3 kg
3 kg
3 kg
9 kg
3 kg
3 kg
7 kg
10 kg
7 kg
6 kg
6 kg
6 kg
3 kg
3 kg
3 kg
3 kg
3 kg
3 kg
3 kg
3 kg
ELECTRODE Handrail Boiler #6
NO Total 328 77
Date LB-52 3,2 mm Stok
1 8/24/2021
2 8/25/2021
3 8/26/2021
4 8/27/2021
5 8/28/2021
6 8/30/2021
7 8/31/2021
8 9/1/2021
9 9/2/2021
10 9/3/2021 4 300
11 9/4/2021 4
12 9/6/2021 4
13 9/7/2021 4
14 9/8/2021 6
15 9/9/2021 6
16 9/10/2021 6 85
17 9/11/2021 10
18 9/13/2021 12
19 9/14/2021 10
20 9/15/2021 4
21 9/16/2021 6
22 9/17/2021 8
23 9/18/2021 8
24 9/20/2021 10
25 9/21/2021 6
26 9/22/2021 6
27 9/23/2021 8
28 9/24/2021 8
29 9/25/2021 4
30 9/27/2021 14
31 9/28/2021 8
32 9/29/2021 10
33 9/30/2021 14
34 10/1/2021 14
35 10/2/2021 12
36 10/4/2021 10 20
37 10/5/2021 10
38 10/6/2021 20
39 10/7/2021 16
40 10/8/2021 18
41 10/9/2021 4
42 10/10/2021 14
43 10/12/2021 14
44 10/13/2021 16
ELECTRODE Handrail Boiler #6
NO Total 542.5 62.5 201
Date LB-52 3,2 mm Stok
1 8/24/2021
2 8/25/2021
3 8/26/2021
4 8/27/2021
5 8/28/2021
6 8/30/2021
7 8/31/2021
8 9/1/2021
9 9/2/2021
10 9/3/2021 7.5 500 3
11 9/4/2021 7.5 3
12 9/6/2021 7.5 3
13 9/7/2021 7.5 3
14 9/8/2021 12.5 5
15 9/9/2021 15 4 wb 5 kg
16 9/10/2021 17.5 85 5 wb 5 kg
17 9/11/2021 22.5 7 wb 5 kg
18 9/13/2021 20 8
19 9/14/2021 20 6 wb 5 kg
20 9/15/2021 7.5 3
21 9/16/2021 15 4 wb 5 kg
22 9/17/2021 12.5 5
23 9/18/2021 12.5 5
24 9/20/2021 22.5 9
25 9/21/2021 17.5 7
26 9/22/2021 17.5 7
27 9/23/2021 12.5 5
28 9/24/2021 12.5 5
29 9/25/2021 5 2
30 9/27/2021 22.5 5 tack weld 10 kg
31 9/28/2021 12.5 5
32 9/29/2021 15 6
33 9/30/2021 22.5 9
34 10/1/2021 15 6
35 10/2/2021 22.5 7 wb 5 kg
36 10/4/2021 15 20 6
37 10/5/2021 17.5 7
38 10/6/2021 25 10
39 10/7/2021 20 8
40 10/8/2021 22.5 9
41 10/9/2021 5 2
42 10/10/2021 17.5 7
43 10/12/2021 17.5 7
44 10/13/2021 20 8
35