Bill of Materials and Estimates I. Concrete and Masonry – 398,502.50 40 kgs Portland Cement Washed sand 5” chb 4” chb 8 mm bars 9 mm bars 12 mm bars GA #16 tie wire 3/4 crushed gravel II. Carpentry – 38,775.00 1/4” x 1/4” thk ordinary plywood 1/4” x 1/4” marine plywood 1” x 2” x 1 1/2″ x 12 coco lumber 2” x 2” x 12” lumber 2” x3” x 12” lumber Assorted nails III. Steel Trusses – 45,485.00 L bar 3/16×1 1/2x 1 ½” C-Purlins 2x3x1.20 C-Purlins 2x6x1.0 1/8 x 1 ½ Flat Bar Welding Rod Metal Primer Paint Thinner Paint Brush Hacksaw Blade IV. Roofing Materials – 61,772.50 Longspan sheet roofing Ridge roll Tekscrew Type-S Sealant Silicon Sealant Touch-up paint Blindrivets Color Gutter 24” V. Doors – 20,792.00 Main panel door Panel door .80 x 2.10 3 1/2×3 1/2 hinges PVC Flush door Door knobs VI. Windows – 45,300.00 1.40 x 1.20 aluminum sliding window 0.50 x 0.60 aluminum sliding window VII. Plumbing Rough-in – 15,340.00 Water closets Stainless Kitchen Sink 4” x 4” Floor Strainer 12 mm water faucet Water line PVC assorted fixtures VIII. Tile Works – 57,345.00 8” x 10” ceramic wall tiles 8” x 8” ceramic floor tiles 40×40 Ceramic Floor Tile Tile Grouth Portland Cement IX. Electrical Works – 16,720.00 3” dia. Porcelain receptacle 60 watts energy savers Single switch Two gang Three gang 2” x 4” utility box 4” x 4” junction box Panel box Electrical Wires Safety switch Moldflex PVC Pipe X. Painting Works – 53,750.00 Latex flat Gloss latex flat wall Enamel Flat wall enamel Metal Primer Acri-color Conc. Neutralizer Paint thinner Sandpaper Q.D.E. XI. Embankment/Earthfill – 45,000.00 TOTAL – 798,782.00 Summary A. Material Cost – Php 798,782.00 B. Labor Cost – Php 399,391.00 Total Probable Project Cost – Php 1,198,173.00