You are on page 1of 2

Which stage enables a Business Object to pause and wait for an application element?

wait
What is the purpose of Action Stage?
It�s used to call a Business Object page from a Processes.
The reset button in Process Studio must always be pressed
befr re-running a Process
Which stage is available in Object Studio but not in process studio.
action
Which stage is used in Blue Prism Object Studio, to launch an application
navigate
Which stage in Process Studio, can be used to store multiple pieces of data in
Columns and Rows
colection
In a process which data item can be used to store the values from Rows and Columns
fetched from .xls file?
collection
What is not correct about Object Studio
1 default page
We can step through a diagram one stage at a time. Which of the following is used
to traverse pages more quickly.
step over and out
What are all the spy modes in Blue Prism
Win 32, HTML Mode, Accessibility Mode, Region Mode
Reusable logic shall be in which layer?
object
The Stage which can be used to throw can exception in Blue Prism Process is,
Exception Stage
To exit from the Spy mode, in Application Modeller the keyboard shortcut is,
CTRL + Right Click
Which Business Object is used to interact with Work Queue?
Work Queue � Internal
In a single application, we can spy via more than one spying mode
True
Identify the two stages that are permanent and cannot be deleted in process
definition
Start stage and End Stage
The objects created in Object Studio can be made available in Control Room?
False
Select the incorrect statement
Blocks can overlap as well as nested.
When we create process in Process Studio then a page can have,
Multiple End Points but only one Starting Point
While debugging, Developer added a Breakpoint at Stage 1 in Process. Before
deployment in Production, developer forgot to remove the breakpoint. In Production
Environment the control will break at Stage 1?
False
Which stage is used in Blue Prism Object Studio, to launch an application
Navigate
Which of the following statements is correct?
Blue Prism can be configured to handle an exception and continue processing.
Which of the following statements regarding the �preserve the type and the detail
of the exception is correct�?
The current exception is released when the �Preserve�. box is ticked�
Code Stage in Blue Prism, does not allow to write code in which programming
language?
java
What is correct about work Queues in Blue Prism?
All of the options
Can we set up queue, to enable multiple attempts on an item
True
Can we have Resume Stage in Process without Recover Stage?
False
Application Modelling can be done in which Module of Blue Prism?
Object Studio

wrong
1.What is the purpose of the �Throttle� global Data Item?
Both the options
2. Which of the following statements is true when employing multiple object in
object layer
Reduces the number of developers who can work concurrently
3. Which statement is incorrect about Exception Handling in Blue Prism?
A resume stage neutralizes the exception but does not fix the problem

You might also like