Professional Documents
Culture Documents
Approped ME OUTFET
Checked
Approped
PERALATAN
Checked ME C8 OF
Approped
KODE JML STN MAT E R IAL KODE JML STN MAT E R IAL
p 4 bh Connector compression vb 5 bh Pole band double rack
aa 9 bh Eye nut c 4 bh Bolt machine ½”x req’d length
bo 2 bh Shacle anchor g 2 bh Cross arm steel 2000
ca 6 bh Dead end assembly primary k 12 bh Suspension isolator
cc 2 bh Dead end assembly netral n 3 bh Bolt double arming
cv 4 bh Brace steel 660 o 3 bh Bolt eye 5/8 x req’d length
ek 6 bh Locknut ae 3 bh Arrester 18 kV
1 set CT/PT Compac ch 2 bh Steel channel NP 8 x 1500
1 bh Kas type VI out door bh Steel L 70 x 70 x 7 x 1250
ss 1 bh Selector switch tegangan 6 bh Sepatu kabel 240 mm2
kwh 2 bh Kwh meter 3 ph 4 kwt 100 mtr Kabel NYAF 1 x 2,5 mm2
Terminal block 12 pool 30 mtr Kabel NYY 4 x 4 mm2
30 mtr BC 50 mm2 u/ground aj 1 bh Clamp ground rod
ai 1 bh Ground rod 8’ - 0’ 24 bh Sepatu kabel 2,5 mm2
Approped
PERALATAN
Checked ME C8 OF
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KWH METER EXIM
Approped
1 TIANG OUT FIT
Checked
Approped
PERALATAN
Checked
Approped
KWH METER EXIM 1 TIANG OUT FIT
KODE JML MAT E R IAL KODE JML MAT E R IAL
1 C.Arm Steel 3000 mm (UNSP 10) Galvanis 2 Pole Band Double Rack 8 1/2”
2 C.Arm Steel 2000 mm (UNSP 10) Galvanis 2 Besi Chanal NP 10" x 2 m
2 Brace Steel 770 mm 2 Besi Siku NP 10 x 1.5 m
4 Brace Steel 550 mm 2 Besi Siku NP 8 x 1.5 m
2 Bolt Double Arming 5/8" x 20” 6 Bolt Machine 5/8" x Req'd length
5 Pole Band Double Rack 7 1/2” 1 Monting Bracket Transformer
6 Eye Nut 5/8” 6 Pipa Galvanis 1 1/2”
6 Sacle 1 Tutup T Atap 1 1/2”
6 Strain Clamp 1 KWH Meter EXIM Out Fit Lengkap
6 Suspension ( set ) 1 SM 2-11 (Ground lengh dengan BC50m)
12 Lug Nut 5/8” 3 Arester 18 KV ( Set )
6 Washer Square 2 1/4” 3 Sepatu Kabel 70 mm AL/CU
3 Moer Baut 1 1/2" x 2 4 Sepatu Kabel 25 mm AL/CU
3 Isolator Long Shank 3 CCO 240-70 mm
1 Tie Wire 6 Jumper ( Set )
KETENTUAN TEKNIS :
- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.
- Body Kas diketanahkan.
Approped
PERALATAN
Checked
Approped
KETENTUAN TEKNIS :
- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan
pembacaan / pemeliharaan.
Approped
KWH METER KIRIM TERIMA PADA
JTM 1 PHASA
Checked
Approped
PERALATAN
Checked SME/CME - A6
Approped
KODE
ITEM MAT E R IAL SATUAN JUMLAH
Approped
PERALATAN
Checked SME/CME - A6
Approped
100 150 750 750 150 100
300
900
900
900
1200
Approped
PERALATAN
Checked SME/CME - C8
Approped
KODE JML MAT E R IAL KODE JML MAT E R IAL
KETENTUAN TEKNIS :
- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan
pembacaan / pemeliharaan dan bodi/badan kas diketanahkan/digrounding.
Approped
PERALATAN
Checked SME/CME - C8
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KWH METER KIRIM TERIMA PADA
JTM 3 PHASA
Checked
Approped
PERALATAN
Checked SME/CME - C8A
Approped
KODE JML MAT E R IAL KODE JML MAT E R IAL
KETENTUAN TEKNIS :
- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan
pembacaan / pemeliharaan dan bodi/badan kas diketanahkan/digrounding.
Approped
PERALATAN
Checked SME/CME - C8A
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KWH METER EXIM 1 TIANG
Approped
DENGAN ARESTER DAN FCO
Checked
Approped
PERALATAN
Checked
SME / CME
Approped
S / C8
KWH METER EXIM 1 TIANG DENGAN ARESTER DAN FCO
KODE JML MAT E R IAL KODE JML MAT E R IAL
ai 1 SM 2-11 16 Bolt Machine 1/2" x 6”
i 12 Bolt Carriage 3/8" x 4 1/2” 6 Shackle Anchor
k 6 Insulator Suspension 10" Set 3 Cut Out Lengk
s 2 Spool Insulator Ansi 5-4 ao 3 Arester
Bolt Clevis 15 Sepatu Kabel 70 mm
6 Socket Thimble Eye Nut 3 CCO 240-70
g 2 C. Arm Steel 2000 mm (UNSP 10) Galvanis 6 CCO 240-240
g 6 C. Arm Steel 3000 mm (UNSP 10) Galvanis 2 Loop Deade End Clamp
cv 12 Brace Steel 770 mm 6 Jumper As req ( set )
cv 4 Brace Steel 550 mm 1 Kas type V OD
11 Bolt Double Arming 5/8" x 20” 1 Gas Pyre 1 1/2" x 6 m
vb 2 Pole Band Double Rack 7 1/2” 1 D In Voering 1 1/2”
6 Pole Band Double Rack 8 1/2” x 2 Besi Siku 6 x 60 x 60
2 Pole Band Double Rack 10 1/2” 3 CT OD 40015
22 Locknuts 5/8” 3 PT 20000 IV3, 100 IV3 V
a 44 Washer Square 2 1/4” vb 2 Pole Band Drac 9 1/2”
6 Strain Clamp 240 mm 1 KWH Meter EXIM Lengkap ( set )
Armor Tape
KETENTUAN TEKNIS :
- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.
- Body Kas diketanahkan.
Approped
PERALATAN
Checked
SME / CME
Approped
S / C8
KWH METER EXIM DENGAN FCO DAN ARESTER
Approped
PERALATAN
Checked SME / CME C8
Approped
KWH METER EXIM DENGAN FCO DAN ARESTER
KODE JML MAT E R IAL KODE JML MAT E R IAL
ai 1 SM 2-11 16 Bolt Machine 1/2" x 6”
i 12 Bolt Carriage 3/8" x 4 1/2” 6 Shackle Anchor
k 6 Insulator Suspension 10" Set 3 Cut Out Lengk
s 2 Spool Insulator Ansi 5-4 ao 3 Arester
Bolt Clevis 15 Sepatu Kabel 70 mm
6 Socket Thimble Eye Nut 3 CCO 240-70
g 2 C. Arm Steel 2000 mm (UNSP 10) Galvanis 6 CCO 240-240
g 6 C. Arm Steel 3000 mm (UNSP 10) Galvanis 2 Loop Deade End Clamp
cv 12 Brace Steel 770 mm 6 Jumper As req ( set )
cv 4 Brace Steel 550 mm 1 Kas type V OD
11 Bolt Double Arming 5/8" x 20” 1 Gas Pyre 1 1/2" x 6 m
vb 2 Pole Band Double Rack 7 1/2” 1 D In Voering 1 1/2”
6 Pole Band Double Rack 8 1/2” x 2 Besi Siku 6 x 60 x 60
2 Pole Band Double Rack 10 1/2” 3 CT OD 40015
22 Locknuts 5/8” 3 PT 20000 IV3, 100 IV3 V
a 44 Washer Square 2 1/4” vb 2 Pole Band Drac 9 1/2”
6 Strain Clamp 240 mm 1 KWH Meter EXIM Lengkap ( set )
Armor Tape
KETENTUAN TEKNIS :
- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.
- Body Kas diketanahkan.
Approped
PERALATAN
Checked SME / CME C8
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KAPASITOR T. M 20 KV 3 PH
DIPASANG PADA 1 TIANG
Checked
Approped
PERALATAN
Checked S83 C5 - 1
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KAPASITOR T. M 3 PH DIPASANG
PADA 1 TIANG
Checked
Approped
PERALATAN
Checked S83 C5 - 1M
Approped
KODE JML STN MAT E R IAL KODE JML STN MAT E R IAL
Approped
PERALATAN
Checked S83 C5 - 1M
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
ANGLE CONSTRUCTION GUIDE
Approped
CROSSARM TO VERTICAL CONSTRUCTION
Checked
Approped
JTM
Checked M21
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Checked
TREE M22-1
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Checked
TREE M22-2
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
TANDA PERINGATAN
Approped
( SISI 1 )
Checked
Approped
JTM
Checked
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
TANDA PERINGATAN
Approped
( SISI 2 )
Checked
Approped
JTM
Checked
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
JTM
Checked
Approped
PENJELASAN GAMBAR
Approped
Checked
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KONSTRUKSI PRIMER SKUTM
0 0
Checked
(0 - 10 ) Angle
Approped
SKUTM
Checked DB 01
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KONSTRUKSI PRIMER SKUTM
0 0
Checked
(10 - 25 ) Angle
Approped
SKUTM
Checked DB 02
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KONSTRUKSI PRIMER SKUTM
0 0
Checked
(25 - 45 ) Angle
Approped
SKUTM
Checked DB 03
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KONSTRUKSI PRIMER SKUTM
DOUBLE DEAD END
Checked
Approped
SKUTM
Checked DB 04
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
KONSTRUKSI PRIMER SKUTM
DEAD END
Checked
Approped
SKUTM
Checked DB 05
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked MATERIAL
Approped KONSTRUKSI PRIMER SKUTM
Checked DEAD END
Approped
SKUTM
Checked DB 05
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked KONSTRUKSI PRIMER SKUTM
Approped PADA RISER POLE
Checked ( TIANG AWAL )
Approped
SKUTM
Checked DB 06
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked MATERIAL KONSTRUKSI PRIMER
Approped SKUTM PADA RISER POLE
Checked ( TIANG AWAL )
Approped
SKUTM
Checked DB 06
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KONSTRUKSI PRIMER SKUTM
Approped
JOINT SKUTM DENGAN SUTM
Checked
Approped
SKUTM
Checked DB 08
Approped
Jointing
Tenssion joint
insulated
Joint sleve
4 Isolasi 20KV
Approped
SAMBUNGAN KABEL SKUTM
(KABEL JOINTING)
Checked
Approped
SKUTM
Checked DB 09
Approped
SALURAN KABEL TANAH
A. Kabel TM 20 KV
Spesifikasi Kabel :
- Three core
- Single core
- Three, Single core
Pelaksanaan :
Kabel-kabel sebaiknya ditanam pada tanah umum (Milik Negara), dibawah trotoar, berm
jalan, atau melintang jalan raya.
Kabel harus diletakkan diatas pasir urug dengan ketinggian minimum 0,10 M.
Galian :
Kedalaman galian ditentukan sbb:
- Untuk galian dibawah trotoar jalan orang adalah 1,00 M
- Untuk galian dibawah jalan kendaraaan adalah 1,20 M
Lebar galian sekurang-kurangnya harus 0,40 M, namun lebar sebenarnya harus
disesuaikan dengan banyaknya kabel yang ditanam. Contoh tabel sbb:
1 1&2 0,40
2 3 0,60
3 4 0,80
4 5 1,00
5 6 1,20
Galian harus digali tegak lurus, diupayakan agar dasar tanah permukaan rata agar tidak
merusakkan kabel dan pastikan bahwa dibawahnya tidak ada exsisting kabel, pipa gas, air
dsb. Pelaksanaan penggalian harus dikoordinasikan dengan instansi terkait.
Material Pendukung :
1.Batu pengaman
2.Pasir urug
3.Bata merah
4.Pipa PVC
5.Semen
Konstruksi :
Lihat gambar berikut :
B. Kabel Tegangan Rendah
Lingkup pekerjaan :
- Kabel Tanah Jaringan Tegangan Rendah
- Kotak hubung bagi TR
- Kabel tanah Sambungan rumah
Kotak hubung/SDP
Kotak hubung TR terbuat dari plat besi dengan ketebalan 3 mm dicat, terpasang 0,50 M
diatas permukaan tanah. Patok / penyangga kotak hubung terbuat dari pipa besi galvanize
berdiameter 2” dengan panjang 1 M, tertanam ditanah 0,50 M dan diatas tanah 0,50 M dan di
Cor. Komponen Kotak bagi terdiri dari Main Switch Breaker, Busbar/rel, HRC Fuse, lampu,
selektor switch dan diketanahkan dengan tahanan 5 ohm.
Untuk pemasangan lihat gambar :
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 1 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA01
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 2 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA02
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 3 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA03
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 4 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA04
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 5 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA05
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 6 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked AMKA06
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 6 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG JALAN RAYA
Checked STANDARD ASPAL (PD AREA YANG SEMPIT)
Approped KONSTRUKSI
Checked AMKA 06 K
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 7 KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG JALAN
Checked STANDARD RAYA ASPAL
Approped KONSTRUKSI
Checked AMKA07
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 8KABEL TANAH 20 KV
Approped TIAP 1 M MELINTANG JALAN
Checked STANDARD RAYA ASPAL
Approped KONSTRUKSI
Checked AMKA08
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KONSTRUKSI PEMASANGAN KABEL
Approped NAIK UNTUK JARAK SPAN LEBIH
Checked STANDARD BESAR DARI 50 M
Approped KONSTRUKSI
Checked AMKK01/2/1
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KONSTRUKSI PEMASANGAN KABEL
Approped NAIK UNTUK JARAK SPAN LEBIH
Checked STANDARD BESAR DARI 50 M
Approped KONSTRUKSI
Checked AMKK01/2/2
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
KONSTRUKSI PANEL DENGAN
Approped
PONDASI BETON
Checked STANDARD
Approped KONSTRUKSI
Checked PRK05
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
SAMBUNGAN RUMAH DENGAN
Approped PENEMPATAN PANEL
Checked STANDARD DI TEPI JALAN
Approped KONSTRUKSI
Checked PRK06
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
SAMBUNGAN RUMAH DENGAN
Approped PENEMPATAN PANEL MELINTASI
Checked STANDARD PARIT DI TEPI JALAN
Approped KONSTRUKSI
Checked PRK06A
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
PENEMPATAN PANEL
DI TEPI JALAN
Checked STANDARD
Approped KONSTRUKSI
Checked PRK07
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
JTR - KABEL TANAH
UNTUK KOMPLEK PERUMAHAN
Checked STANDARD
Approped KONSTRUKSI
Checked PRK11
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
Approped
PERLETAKAN 1 KABEL TANAH TR
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB01
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 2 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB02
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 3 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB03
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 4 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB04
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 5 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB05
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 6 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB06
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 7 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB07
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 8 KABEL TANAH TR
Approped
TIAP 1 M DI BAWAH BERM
Checked STANDARD
Approped KONSTRUKSI
Checked ARKB08
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 1 KABEL TANAH TR
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked ARKA01
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 2 KABEL TANAH TR
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked ARKA02
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 3 KABEL TANAH TR
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked ARKA03
Approped
DESCRIPTION PARAF DATA
PT PLN (PERSERO) DISTRIBUSI
JAWA TENGAH & D.I YOGYAKARTA
Checked
PERLETAKAN 4 KABEL TANAH TR
Approped TIAP 1 M MELINTANG
Checked STANDARD JALAN RAYA ASPAL (DIGALI)
Approped KONSTRUKSI
Checked ARKA04
Approped