INTRODUCTORY STATEMENT
A plant operation is a largest variety of earth moving, lifting and
agricultural machinery equipment used in construction. During
construction we have several machines to be used.
Earth moving machine include motor grader, motor roller,
backhoe loader, track shovel, bulldozer, wheel shovel and dumper
Lifting equipment’s; crane, forklift
Agricultural machinery; farm tractor.
it’s a full-time course
This Course is a certificate course, targeting the willing Kenyans
who are above 18 years old. It is short term course for duration of
three (3) months. The learner is required to report with
A national ID, coloured passport size photo and Training boots
The school will provide with Helmet, reflector and overall. Those
without driving licences MUST first enrol the driving school before
joining the plant. The school has got a training of the first Aid class
which is contacted by the officers from primatech management
company.
In plant operation we have two courses. Standard course and
premium course. Premium course is where a trainer will train for
three (3) machine for a month while premium course will train for
six (6) machines for two months. There is a subsidy for the learners
who will take the standard course.
We are satisfied by the National Transport and Safety Authority
(NTSA). By the end of the training the learner receivers a fully
endorsed licences issued by NTSA specific to the machine you have
trained. The certificate of completion will be issued to the learner.
COURSE OBJECTIVES.
By the end of the course the learner should be
able to:
LIST OF DUTIES
1.0 Plant operation
2.0 basic mechanics (Maintenances)
3.0 Safety measures
JOB ANALYSIS
DUTY TASKS
1.0 Plant operations
1.1 driving plant machine
1.2 operating the machine
1.3 checking of machine alarms
LIST OF TASKS
1.1 Driving of plant machine
1.2 machine operation
1.3 machine alarms
1.4 machine oils
1.5 Replacing parts
1.6 Machine service
1.7 Personal safety
1.8 Machine safety
TASK ANALYSIS
TOPIC: driving
Demonstrat
e the
operating
techniques
1.3 Machine Define machine
alarms alarm
Differentiate
machine alarms
1.4 Machine
oils
1.5 Replacing
parts
1.6 Machine
servicing
1.7 Personal
safety
1.8 Machine
safety
SCHEMES OF WORK
NAME: JOAN JELAGAT RUTTO LEVEL: CERTIFICATE NUMBER OF STUDENTS:20
ADM. NO:2021IT142294 DATE OF PREPARATION: 14 FEB 2021
INSTITUTION: SENSEI CLASS: JAN 2020SENSEI DATE OF REVISION:
Arm
Boom
Bucket
Arm
attachments
CODE SYSTEM
LESSON PLANS
NAME: JOAN JELAGAT RUTTO LEVEL: PART 1 NO. OF DATE:17/02/2021 TIME: 8:00AM
ADM. NO:2021IT142294 STUDENTS:20 TO 8:20 AM
PRESENTATION: Time:20mins
INTRODUCTION. 4Mins
BODY
Step 1 2Mins
Through question and answers, learners to a give definition of plant operation
The teacher confirms the correct answer
Step 2
Through question and answer, the learners to name the different kinds of machine using machine toys 3Min
The teacher gives the learners the correct answers
Step 3
Through discussion group, learners identify parts of each machine named on step 2 6Min
The teacher goes around the groups giving the correct answers
SUMMARY: 3Mins
Through question and answers the teacher goes through the man points and asks the learners what they
have learned today
Ask the learners if there is a question
The teacher asks the students to read more on what they have learn
ASSIGNMENT: 2Mins
REMARKS.
INSTRUCTIONAL SHEETS:
Operation sheet
Assignment sheet
Activity sheet
Information sheet
COURSE/ SUBJECT:
COURSE DESCRIPTION
4
KENYA TECHNICAL TRAINERS COLLEGE
INSTRUCTOR TRAINING DEPARTMENT
PACKAGE ASSESSMENT SHEET
COVER PAGE 2
TABLE OF CONTENTS 2
INTRODUCTORY 5
STATEMENT
5
COURSE OBJECTIVES
LIST OF DUTIES 2
JOB ANALYSIS 10
LIST OF TASKS 2
TASK ANALYSIS 20
COURSE OUTLINE 10
SCHEME OF WORK 20
CODE SYSTEM 2
LESSON PLANS 8
INSTRUCTIONAL 10
SHEETS
2
WORKMANSHIP
TOTAL 100%
DATE MARKED
......................................................................................................
................................
NAME OF
MARKER ................................................................................................
................................
SIGNATURE ............................................................................................
................................................
COMMENT ............................................................................................
...................................................
...............................................................................................................
..................................................