Project:

Client: National Highways Authority of India (NHAI)


PMC:
EPC Contractor:

INSPECTION CHECK LIST FOR : PRIME COAT / TACK COAT


Report No.: Date:

Location:
Description of Layer:
Result
Sr. No. Activities / Items to be Checked
EPC Contractor PMC / Client

Record Drawing No. and check revision is current.


1
Drwg No:_____________________________________ Rev._____________

2 Is the proposed surface approved ?


3 Is the type of bituminous primer approved ?
4 Is the rate of application established ?
5 Is the weather conducive to carryout the priming ?
6 Are the nozels of the bitumen sprayer free and clean ?
7 Is the temperature of solution as required ?
8 Is the quality of priming appropriate ?
9 Is the coverage / spread as per specification ?
Comments / Remarks, if any:

Page 1 of 3
EPC Contractor's Representative

SIGNATURE

NAME
DATE
PMC's Representative