SEA HORSE MIDDLE EAST MARINE SERVICE LLC.

HOT WORK PERMIT

Vessel MV MERCURY Date 07.04.2019

Type of Hotwork Welding & cutting Location Pump Room

Name of Third Party Used If Applicable: Battam TEAM

Has the Master given permission for the operation to proceed?


Was job safety analysis carried out and safety talk with all team members carried out?
Have bridge/engine room watch keeper been informed of intended work?
Have combustible solids/liquids/gases above or adjacent to work been cleared/treated/tested?
Have the appropriate authorities been informed? (If applicable) and is there authorisation from offshore platform/Port
authority been given?
Have bunkering operations ceased (if applicable)?
Is suitable fire fighting equipment readily available?
Has combustible material in adjacent spaces close to the hot work been cleared of any substances that may ignite?
Is there a fire watch keeper appointed and briefed, with suitable fire fighting equipment?
Is the correct PPE being worn by the person involved in welding/burning operation? Welding Goggles / Leather Gauntlets?
Will the operation be under regular observation?
Are there any hazardous/dangerous goods, which may be affected by the work?
Are adjacent openings, hatches intakes and vents screened/closed if applicable)?
Is there due regard for any wiring on remote side of deck or bulkheads?
Is ventilation adequate?
Is lighting adequate for the job?
Has the welding equipment been inspected before use? Hoses Gauges Valves Torch
Are flashback arrestors in place?
Manufacturers manual checked for operational and performance data?
Are all electric components of the equipment inspected and in satisfactory condition?
Is the electric intensity regulated for the welding?
Are welding rods correct for the type of welding to be carried out?
ALL ANSWERS MUST BE AFFIRMATIVE IF APPLICABLE TO THE JOB

TO BE SIGNED BY THE CHIEF ENGINEER AND THE PERSON CARRYING OUT DUTY.

Chief Engineers Name and Signature; DATE       TIME      


     

The maximum validity of this permit is 8 hours unless it is extended by Chief Engineer and permitted by the Master:

Use this column to enter any extension of the permit.

     

TEAM MEMBERS CARRYING OUT JOB SIGNATURE DATE TIME


                 
                 

SHSQ-V03-19 Rev.2 / 15.10.01


SEA HORSE MIDDLE EAST MARINE SERVICE LLC.

HOT WORK PERMIT

COMPLETION The work on this Permit has been COMPLETED / SUSPENDED and the site has been left clean and tidy.

SIGN (Responsible Officer) : …      SIGN (Chief Engineer) :       Date/Time      /     

AFTER WELDING /BURNING OPERATIONS ARE COMPLETE, THE AREA IS TO BE MONITORED FREQUENTLY FOR A
MINIMUM OF 2 HOURS AFTER THE WORK HAS STOPPED.

SHSQ-V03-19 Rev.2 / 15.10.01