PROJECT COORDINATION
1. PART 1 - GENERAL
1.01 SECTION INCLUDES
4. Preside at meetings.
1. Owner's Representative
2. Engineer
3. Contractor
D. Minimum Agendum:
01040-1
Project coordination
b. Projected Construction Schedules
8. Use of premises:
10 Temporary utilities
11 Safety and first-aid procedures
12 Security procedures
13 Housekeeping procedures
2. Engineer
01040-2
Project coordination
3. Contractor
9. Coordination of Schedules.
2. PART 2 - PRODUCTS
(Not Used)
3. PART 3 - EXECUTION
(Not Used)
END OF SECTION
01040-3
Project coordination