PURPOSE
This document provides key information on the following:
Pressure testing of Dual Pack Off Assembly B01 H2S.
SCOPE
This contains the Working Operations of the Enviro Dual Compact Pack-Off together with the Routine Maintenance
and Pressure Testing Procedure.
SAFETY CONSIDERATIONS
The safety considerations listed below must be accurately followed at all times during execution of the task. Any
deviation from these considerations must be immediately reported to Maintenance (Wireline) Supervisor and/or
Business Unit Manager.
a) Ensure that the Risk Assessment / JSA have been completed prior to commencement of this process. Also
appropriate hazard controls are identified and communicated to all involved in the operation.
b) This system is capable of producing high fluid pressures-appropriate considerations are required
c) Only Trained and certified personnel are to perform the Pressure and Function Tests.
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
d) Ensure that only Competent and Qualified personnel are executing work instructions and is in the
immediate area around equipment.
g) Make an announcement on the PA system that Pressure Testing/Function Testing is soon to commence. Activate
‘revolving’ light to indicate “Pressure Testing” is in progress.
h) Prominently display warning signs “Pressure Test”.
i) Do not weld, file or use metal stamps on the pressure equipment — these can create cracks which could result
in structural damage/failure.
j) Do not over tighten manual/service valves (hand tight only).
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
k) Do not attach anything to this equipment unless you are sure of its pressure rating-only connect to suitable
wellhead equipment.
l) Watch for trapped pressure. Bleed off fully before breaking down unions etc.
PROCEDURE/POLICY/WORK INSTRUCTION
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
GENERAL DESCRIPTION
The NOV ASEP Elmar Enviro™ Dual "Compact" Pack-Off is designed to wipe clean moving cable under pressure.
Positioned above the tubing/casing, the Dual "Compact" Pack-Off is built around the wire before the wireline tool
is lowered into the well.
The Dual "Compact" Pack-Off works by squeezing each of the two independent rubber elements which are wrapped
around the wire. Each element seals on the cable outer armour against well pressure, as well as wiping the wire
free of fluid. The sealing element will seal on the static cable, although the ideal cable to seal on is a seasoned
cable.
The NOV ASEP Elmar Dual "Compact" Pack-Off is designed so that the rubber element in direct contact with the
wire is easily replaced.
The Dual Pack-Off is designed to be hydraulically operated and (2) x 3,000 psi hand pumps and hoses are required
for operation.
Various quick union connections can be provided for the lower connection.
OPERATING REQUIREMENTS
• Hydraulic Pressure: 300 - 500 psi (on moving wire) 5000 psi (on static wire only)
Parts:
Seal kit: L-970338K.
Wire size 5/16’’ upper bush part #; L-831170
Packing 5/16’; L-831130
Lower bush 5/16’’: L-831190
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
Check all threads, seals and sealing surfaces for damage that might impair sealing. Repair or
replace as necessary.
Lubricate through all grease nipples (if applicable).
Check the hydraulic functions, to test that the piston assembly opens and closes.
Function and pressure test to Working Pressure.
Verify that the well site test pressure does not exceed the Working Pressure rating of that of
the equipment.
Pressure test the complete rig-up.
Check that Seal Kits and line size kits are available.
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
MAJOR MAINTENANCE
All WHE shall be surveyed at regular intervals and at least once per year. An annual survey usually consists of
a visual inspection and dimensional checks for ovality of tubulars and threads. For all jobs over 5,000 psi,
the hydrostatic body test and operational test shall not be older than 3 months. A verification procedure should
also be carried out after every job where the WHE has been subjected to extraordinary conditions, such as
rough handling, bending, accidental drops, corrosive fluids, unexpected H2S or CO2 during standard service, or
replacement of major parts.
All surveys and tests must be recorded in the equipment service record.
Renewal of certification requires a detailed survey and performance verification carried out under the control
of a certification agency. The need and frequency of such certification renewal shall be determined by local
regulations, but typically every five years. All WHE pressure containing equipment should undergo a major
re- certification every five years based on the following general procedures:
Visual inspection.
Random thickness tests on risers, BOP, tool trap, ball check valve, tool catcher and general bodies
using direct measurements, ultrasonic or X- ray.
Dye penetration or MPI examination on threads or any damaged area determined at visual
inspection.
Hydrostatic body test to Test Pressure.
Function tests at Working Pressure.
Review of Quality Files.
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
The most current version of this document can be accessed on the Compliance Business Management System Software (Q-Pulse)
CONTROLLED DOCUMENT
KEY ABBREVIATIONS
N/A
RELATED DOCUMENTS
N/A
RELATED RECORDS
1) Reference Document: NOV/Elmar Dual Compact Pack off NO:DD970338-E