You are on page 1of 4

Atharva Ashturkar

20BME0540

Reg. No. : 20BME0540

Name : Atharva Ashturkar

Sub : Manufacturing Automation

Lab : L59 + L60

1
Atharva Ashturkar
20BME0540

1. A motor has on-off controls from three locations. It is to be turned on from


anyone location by push button. Also, motor can be turned off from anyone
of three locations. A master reset switch should be used reset motor
anytime.

Objective: To develop the PLC ladder logic diagram for given control sequences and to
simulate the program to the stated conditions using PLC software.

Components Required: PLC software (PICO Soft)

Procedure:

• Create ladder logic program using PLC software with comments.


• Simulate and run ladder logic program.
• Test ladder logic program with inputs.
• Document Ladder logic program and PLC connection diagram.

2
Atharva Ashturkar
20BME0540

2. Motor A should turn on when Push button 1 is pressed. It should go off when an
OFF button is pressed. As soon as motor A is switched off, motor B should go ON
and it should run for10 seconds and switched off.

Objective: To develop the PLC ladder logic diagram for given control sequences and
to simulate the program to the stated conditions using PLC software.

Components Required: PLC software (PICO Soft)

Procedure:
• Create ladder logic program using PLC software with comments.
• Simulate and run ladder logic program.
• Test ladder logic program with inputs.
• Document Ladder logic program and PLC connection diagram.

3
Atharva Ashturkar
20BME0540

3. Design a PLC program and prepare a I/O connection diagram for the following counter
specifications:
i)Counts the no. of times a push button is pressed.
ii)Decrement the counter value each time a second push button is pressed.
iii)Turns on a light any time the counter accumulated value is less than 8.
iv)Turns on a second light when the counter value is equal to or greater than 8.
v)Resets the counter to zero when a selector switch is closed.

Objective: To develop the PLC ladder logic diagram for given control sequences and to
simulate the program to the stated conditions using PLC software.
Components Required: PLC software (PICO Soft)
Procedure:
• Create ladder logic program using PLC software with comments.
• Simulate and run ladder logic program.
• Test ladder logic program with inputs.
• Document Ladder logic program and PLC connection diagram.

You might also like