Assignment No-06

Unit No:-06 Trigonometric leveling & setting out of work (2018-19 ,Sem-VI)

Student group –I ( Roll No . 1 to 12 )

Que. Question details CO Bloom PO


No Level
Que.01 Write a short note on Correction for refraction 06 02
Que.02 Explain with the sketch axis signal correction 06 02
Que.03 Derive an equation to determine difference in elevation between two 06 03
points having great distance between them and the observed vertical
angle is an of elevation.
Que.04 Determine the difference in level between two points P and Q from 06 03
the following observation: i) Horizontal distance PQ = 5620m
ii)Reduced level of P =415.5m
iii)Height of instrument at P=1.5m
iv)Height of instrument at Q = 1.45
v) height of signal at P = 6.50m
vi) height of signal at Q =4.54m
vii)The angle of elevation from P and Q = 2020'24''
viii) The angle of elevation from Q and P = 2020'34''
Que. 05 Explain with neat sketch setting out of bridge 06 02

Student group –II (Roll No. 13 to 24)

Que. Question details CO Bloom PO


No Level
Que.01 Explain the setting out work by centre line method for load bearing 06 02
structure
Que.02 Explain the setting out work by centre line method for framed 06 02
structure
Que.03 Derive the expression for the difference of level between two point A 06 03
and B a distance D apart , with the vertical angle as the angle of
elevation from A to B . The height of the , Instrument at A and that of
the signal at B are equal
Que.04 Determine the difference in level between two points A and B from 06 03
the following observation:
i)Height of instrument at A=1.45m
ii)Height of instrument at B = 1.55
iii) height of signal at A= 4.5m
iv) height of signal at B =3.6m
v)The angle of elevation from A and B = 1054'42''
vi) The angle of elevation from B and A = 1054'30''
horizontal distance between A and B =5800m Find the difference in
level between A and B and the refraction correction. Take R sin
1''=30.88m
Que. 05 Describe in brief location survey of along bridge. 06 02
Student group –III (Roll No . 25 to 36 )

Que. Question details CO Bloom PO


No Level
Que.01 Explain the setting out work for culvert. 06 02
Que.02 Write a short note on Correction for Curvature 06 02
Que.03 Derive an equation to determine difference in elevation between two 06 03
points having great distance between them and the observed vertical
angle is an of elevation.
Que.04 The vertical angle of elevation was observed from a station P as 06 03
2032'25''. Determine its true value if the height of instrument at P is
1.2m and height of signal at other station Q is 5.2m. The two station
P and Q are 5200 m apart . Take Rsin1" =30.88m.
Que. 05 Explain the effect of curvature & refraction. 06 02

Student group –IV ( Roll No . 37to 48 )

Que. Question details CO Bloom PO


No Level
Que. Define Coefficient of refraction with formulae 06 02
01
Que. Write a short note on combined Correction 06 02
02
Que. The following observation were taken in a trigonometric levelling survey 06 03
03 angle of depression to P at Q =1025'22'' , Height of instrument at Q =
1.35 m, Height of signal at p =4.25 m , Horizontal distance between P
and Q =6945m Coeff. Of refraction =0.07 . If the R.l. of Q is 455.32 m,
calculate R.l.of P
Que. The following reciprocal observation were made from two points A &B 06 03
04 i)horizontal distance between A and B=4950m
ii)The angle of Elevation of B at A= 1005'20''
iii) The angle of Elevation of A at B= 1001'05'
iv) height of signal at A = 6.25m
v) height of signal at B=6.35m
Vi)Height of instrument at A=1.45m
Que. Explain the a neat sketch how to the alignment of tunnel is transferred 06 02
05 from surface to the underground ?

Student group –V (Roll No . 49 to 60 )

Que. Question details CO Bloom PO


No Level
Que.01 Describe in brief location survey of along bridge . 06 02
Que.02 What do you understand by setting out of work ? 06 02
Que.03 Determine the difrence in level between two points P and Q from the 06 03
following observation: i) Horizontal distance PQ = 5620m
ii)Reduced level of P =415.5m
iii)Height of instrument at P=1.5m
iv)Height of instrument at Q = 1.45
v) height of signal at P = 6.50m
vi) height of signal at Q =4.54m
vii)The angle of elevation from P and Q = 2020'24''
viii) The angle of elevation from Q and P = 2020'34''
Que.04 Explain with the sketch axis signal correction. 06 03
Que. 05 Explain the setting out work for culvert. 06 02

Student group –VI (Roll No. 60 to 68)

Que. Question details CO Bloom PO


No Level
Que.01 Explain in details setting out of tunnel site. 06 02
Que.02 Describe the survey for transferring the surface alignment through the 06 02
shaft .
Que.03 Derive an equation to determine difference in elevation between two 06 03
points having great distance between them and the observed vertical
angle is an of elevation.
Que.04 Find the difference of level of the point P and Q and the R L of P 06 03
from following data
i)horizontal distance between P and Q =7118m
ii)The angle of elevation from Q at P = 1032'12''
iii) height of signal at P = 3.87m
iv) height of signal at Q =1.27m
v) Co -efficient of refraction =0.07
R.L. of Q =417.860 m
take R sin1" =30.88
Que. 05 Describe the brief how location survey for pier of a bridge is carried 06 02
out at site.