Thandaveswara
Canal near Nekarikallu, AP, it was proposed to raise the water level in the canal by
about 2.5 m over the previous level. The canal banks were raised by about 2 m during
the summer of 1996. The canal banks were lined with 100 mm thick concrete panels.
The slope of the inner canal bank is 1:1 whereas the slope of the outer bank is 1.5 : 1
(H:V). When the water level was raised in the canal, the canal banks have exhibited
some instability and seepage through the banks and during a thunder storm, the canal
linings over some portion have slipped away from the banks. When the water level was
raised and lowered, the right bank has shown some distress. In order to minimise the
seepage, a secondary berm was constructed along the right bank at two locations. The
0.6 m
FSL
0.15 m
100 mm thick RCC 1:2:4 Lining 1.5 m
G Level Backing
BED LEVEL
100*300 Leg Beam
0.5 m
0.6 m 300*300 Model Section
0.6 m
24.995 m
Case:1 Q = 62 m3/s
109.345
Q = 62 m3/s
RL 113.7 0.969
60 cm
1.25 0.969 m
1.2 m 1.3 1.00
1
1.211.169 1.00 0.969
RL 112.5 1/1250 60 cm
2.1 m
2
75 cm
1/ 800
0.76 m 2.75 1.65 m
800 m 3
1/1500
2000 m
Case:2 Q = 27 m3/s
109.345
Q = 27 m3/s
0.562
1.00 0.562 m
1.2 m 0.75
1 1.25
1.17 1.00 0.75 0.562 m
RL112.5 1/1250
2.1 m
2
75 cm
1/800
0.4045 m 4.7
1.65 m
3
800 m
1/1500
2000 m
Water Surface Profile
106.58 105.85
2.741 m 2.34 m
Draft Tube
102.853
500
30.5 m
Water Surface Profile
600 mm φ Pipe
Flow
397 m 70 m
Slope 1: 1.5
Right Bund
Slope 1:1
By-Pass 600
900
BL Q = 54 m3/s
Flow BL + 103.84 Flow
BL + 106.58
+ 103.767 900
Power 600
House
Slope 1:1
Bund 6m wide
Section
Pit Details
106.58 600 mm 150 mm
750 mm
900 mm 600 mm
A Pit of
900*600 mm
600 150 mm
Plan View of the Pipe Line for supplying water for Irrigation