11.1.1.10.1
PROCUREMENT AND SPEND ANALYTICS
VERSION 1.0
October 2015
Disclaimer
This document is provided for information purposes only, and the contents hereof are subject to change without
notice. This document is not warranted to be error-free, nor is it subject to any other warranties or conditions,
whether expressed orally or implied in law, including implied warranties and conditions of merchantability or
fitness for a particular purpose.
We specifically disclaim any liability with respect to this document, and no contractual obligations are formed
either directly or indirectly by this document. This document may not be reproduced or transmitted in any form or
by any means, electronic or mechanical, for any purpose, without our prior written permission.
1.8.10 This is the value of all the items that were received early (as per the
Fact - Purchase Cycle stipulated date on the PO). Received Early Value gives an idea about how
Lines.Received Early much in dollar value effect of the supplier's performance having on the
Amount manufacturer.
1.8.11 This metric is the percentage of received early (before the due date specified
on the PO) amount, of the total received amount. PO received early rate gives
Fact - Purchase Cycle an idea about the supplier's performance in terms of delivering goods on
Lines.Received Early % time.
1.8.12 The quantity of the product on the purchase order line item that has been
received (in purchase order UOM) after the date stipulated on the PO.
Fact - Purchase Cycle Received late quantity, when compared to ordered quantity, gives an idea
Lines.Received Late about the supplier's compliance in terms of delivering goods earlier and can
Quantity be used to analyze excess inventory.
1.8.13 Fact - Purchase Cycle This is the value of all the items that were received late (as per the stipulated
Lines.Received Late date on the PO). Received late Value gives an idea about how much in dollar
Amount value effect of the supplier's performance having on the manufacturer.
1.8.14 This metric is the percentage of received late (beyond the due date specified
on the PO) amount, of the total received amount. PO received late rate gives
Fact - Purchase Cycle an idea about the supplier's performance in terms of delivering goods on
Lines.Received Late % time.
1.8.15 Fact - Purchase Cycle
Lines.Rejected Quantity Rejected Quantity
1.8.16 Fact - Purchase Cycle
Lines.Rejected Amount Rejected Amount
1.8.17 Fact - Purchase Cycle
Lines.Rejected % Rejected %
1.8.18 Fact - Purchase Cycle
Lines.Accepted Quantity Accepted Quantity
1.8.19 Fact - Purchase Cycle
Lines.Accepted Amount Accepted Amount
1.8.20 Fact - Purchase Cycle
Lines.Accepted % Accepted %
1.8.21 Fact - Purchase Cycle
Lines.Overall Accepted
% Overall Accepted %
1.8.22 Fact - Purchase Cycle
Lines.Overall Rejected % Overall Rejected %
1.8.23 This metric is the percentage of items that were received late (beyond the
Fact - Purchase Cycle due date specified on the PO), of the total number of items ordered. PO
Lines.Overall Received received late rate gives an idea about the supplier's performance in terms of
Late % delivering goods on time.
1.9.1 Fact - Purchase This metric calculates the average unit purchase price of item ordered, by
Orders.Avg Purchase dividing Total Approved PO amount by Total Approved PO Quantity. It should be
Unit Price view with Item or commodity. This metric is not applicable to service or amount
based purchases, as unit price is not applicable to those orders.
1.9.2 Fact - Purchase The total approved quantity of purchase orders or releases to buy from suppliers.
Metric Reference Guide 1-20
Procurement and Spend Analytics
Orders.Approved PO If the order has partial or full cancellation, this quantity does NOT include the
Quantity cancelled Quantity.
1.9.3 Fact - Purchase The total approved amount of purchase orders or releases to buy from suppliers
Orders.Approved PO (in Warehouse Currency). If the order has partial or full cancellation, this quantity
Amount does NOT include the cancelled Amount.
1.9.50 Fact - PurchaseNon- % Others Non-negotiated Purchases Amount to Total Approved Purchase
Orders.Others Amount.
Agreement Purchase
Rate
1.9.51 Fact - Purchase Potential savings that would have been realized if a blanket purchase agreement
Orders.Best Price had been used instead of a standard purchase order. Best Price is the lowest
Leakage Impact price on any blanket purchase agreement that includes the item being purchased
and that was effect
1.9.52 Fact - Purchase The number of distinct approved purchase orders that has a reference to
Orders.# of agreement. And the purchase order is approved.
Agreement Purchases
1.9.53 Fact - Purchase The number of distinct approved purchase orders that has not leverage
Orders.# of Non- negotiated pricing.
Agreement Purchases
1.9.54 Fact - Purchase The number of distinct approved purchase orders that could have used
Orders.# of negotiated pricing in the form of blanket agreement.
Agreement Leakages
1.9.55 Fact - Purchase The number of distinct approved purchase orders that the purchase order is not
Orders.# of Others 'Agreement Purchases' or there is no existing matching blanket purchase
Non-Agreement agreement for it to use.
Purchases
1.9.56 Fact - Purchase The purchase order amount for the purchase order that has leverage negotiated
Orders.Negotiated pricing of some sort. And the purchase order is approved.
Purchase Amount
1.9.57 Fact - Purchase The purchase order amount for the purchase order that has not leverage
Orders.Non- negotiated pricing of some sort. And the purchase order is approved.
Negotiated Purchase
Amount
1.9.58 Fact - Purchase % of Non-negotiated Purchase Amount to Approved PO Amount
Orders.Non-
Negotiated Purchase
Rate
1.9.59 Fact - Purchase New Schedules
Orders.New
Schedules
1.9.60 Fact - Purchase Open Schedules
Orders.Open
Schedules
1.9.61 Fact - Purchase Purchase Order Schedules Closed
Orders.Purchase
Order Schedules
Closed
1.13.16 Fact - Purchase Amount of unprocessed requisition lines that are not yet on a purchase
Requisitions.Unprocessed order or release and that do not contain an Oracle Sourcing document or
Amount Pending Buyers RFQ reference. If the requisition were to gain an Oracle Sourcing document
Workbench or RFQ reference, then it would move to the Pending Sourcing phase.
1.13.17 Fact - Purchase Amount of unprocessed requisition lines that contain a reference to a
Requisitions.Unprocessed document in Oracle Sourcing or to a request for quotation (RFQ) in Oracle
Amount Pending Purchasing, but are not yet on a purchase order or release. After the
Sourcing requisition line with the Oracle Sourcing document or RFQ reference is
placed on a purchase order or release, it moves to the Pending Buyer
Submission for the Approval phase.
1.13.18 Fact - Purchase Amount of unprocessed requisition lines that were placed on a purchase
Requisitions.Unprocessed order or release that is not yet submitted for approval.
Amount Pending Buyer
Submission for Approval
1.13.19 Fact - Purchase Amount of unprocessed requisition lines that were placed on a purchase
Requisitions.Unprocessed order or release that was submitted for approval but is not yet approved.
Amount Pending PO
Approval
1.13.20 Fact - Purchase Number of unprocessed requisition lines for which the requester selected
Requisitions.Unprocessed the Urgent option in Oracle iProcurement or Oracle Purchasing.
Requisition Lines - Urgent
1.13.21 Fact - Purchase Number of unprocessed requisition lines for which the current date (the last
Requisitions.Unprocessed ETL Date) is past the Promised Date or Need-By Date on the purchase order
Requisition Lines Past or release shipment, or past the Need-By Date on the requisition line,
Expected Date whichever is available.
1.13.22 Fact - Purchase Number of Days Pending is the sum of the number of days between the last
Requisitions.Unprocessed approval date of the unprocessed requisition line and the current date (that
Average Age Days is, Last ETL Date). This number is then divided by the number of unprocessed
requisition lines.
1.13.23 Fact - Purchase Approved Requisition Lines
Requisitions.Approved
Requisition Lines
1.13.24 Fact - Purchase Number of approved requisition lines that are not canceled, returned, or
Requisitions.Processed rejected, and that are on an approved purchase order or release
Requisition Lines
1.13.25 Fact - Purchase Amount of approved requisition lines that are not canceled, returned, or
Requisitions.Processed rejected, and that are on an approved purchase order or release
Amount
1.13.26 Fact - Purchase Number of processed requisition lines for which the processed date is past
Requisitions.Processed the Promised Date or Need-By Date on the purchase order shipment or past
Requisition Lines Past the Need-By Date on the requisition line, whichever is available.
Expected Date
1.13.38 Fact - Purchase Of the Unfulfilled Lines Total, this is the number of requisition lines that are
Requisitions.Unfulfilled on an approved purchase order or release but are not fulfilled.
Lines Processed Pending
Fulfillment
1.13.39 Fact - Purchase This is the amount of requisition lines that are on an approved purchase
Requisitions.Unfulfilled order or release but are not fulfilled.
Amount Processed
Pending Fulfillment
1.13.40 Fact - Purchase Number of approved requisition lines that are not canceled, returned, or
Requisitions.Fulfilled rejected, and that have a corresponding purchase order or release
Requisition Lines shipments that have been received within the receipt close tolerance
percentage (if 3-Way or 4-Way matching is used), invoiced within the invoice
close tolerance percentage (if 2-Way matching is used), or closed. The status
of a fulfilled shipment is Closed for Receiving, Closed for Invoicing, or Closed.
1.13.41 Fact - Purchase Amount of approved requisition lines that are not canceled, returned, or
Requisitions.Fulfilled rejected, and that have a corresponding purchase order or release
Requisitions Amount shipments that have been received within the receipt close tolerance
percentage (if 3-Way or 4-Way matching is used), invoiced within the invoice
close tolerance percentage (if 2-Way matching is used), or closed. The status
of a fulfilled shipment is Closed for Receiving, Closed for Invoicing, or Closed.
1.13.42 Fact - Purchase Number of Fulfilled Requisition Lines for which the fulfilled date is past the
Requisitions.Fulfilled Promised Date or Need-By Date on the purchase order shipment or past the
Requisition Lines Past Need-By Date on the requisition line, whichever is available.
Expected Date
1.13.43 Fact - Purchase Approval Cycle Time
Requisitions.Approval
Cycle Time
1.13.44 Fact - Purchase PO Creation Cycle Time
Requisitions.PO Creation
Cycle Time
1.13.45 Fact - Purchase the sum of the number of days between the last submit date of the fulfilled
Requisitions.Fulfilled requisition line and the receipt or invoice date. This sum is divided by the
Cycle Time Days number of fulfilled requisition lines.
1.13.46 Fact - Purchase Purchase Order Approval cycle time
Requisitions.Purchase
Order Approval cycle
time
1.13.47 Fact - Purchase Purchase Order Communication cycle time
Requisitions.Purchase
Order Communication
cycle time
1.14.7 Fact - Percentage of invoices that are electronically entered relative to # of total
Scorecard.Electronic invoices.
Invoice %
1.14.8 Fact - Scorecard.% of % of Number of processed requisition lines for which the processed date is
Processed Requisition past the Promised Date or Need-By Date on the purchase order shipment or
Lines Past Expected past the Need-By Date on the requisition line to total number of processed
Date requisition lines
1.14.9 Fact - Scorecard.% of % of number of unfulfilled requisition lines for which the current date (the
Unfulfilled Requisition last ETL Date) is past the Promised Date or Need-By Date on the purchase
Lines Past Expected order shipment or past the Need-By Date on the requisition line to total
Date number of unfulfilled requisition lines
1.14.10 Fact - Scorecard.% of % of number of Fulfilled Requisition Lines for which the fulfilled date is past
Fulfilled Requisition the Promised Date or Need-By Date on the purchase order shipment or past
Lines Past Expected the Need-By Date on the requisition line to total number of fulfilled
Date requisition lines
1.14.11 Fact - Scorecard.Average This metric is the total elapsed time between requisition creation and goods
Requisition to Receipt receipt. It's the sum of Average Approval Cycle Time (Req submit to approve),
Cycle Time Average Purchase Cycle Time (req approve to PO creation) and Average
Receipt Cycle Time (PO creation to Receipt) The Requisition to Receipt Cycle
Time metric is useful for determining the entire lifecycle of a requisition
through receipt of goods. Component cycle times such as Requisition
Approval, Order Submission, and Goods Receipt can also be calculated.
1.14.12 Fact - Scorecard.Average For RFQ and Auction, this metric is the averagel cycle time taken from
Negotiation Cycle Time negotiation creation time to negotiation award completed time; for RFI, this
metric is the average cycle time taken from RFI creation time to RFI close
time.
1.14.13 Fact - Scorecard.% of % of number of receipt transactions later than the due date to the total
Late Receipts number of receipts
1.14.14 Fact - Scorecard.# of Average number of suppliers associated with purchase order transactions per
Suppliers Per Category purchase category
1.14.15 Fact - Scorecard.% of % Spend By Diversified Suppliers is % of the spending amount against
Supplier Diversity Spend suppliers who are minority owned, small business or woman owned supplier
to total spending amount
1.14.16 Fact - % Received On Time by amount
Scorecard.Received On
Time %
1.14.17 Fact - Scorecard.Overall This metric is the over all value accross all dimension. It's the %Accepted by
Accepted % amount
1.14.18 Fact - Ratio of total number of returned purchase order schedule lines over total
Scorecard.Purchase number of received purchase order schedule lines
Order Schedule Line
Return Rate
1.14.19 Fact - Scorecard.% of Performance target value for % of Negotiation Realized Savings to total
Realized Savings Target amount of approved purchase order amount which has negotiation
Value associated with it.
1.14.20 Fact - Scorecard.Non- Performance target value for % Non-Agreement Purchase Amount to PO
Agreement Purchase Matched Spend.
Rate Target Value
1.14.21 Fact - Scorecard.Perfect Performance target value for % of Perfect invoices entered relative to # of
Invoices % Target Value total invoices.
1.14.22 Fact - Scorecard.Manual Performance target value of percent of processed lines that were manually
Requisition Lines Rate turned into purchase orders or releases in Oracle Purchasing.
Target Value
1.14.23 Fact - Scorecard.# of Performance target value of average number of purchase order per buyer
POs Per Buyer Target
Value
1.14.24 Fact - Scorecard.# of Performance target value for average number of Negotiation Lines that are
Negotiation Lines Awarded per purchasing category
Awarded Per Category
Target Value
1.14.25 Fact - Performance target value for percentage of invoices that are electronically
Scorecard.Electronic entered relative to # of total invoices.
Invoice % Target Value
1.14.26 Fact - Scorecard.% of Performance target value for % of number of processed requisition lines for
Processed Requisition which the processed date is past the Promised Date or Need-By Date on the
Lines Past Expected purchase order shipment or past the Need-By Date on the requisition line to
Date Target Value total number of processed requisition lines
1.14.27 Fact - Scorecard.% of Performance target value for % of number of unfulfilled requisition lines for
Unfulfilled Requisition which the processed date is past the Promised Date or Need-By Date on the
Lines Past Expected purchase order shipment or past the Need-By Date on the requisition line to
Date Target Value total number of unfulfilled requisition lines
1.14.28 Fact - Scorecard.% of Performance target value for % of number of fulfilled requisition lines for
Fulfilled Requisition which the processed date is past the Promised Date or Need-By Date on the
Lines Past Expected purchase order shipment or past the Need-By Date on the requisition line to
Date Target Value total number of fulfilled requisition lines
1.14.29 Fact - Scorecard.Average Performance target value for the average cycle time from requisition to
Requisition to Receipt receipt
Cycle Time Target Value
1.14.30 Fact - Scorecard.Average Performance target value for average cycle time of negotiations
Negotiation Cycle Time
Target Value
1.16.1 The quantity of the product on the purchase order line item that has been
received (in purchase order UOM) on the date stipulated on the PO.
Facts - Supplier Received on time quantity, when compared to ordered quantity, gives an idea
Performance.Received about the supplier's compliance in terms of delivering goods earlier and can
On Time Quantity be used to analyze excess inventory.
1.16.2 This metric is the percentage of items that were received on time (on the due
Facts - Supplier date specified on the PO), of the total number of items ordered. PO received
Performance.Received on time rate gives an idea about the supplier's performance in terms of
On Time % delivering goods on time.
1.16.3 The quantity of the product on the purchase order line item that has been
received (in purchase order UOM) before the date stipulated on the PO.
Facts - Supplier Received early quantity, when compared to ordered quantity, gives an idea
Performance.Received about the supplier's compliance in terms of delivering goods earlier and can
Early Quantity be used to analyze excess inventory.
1.16.4 This metric is the percentage of items that were received early (before the
Facts - Supplier due date specified on the PO), of the total number of items ordered. PO
Performance.Received received early rate gives an idea about the supplier's performance in terms of
Early % delivering goods on time.
1.16.5 The quantity of the product on the purchase order line item that has been
received (in purchase order UOM) after the date stipulated on the PO.
Facts - Supplier Received late quantity, when compared to ordered quantity, gives an idea
Performance.Received about the supplier's compliance in terms of delivering goods earlier and can
Late Quantity be used to analyze excess inventory.
1.16.6 This metric is the percentage of items that were received late (beyond the
Facts - Supplier due date specified on the PO), of the total number of items ordered. PO
Performance.Received received late rate gives an idea about the supplier's performance in terms of
Late % delivering goods on time.
1.16.7 Facts - Supplier
Performance.Accepted
% Accepted %
1.16.8 Facts - Supplier
Performance.Rejected % Rejected %
1.16.9 This metric provides a supplier index that is the result of several combined
statistics, such as Service Level, Quality, and Price Variance. This metric is very
Facts - Supplier useful in contract negotiations with suppliers, because it provides an
Performance.Supplier objective view of a supplier's historical service to the company. It can also be
Score used to select a certain supplier as an alternate to an existing supplier.
1.16.10 Facts - Supplier
Performance.Overall
Accepted % Overall Accepted %
1.19.105 Fact - Sourcing. Award Award Approval Cycle Time Year Ago
Approval Cycle Time Year
Ago
1.19.106 Fact – Sourcing. Award Award Approval Cycle Time Quarter Ago
Approval Cycle Time
Quarter Ago
1.19.107 Fact - Sourcing. Award Award Approval Cycle Time Month Ago
Approval Cycle Time
Month Ago