyyy hh:mm hh:mm in/64" deg F Psig Psig Psig Y/N Psig deg F PPM
06/10/2022 06:15 6/10/2022 10:15 4:00 128+128 97 113 60 104 N 110 95 46000

Type SRP

ESP Motor Frequency T Current Voltage SL SPM Motor Load Torque RPM Motor Load

psia Hz F amps V inch amps amps


N/A 5.2 35 to 45

Total GOR Specific Gravity Shrinkage CO2


Total Liquid Rate Total BS&W Gas Rate GOR1 Oil Rate Water Rate GOR2 Water Salinity
1+2 factor
Oil Gas
SG (1-Shrinkage)
bbl/d % Mscf/d SCF/bbl bbl/d bbl/d SCF/bbl SCF/bbl ppm SG @60 ºF %
(air = 1) @ 60 ºF
285.24 69.40 8.909 102.07 87.28 197.96 16.11 118.18 6,000 0.945 0.912 0.991 18.6
General comments:- S-771 has been flowing artificially by SRP through a 3"flowline with a back pressure valve.
Started flow period through fixed choke128+128/64".
The data given here are the average readings of the last 2 hrs. and 30 minutes of the flow period.
General comments
The test was witnessed by JO POD Engineer:- Mr.Sayeed AL-Dossary.
Note:-observed first one hour and 30 minutes no gas flow.
Eastern United Petroleum Services

WELL TESTING DATA SHEET

Eastern United Petroleum Services


S-771
Unit EASTERN-01
WAFRA
6/10/2022 Data Sheet
BOTTOM HOLE WELL HEAD SEPARATOR OIL OR CONDENSATE GAS GOR WATER Total liquid rate
DATE Time
Pressure Temp. Choke WHT Tg.pres. Gc.pres. Temp. Press. Rate Gravity BSW Rate Gravity GOR1 GOR2 GORT RATE Salinity WLR RATE
yyyy/mm/dd hh:mm psia degF /64" degF psig psig degF psig BOPD g/cc % MSCFD Air=1 SCF/ bbl BWPD PPM % BBLS/D

06-October-2022
2022/10/06 5:45 ESWT#1 arrived on location well no - S-771,
2022/10/06 5:47 Held safety meeting prior to rig up,
2022/10/06 5:49 Checked the well Existing conditions were:- WHP-120 psi and GC- 110 psi,
2022/10/06 5:51 Started to spot the equipment and commenced rig up,
2022/10/06 6:01 Completed rig up and started to perform the pressure test,
2022/10/06 6:06 Completed the pressure test for U/S and D/S @ 750 psig (OK),
2022/10/06 6:08 Diverted the flow through the choke manifold at fixed choke size (128+128)/64" and bypass Separator,
2022/10/06 6:10 Diverted the flow through the separator,
2022/10/06 6:15 Started Flow measurements,

2022/10/06 6:30 128+128 93 112 102 81 109 92 0.945 72.00 0.000 0.912 0 15.92 16 239 6000 72.2 330.86
2022/10/06 6:45 128+128 95 118 110 85 116 94 0.945 70.00 0.000 0.912 0 17.15 17 220 6000 70.2 313.84
2022/10/06 7:00 128+128 95 123 114 87 120 98 0.945 72.00 0.000 0.912 0 18.03 18 255 6000 72.2 353.79
2022/10/06 7:15 N/A N/A 128+128 95 122 113 86 120 110 0.945 70.00 0.000 0.912 0 17.89 18 259 6000 70.2 369.20
2022/10/06 7:30 128+128 95 120 112 86 118 115 0.945 71.00 0.000 0.912 0 17.51 18 285 6000 71.2 399.73
2022/10/06 7:45 128+128 95 120 110 87 118 85 0.945 70.00 0.000 0.912 0 17.56 18 201 6000 70.2 286.95
2022/10/06 7:45 128+128 95 Lower down the orifice plate 0,250" into the gas 2" line,
2022/10/06 8:00 128+128 96 118 109 87 116 85 0.945 71.00 9.407 0.912 111 17.16 128 210 6000 71.2 294.91
2022/10/06 8:15 N/A N/A 128+128 96 116 106 88 113 82 0.945 70.00 8.422 0.912 103 16.66 120 192 6000 70.2 273.68
2022/10/06 8:30 128+128 96 113 104 88 110 89 0.945 70.00 7.872 0.912 88 16.10 105 210 6000 70.2 298.61
2022/10/06 8:45 128+128 96 111 102 88 109 86 0.945 68.00 8.386 0.912 97 15.83 113 185 6000 68.2 271.00
2022/10/06 9:00 128+128 97 110 102 88 108 88 0.945 70.00 8.532 0.912 97 15.63 113 207 6000 70.2 294.26
2022/10/06 9:15 N/A N/A 128+128 97 111 102 88 109 86 0.945 68.00 9.720 0.912 113 15.85 129 184 6000 68.2 270.25
2022/10/06 9:30 128+128 97 112 103 89 110 89 0.945 70.00 9.340 0.912 105 16.07 121 210 6000 70.2 299.13
2022/10/06 9:45 128+128 97 111 102 89 109 83 0.945 69.00 8.909 0.912 107 15.91 123 187 6000 69.2 270.53
2022/10/06 10:00 128+128 97 112 103 89 109 89 0.945 70.00 9.978 0.912 112 15.93 128 210 6000 70.2 299.19
2022/10/06 10:15 N/A N/A 128+128 97 112 103 89 110 89 0.945 68.00 8.525 0.912 95 15.96 111 192 6000 68.2 280.86
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

OIL RATE CALCULATION SHEET

MEASUREMENT WITH METER

Vnet = Vo x OMF x ( 1 - Shr ) x K x (1 - BSW )

Vnet Corrected Oil Volume


Vo Volume of oil recorded by meter
OMF Meter factor
(Physical inaccuracy in meter when checked before the job with water)
Shrinkage Factor (1-SHR) is estimated based on KATZ Data.
K factor = 1 as KATZ table gives Shrinkage Factor already at 60 degF.

Eastern United Petroleum Services


S-771
WAFRA
06-October-2022 Oil Rate Measurement
DATE TIME METER OIL 1-Shr OIL GRAVITY Net volume Net STO Cumulative API
Time
cumul READING Temp Vs BSW V'O* Temp. Gravity Temp. Grav. 60°F OMF k of STO. Vo product. rate Production Gravity
Factor
yyyy/mm/dd hh.mm Mins bbl degF bbl % bbl degF g/cc degF g/cc bbl BOPD bbls at 60°F

06-October-2022

2022/10/06 6:30 15 3.5 87 3.46 72.00 0.97 0.991 60 0.945 60 0.945 1.000 1.000 0.96 92.0 0.96 18.3
2022/10/06 6:45 30 6.7 92 3.28 70.00 0.98 0.990 60 0.945 60 0.945 1.000 1.000 0.97 93.5 1.93 18.3
2022/10/06 7:00 45 10.4 93 3.70 72.00 1.03 0.990 60 0.945 60 0.945 1.000 1.000 1.02 98.3 2.96 18.3
2022/10/06 7:15 60 14.3 93 3.86 70.00 1.16 0.990 60 0.945 60 0.945 1.000 1.000 1.15 110.0 4.10 18.3
2022/10/06 7:30 75 18.5 93 4.18 71.00 1.21 0.990 60 0.945 60 0.945 1.000 1.000 1.20 115.1 5.30 18.3
2022/10/06 7:45 90 21.5 93 3.00 70.00 0.90 0.990 60 0.945 60 0.945 1.000 1.000 0.89 85.5 6.19 18.3
2022/10/06 8:00 105 24.5 93 3.08 71.00 0.89 0.990 60 0.945 60 0.945 1.000 1.000 0.88 84.9 7.08 18.3
2022/10/06 8:15 120 27.4 94 2.86 70.00 0.86 0.991 60 0.945 60 0.945 1.000 1.000 0.85 81.6 7.93 18.3
2022/10/06 8:30 135 30.5 94 3.12 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.0 8.85 18.3
2022/10/06 8:45 150 33.4 94 2.83 68.00 0.91 0.991 60 0.945 60 0.945 1.000 1.000 0.90 86.2 9.75 18.3
2022/10/06 9:00 165 36.4 94 3.07 70.00 0.92 0.991 60 0.945 60 0.945 1.000 1.000 0.91 87.7 10.67 18.3
2022/10/06 9:15 180 39.2 95 2.82 68.00 0.90 0.991 60 0.945 60 0.945 1.000 1.000 0.90 85.9 11.56 18.3
2022/10/06 9:30 195 42.4 95 3.12 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.2 12.49 18.3
2022/10/06 9:45 210 45.2 95 2.83 69.00 0.88 0.991 60 0.945 60 0.945 1.000 1.000 0.87 83.3 13.36 18.3
2022/10/06 10:00 225 48.3 95 3.13 70.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.2 14.29 18.3
2022/10/06 10:15 240 51.3 95 2.93 68.00 0.94 0.991 60 0.945 60 0.945 1.000 1.000 0.93 89.3 15.22 18.3
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

GAS RATE CALCULATION SHEET

GAS RATE MEASURED BY DANIEL ORIFICE PLATE METER


Reference is made to the rules and coefficients given in AGA gas measurement comittee report No 3
for orifice metering.
Q = C x SQRT( hw x Pf)
Q : Production rate at reference conditions.
C : Orifice flow coefficient.
hw : Differential pressure in inches of water.
Pf : Flowing pressure in psia.
C = Fu x Fb x Fg x Y x Ftf x Fpv
Fu : Unit conversion factor in desired reference conditions.
Fb : Basic orifice factor ( Q in Cu.ft / hour ).
Fg : Specific gravity factor.
Y : Expension factor
Ftf : Flowing temperature factor.
Fpv : Supercompressibility factor ( estimated ). Table of Fu factor
Reference conditions
Remarks: Units 60 deg.F 0 degC 15 degC 15 deg.C
Fm : Manometer factor is equal one since only bellows type meters are used. 14.73 psia 760 mmHg 760 mmHg 750 mmHg
Fr : Reynolds factor is considered to be one. Cu.ft / hour 1 0.9483 1.0004 1.0137
Fpv : All coefficients are taken from AGA NX 19 manual for natural gas Cu.ft / day 24 22.76 24.009 24.329
More accurate values could only be determined by laboratory measurement.
m3 / hour 0.02832 0.2685 0.02833 0.0287
m3 / day 0.6796 0.6445 0.6799 0.6889

Eastern United Petroleum Services


S-771

06-October-2022 WAFRA Gas Rate Measurement


Flowing SQR Orifice GAS Gas Production Cumul
DATE Time Cumul Pf Hw H2S CO2
Temp.
Hw * Pf Diameter Gravity Fb Fg Y Ftf Fpv C Rate Production
yyyy/mm/dd hh:mm Minutes degF psia " H2O Inches (air=1) MSCF/Day MSCF PPM %

06-October-2022 Gas Rate Measurement

2022/10/06 6:30 15 81 124 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9806 1.0240 13.362 0.000 0.000 46000 18.6
2022/10/06 6:45 30 85 130 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9764 1.0244 13.309 0.000 0.000 46000 18.6
2022/10/06 7:00 45 87 135 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9752 1.0250 13.301 0.000 0.000 46000 18.6
2022/10/06 7:15 60 86 134 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9755 1.0250 13.304 0.000 0.000 46000 18.6
2022/10/06 7:30 75 86 132 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9756 1.0246 13.302 0.000 0.000 46000 18.6
2022/10/06 7:45 90 87 133 0 0.00 0.250 0.912 12.71 1.0471 1.0000 0.9753 1.0246 13.298 0.000 0.000 46000 18.6
2022/10/06 8:00 105 87 130 7 29.49 0.250 0.912 12.71 1.0471 1.0006 0.9749 1.0241 13.293 9.407 0.098 46000 18.6
2022/10/06 8:15 120 88 128 5 26.42 0.250 0.912 12.71 1.0471 1.0005 0.9745 1.0236 13.281 8.422 0.186 46000 18.6
2022/10/06 8:30 135 88 125 5 24.72 0.250 0.912 12.71 1.0471 1.0005 0.9744 1.0230 13.270 7.872 0.268 46000 18.6
2022/10/06 8:45 150 88 124 6 26.34 0.250 0.912 12.71 1.0471 1.0006 0.9742 1.0228 13.266 8.386 0.355 46000 18.6
2022/10/06 9:00 165 88 123 6 26.81 0.250 0.912 12.71 1.0471 1.0006 0.9740 1.0225 13.260 8.532 0.444 46000 18.6
2022/10/06 9:15 180 88 124 8 30.54 0.250 0.912 12.71 1.0471 1.0008 0.9737 1.0227 13.261 9.720 0.545 46000 18.6
2022/10/06 9:30 195 89 125 7 29.35 0.250 0.912 12.71 1.0471 1.0007 0.9735 1.0229 13.259 9.340 0.642 46000 18.6
2022/10/06 9:45 210 89 124 6 28.01 0.250 0.912 12.71 1.0471 1.0006 0.9732 1.0227 13.252 8.909 0.735 46000 18.6
2022/10/06 10:00 225 89 124 8 31.36 0.250 0.912 12.71 1.0471 1.0008 0.9735 1.0227 13.259 9.978 0.839 46000 18.6
2022/10/06 10:15 240 89 124 6 26.80 0.250 0.912 12.71 1.0471 1.0006 0.9734 1.0227 13.254 8.525 0.928 46000 18.6
2022/10/06 10:15 End of test . Bypass separator .
2022/10/06 10:20 Started rig down surface lines.
2022/10/06 10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

DIFFERENTIAL PRESSURE CHARTS

Eastern United Petroleum Services


Eastern United Petroleum Services

SURFACE EQUIPMENT LAYOUT

Eastern United Petroleum Services


S-771
WAFRA

6-Oct-2022
Eastern United Petroleum Services

SEQUENCE OF EVENTS

Eastern United Petroleum Services


S-771
06-October-2022
WAFRA
Time
hh:mm
SEQUENCE OF EVENTS
06-October-2022
5:45 ESWT#1 arrived on location well no - S-771,
5:47 Held safety meeting prior to rig up,
5:49 Checked the well Existing conditions were:- WHP-120 psi and GC- 110 psi,
5:51 Started to spot the equipment and commenced rig up,
6:01 Completed rig up and started to perform the pressure test,
6:06 Completed the pressure test for U/S and D/S @ 750 psig (OK),
6:08 Diverted the flow through the choke manifold at fixed choke size (128+128)/64" and bypass Separator,
6:10 Diverted the flow through the separator,
6:15 Started Flow measurements,
7:45 Lower down the orifice plate 0,250" into the gas 2" line,
10:15 End of test . Bypass separator .
10:20 Started rig down surface lines.
10:30 Completed rig down, unit and crew left location.
Eastern United Petroleum Services

PARAMETERS CHART TRENDS

Eastern United Petroleum Services


EUPS UNIT 1 PRESSURE AND RATE CHART
WAFRA
193 269 200 1303 687 72
well no. - S-771 CHOKE 128+128 Legend
Wellhead Pressure
169 235 175 Static Press 1141 601 63
GC Press
Gas Rate (av erage)
GOR
145 202 150 Total Liquid Rate 978 515 54

Gas Rate (average) (Mscfd)


Wellhead Pressure (psi(g))

Total Liquid Rate (bbl/d)


121 168 125 815 429 45
Static Press (psi(g))

GC Press (psi(g))

GOR (scf/bbl)
97 134 100 652 343 36

73 101 75 489 258 27

48 67 50 326 172 18

24 34 25 163 86 9

0 0 0 0 0 0
06:30 06:45 07:00 07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00 09:15 09:30 09:45 10:00
October 06 2022 (Thursday)