You are on page 1of 1

2 SETS (3 - 80MM2 THHN WIRE + 1 - 14MM2 TW)

SPECIFICATION LEGENDS MDP


ALL WORKS SHALL CONFORM TO ALL APPLICATIONS OF THE LATEST EDITION OF
THE PHILIPPINE ELECTRICAL CODE, RULES AND REGULATIONS OF LOCAL 40WLEDPANELLG
I HT
500AT,3P,230V
ENFORCING AUTHORITY AND THE REQUIREMENTS OF EXISTING UTILITY COMPANY. 2x18WRecessedTypeFolurescenLtampwR
/ eelfcotr 3 - 80mm²THHN Wires + 3 - 100.0mm²THHN Wires +
1 - 14mm²TW Wires 175AT 200AT 1 - 14mm²TW Wires
15WLEDRECESSEDTYPEDOWNLG
I HT
PB1
12WLEDWALLLAMP
PRIOR TO PROTECT IMPLEMENTATION, ALL PLANS AND SPECIFICATIONS SHALL BE 175AT,3P,230V
3 - 50mm²THHN Wires +
ExhaustFan 250AT SPACE, 3P
SIGNED BY DULY LICENSED PROFESSIONAL ELECTRICAL ENGINEER AND SHALL 1 20AT 20AT 2 1 - 14mm²TW Wires
PB2
BE UNDER THE DIRECT SUPERVISION OF PROFESIONAL ELECTRICAL ENGINEER , EmergencyLgi htw/Ouetlt PB1 PB1
20AT 20AT 200AT,3P,230V
REGISTERED ELECTRICAL ENGINEER . 3 4
Dupel xConvenei nceOuetltw/ground PB1 PB1 30AT 30AT
HD
SPACE, 3P SPACE, 3P 1 2
HandDryer 5 20AT 20AT 6 PB2 PB2
ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND SAMPLES FOR APPROVAL acu
PB1 PB1 3 30AT 30AT 4
GROUND BUS
ACUOuetlt PB2 PB2
SHALL BE SUBMITTED WHERE APPLICABLE. 7 20AT 20AT 8
PB1 PB1 5 30AT 30AT 6
S,Sa SINGLE POLE SWITCH
9 20AT 20AT 10 PB2 PB2
DURING PROJECT IMPLEMENTATION, THE ENGINEER, OWNER AND ARCHITECT S2,Sab DUPLEX SWITCH
(2 Single Pole Switches in one Switch Plate)
PB1 PB1 PB3
7 30AT 30AT 8
SHALL FROM TIME TO TIME TO CONDUCT COORDINATION MEETINGS. S3,Sabc TRIPLEX SWITCH 11 20AT 20AT 12 250AT,3P,230V PB2 PB2
(3 Single Pole Switches in one Switch Plate) PB1 PB1 9 30AT 30AT 10
200AT 60AT
1 2
MOUNTING HEIGHTS SHALL NOT BE LESS THAN THE FOLLOWING: CIRCUIT LINE 13 20AT 20AT 14 PB3 PB3 PB2 PB2
CIRCUIT HOMERUN
PB1 PB1 11 30AT 30AT 12
PNL GROUND BUS
1 (PNL indicates Panel Description/Number indicates circuit No.)
15 20AT 20AT 16 PB2 PB2
PANELBOARD: 1700 mm ABOVE FINISH FLOOR LEVEL PB1 PB1 30AT 30AT
PANEL BOARD 13 14
(EXCEPT MAIN DISTRIBUTION PANEL) 17 20AT 20AT 18 PB2 PB2
CIRCUIT BREAKER
SWITCHES: 1400 mm ABOVE FINISH FLOOR LEVEL PB1 PB1 15 30AT 30AT 16
PB2 PB2
CONVENIENCE OUTLETS: 40 mm ABOVE FINISH FLOOR LEVEL GROUND 19 20AT 20AT 20
PB1 PB1 17 30AT 30AT 18
OTHERS: AS INDICATED IN THE DRAWINGS 21 20AT 20AT 22 PB2 PB2
PB1 PB1 19 30AT 30AT 20
EQUIPMENT GROUND WIRE SHALL BE COLOR GREEN AND THIS COLOR SHALL NOT BE USED SIZE OF TRANSFORMER: 23 20AT 20AT 24 PB2 PB2
PB1 PB1
DEMAND FACTOR @ 80% 21 30AT 30AT 22
ELSEWHERE. USE: 25 20AT 20AT 26 PB2
GROUND BUS
PB2
PB1 PB1
3 x 75 KVA 1Ø TRANSFORMER, 27 30AT 30AT 28
13.2KV/230V, 60HZ. PB1 PB1
THE ENGINEER/CONTRACTOR SHALL SUBMIT "AS-BUILT" PLANS FOR OCCUPANCY PERMIT,
FOR OWNER RECORD, AND FOR THE UTILITY COMPANY.
29
PB1
30AT 20AT 30
PB1
ONE LINE DIAGRAM
31 20AT 20AT 32
SIZE OF GENERATOR SET:
PB1 PB1
TESTING AND COMMISSIONING SHALL BE DONE BY THE ENGINEERS, WITNESSED BY USE:
20AT space, 3P
33 34
OWNER'S REPRESENTATIVES, AND LOCAL ENFORCING AUTHORITY (& BY THE UTILITY 200KVA, 240V, 3P, PF = 80% PB1 PB1
OTHER GROUNDING CONDUCTOR AS SPECIFIED ON THE PLANS. SILENT TYPE ALL WEATHER space, 3P space, 2P
35 36
WITH BUILT - IN C.B. PB1 PB1
GROUND BUS

MINIMUM SIZE OF WIRE SHALL BE 3.5 SQ.MM., EXCEPT FOR LIGHTING SWITCHES AND

COMPANY AS REQUIRED).
PROJECT TITLE: CERTIFIED BY : PRC NO. : PREPARED BY : CHECKED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENTS : SHEET NO. :
VALIDITY : SPECIFICATION
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
REPUBLIC OF THE PHILIPPINES
REGION VI-WESTERN VISAYAS
PROVINCE OF ILOILO
REHABILITATION AND EXPANSION
OF PUNTALES FEEDER PORT
P T R NO. :

DATE ISSUED :
ONE LINE DIAGRAM
E-06
BONIFACIO DRIVE , ILOILO CITY 5000
PROJECT SP ID NP.: EVA MAE V. PARRENAS ROMEO ANDIG RAUL N. BANIAS M.D.,MPA ATTY. SUZETTE A. MAMON ARTHUR R. DEFENSOR JR.
PRDP-IB-R006-ILO-010-000-000-2019-AF
PROJECT LOCATION: BRGY. NIPA , CONCEPCION , ILOILO
PLACE ISSUED :

T I N:
M U N I C I P A L E N G I N E E R ACTING PROVINCIAL ENGINEER MUNICIPAL MAYOR , MUNICIPALITY OF CONCEPCION PROVINCIAL ADMINISTRATOR P R O V I N C I A L G O V E R N O R 47-59

You might also like