You are on page 1of 4

Keysight i3070 Series 5i Inline In-Circuit Test System

Test Development

Notes on Test Development

Specifying the Target System 2


Using Dual Board Staging 3

This guide describes test development features specific to the i3070 Series 5i
inline systems.
Specifying the Target System
The i3070 test development processes and tools are introduced in Overview of Test
Development Process.
Follow the same processes when developing tests for the i3070 Series 5i inline
systems, but you must specify the target system using the IN-LINE keyword during
Fixture Configuration:
Fixture Type: IN-LINE
Fixture Size: BANK2

2 i3070 Series 5i Test Development


Using Dual Board Staging
Dual Board Staging is an optional feature1 on i3070 Series 5i inline systems that
allows for the testing of two single boards simultaneously, using the Throughput
Multiplier feature.

Loading and testing of boards


If this feature is available on your system, there will be two sets of board stoppers
(instead of one) to help position the two boards correctly for barcode scanning and
testing. At Zone 1, both boards must be successfully scanned before they are
moved to Zone 2 for testing. If barcode scanning fails for one or both boards, both
boards are moved straight through to the downstream machine without testing.

Figure 1 Board positions for scanning and testing


Zone 1 Zone 2

minimum 50 mm

additional stoppers

1. Installed in the factory; cannot be retrofitted on-site.

i3070 Series 5i Test Development 3


Fixturing/Test Development
Note the following during fixturing/test development when the Dual Board Staging
feature is used.

Board specifications
Minimum board size is 50 mm (L) x 60 m (W)
Maximum board size is 150 mm (L) x 350 m (W)
During fixturing/test development, ensure that the distance between the two
boards is at least 50 mm (approximately 19685 tenth mils) to avoid overlapping and
interference between the boards.

Testmain file for Dual Board Staging


The testmain_inline_panel_DBS file provided for dual board staging includes
control commands for the second board.
In the $AgilentICT_ROOT/standard) folder, rename testmain_inline_panel_DBS
to testmain_inline_panel so that the appropriate commands will be included in
the testplan for dual board staging.
Alternatively, you can manually edit the testplan to include the Passed/Failed
control commands for the second board.

Enable Dual Board testing


Enable dual board testing from the touch panel.
1 In Maintenance mode, select Setting.
2 Tap Next until the Setting 4 page is displayed, and enable Dual Board Testing.

4 i3070 Series 5i Test Development

You might also like