GP Zone-2 SWAP Project

Technical Site Survey Report

Site ID:
Site Name:
Site Type
City/town:
District:
Site Address:

Subcon Name
Surveyor:
Tel:
Survey Date:

ZTE Submitter GP Receiver GP Approver

Name: Name: Name:


Date: Date: Date:
Technical Site Survey Report
Existing Information

Qty Survey Item Existing Information Tips

Site Basic Information


1 Site ID: 0 2G/3G/4G
2 Site Name: 0
3 Longitude(E): (Decimal Degree)
4 Latitude(N): (Decimal Degree)
5 Site Type: 0 Macro(ID),Macro(OD),IBS(Small Cell),Small Cell
6 Equipment location Type: Shelter,Outdoor Pad,Brick Room
7 Site Category: GF,RT,RTP,GFRT
8 Tower property GP Bulid, GP Sharing
9 Host Operator Only mention if sharing tower
10 Tower Type: 3-legs Tower,4-legs Tower,Rooftop Pole,Guyed mast,Monopole, Rooftop pole,
11 Building Roof Height(m): Where Rooftop Pole or Rooftop Tower located
12 Tower/Pole Height(m):
Site Access Information
1 Site Access 24hrs,Office hours,Advance appointment only
2 Land Owner Issue
3 Land Owner Name and Contact Number
4 Special Access Permissions
5 Special Access area
6 Site Access Key Type
7 Special Key needed?
8 Key Collection Point
9 Key Provider
10 Crane needed only for rooftop sites
11 Width of stairs(mm) only for rooftop sites
12 Remark
Existing Grounding Information
1 Status of Existing grounding Available Earth Pit and Earthing Bar Availablity
2 If Earthing properly connected with Earth pit Yes If Earthing Bar properly connected with Earth pit
3 Grounding bar available(indoor) No *mandatory*,Yes,No
4 Grounding bar available(outdoor) No *mandatory*,Yes,No
5 Grounding bar available(Tower) No *mandatory*,Yes,No
6 Remark Ex. RRU grounded with Tower lege
Exsiting DC Information(Rectifier-1).
1 DC System Manufacturer and model *mandatory*,Power Equipment Brand and Detail Version
2 Rec. Module Qty. *mandatory*,Qty.
3 Spare Module Slots *mandatory*,Qty. of spare slots for power expansion
4 Each Module Capacity *mandatory*,Unit:W
5 Total DC Breakers *mandatory*,LLVD
6 Existing Ericsson equipment occupied breakers in rectifier *mandatory*,DCPD:2*100A,BBU:1*42A.RRU:2*25A
7 Spare DC Breakers *mandatory*,Specify the capacity of the DC breakers(LLVD)
8 DC Total Capacity *mandatory*,Rec. Model Qty.*Each Module Capacity ,Unit:W
9 Current Load on Display
10 Remarks
Exsiting DC Information(Rectifier-2 If available)
1 DC System Manufacturer and model *mandatory*,Power Equipment Brand and Detail Version
2 Rec. Module Qty. *mandatory*,Qty.
3 Spare Module Slots *mandatory*,Qty. of spare slots for power expansion
4 Each Module Capacity *mandatory*,Unit:W
5 Total DC Breakers *mandatory*,LLVD
6 Existing Ericsson equipment occupied breakers in rectifier *mandatory*,DCPD:2*100A,BBU:1*42A.RRU:2*25A
7 Spare DC Breakers *mandatory*,Specify the capacity of the DC breakers(LLVD)
8 DC Total Capacity 0 *mandatory*,Rec. Model Qty.*Each Module Capacity ,Unit:W
9 Current Loading
10 Remarks
Existing Battery Information(Rectifier-1)
1 Battery Model *mandatory*,Battery Brand
2 Battery Group Quantity(0,1,2,3) *mandatory*
3 Battery Capacity of Each Group *mandatory*
4 Battery Installation N/A,Indoor Battery Rack,Existing Rec.,Outdoor Battery Cabinet
Existing Battery Information(Rectifier-2 If Available)
1 Battery Model *mandatory*,Battery Brand
2 Battery Group Quantity(0,1,2,3) *mandatory*
3 Battery Capacity of Each Group *mandatory*
4 Battery Installation N/A,Indoor Battery Rack,Existing Rec.,Outdoor Battery Cabinet
Existing Equipments Information
1 Qty of Existing BTS Cabinet Only for GP Equipments
2 Qty of Existing Baseband Unit Only for GP Equipments
3 Qty of Existing RRU (900MHz) Only for GP Equipments
4 Qty of Existing RRU (1800MHz) Only for GP Equipments
5 Qty of Existing RRU (2100MHz) Only for GP Equipments
6 Qty of Rectifier Cabinet Only for GP Equipments
Existing Transmission Information
1 Transmission type of 2G/3G/4G BTS Ethernet cable Fiber,Ethernet cable
2 Qty of IDU
3 Transmission Type MW
Existing External Alarms Information
1 MAINS FAIL NO Yes,No
2 RECTIFIER MODULE FAIL YES Yes,No
3 BATTERY DISCONNECTED PRE ALARM YES Yes,No
4 TEMPERATURE HIGH (FROM BBU) YES Yes,No
5 DVS FAIL NO Yes,No
6 DOOR OPEN YES Yes,No(Generator not Avail But Physically Alarm cable found)
7 GENERATOR RUNNING NO Yes,No(Generator not Avail But Physically Alarm cable found)
8 DR OPEN AG NO Yes,No
9 AVIATION LIGHT FAILURE NO Yes,No
IP-Relay & SMU Lock Information
1 IP Relay Controller available Yes,No
2 IP Relay Controller Working Yes,No
3 SMU Lock Available Yes,No
4 SMU Lock Working Yes,No
Existing 2G-900Mhz Antenna System Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth°
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length(m) *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 4G-900Mhz Antenna System Information(IF Different RRU for 4G/LTE)
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 2G-1800Mhz Antenna System Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 4G-1800Mhz Antenna System Information(IF Different RRU for 4G/LTE)
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 3G-2100Mhz Antenna System Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 4G-2100Mhz Antenna System Information(IF Different RRU for 4G/LTE)
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Existing 3G-2100Mhz Split Cell Antenna System Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Model *mandatory*,The model of antenna
2 Antenna Band *mandatory*
3 Qty of Antennas *mandatory*
4 Total Qty of Antenna Ports *mandatory*
5 Qty of Antenna Used Ports *mandatory*
6 RET/RCU Available or Not *mandatory*
7 AISG cable avaliable *mandatory*
8 Height (A-GL)
9 Azimuth
10 Mechanical tilt
11 Electrical Tilt
12 TMA model
13 Diplexer used or not
14 Diplexer Type
15 Combiner Type
16 Combiner Frequency
17 Combiner Location
18 Filter Type
19 Jumper Length *mandatory*
20 Feeder type *mandatory*
21 Feeder/Fiber Length *mandatory*
22 RRU Power cable type 4mm2,6mm2,10mm2,16mm2
23 RRU Power cable Length(M)
24 RF module location
Technical Site Survey Report
Proposed Information

Proposed Item Proposed


Qty Tips
Information
Proposed SWAP Basic Information
1 Site Swap Model Macro Macro,Small Cell (IBS), Small Cell

2 Equipment Cold/Hot Swap No need to first shutdown existing wireless equipment-Cold


3 Power Cold/Hot Swap No need to first shutdown existing wireless equipment-Cold
4 Transmission Cold/Hot Swap No need to first shutdown existing wireless equipment-Cold

5 Space available for BBU & DCPD10B&LPU2 in existing Cabinet/Rack

6 Space available for New Outdoor Cabinet VC9910A

Proposed DBS
1 Proposed BBU installation solution
2 BBU Model V9200

3 Proposed DCPD10B Qty Unit:Pcs, IF RRU Qty>9 & R9224E Qty>3 then 2 DCPD10B

4 Distance from DCPD10B/ Encloser 6330 location to Rectifier(m) Unit:Meter (Whatever rack/cabinet where BBU installed)
5 BBU to DCPD10B Power Cable (m) 2m,5m,10m,20m,30m
6 25mm2 aluminium Grounding Cable length(m) Unit:Meter, BBU/DCPD10B/LPU2
7 35mm2 aluminium Grounding Cable length(m) Unit:Meter, New ODC
8 Metal Flexible Pipe
9 Remark
Proposed transimission,alarm
1 Transmission cable Type Ethernet CAT6
2 Length(m)
3 Distance from Proposed LPU2 to existing OVP
4 Distance from Proposed LPU2 to farest Sensor
5 Total Alarm Cable Length(m) LPU2 to Each sensor(eg. Door sensor to LPU2, Rectifier fault to LPU2, Mains fail to LPU2,etc)
6 Transmission/IDU/NTTN device inside Ericsson 6110
Proposed DC Power Information
1 Proposed New Rectifier Module Qty No need
2 63A Circuit Breaker available No
3 100A Circuit Breaker available No
4 Proposed New 63A DC Breaker 1 DCPD10B needs 2 63A/100A CB
5 Proposed New 100A DC Breaker 1 DCPD10B needs 2 63A/100A CB
6 Proposed New 50A/42A DC Breaker for E//6330 No DCPD10B
7 Proposed New 32A/25A DC Breaker for E//6330 No DCPD10B
Proposed New structures/components and civil work
1 New sunshad to be constructed No Yes/No
2 New outdoor concret Pad to be constructed No Yes/No
3 Qty of RRU install components(1-on-1 pole)(Set)
4 Qty of RRU install components(2-on-1 pole)(Set)
5 Qty of RRU install components(3-on-1 pole)(Set)
6 Qty of RRU install components(Wall mount)(Set)
7 Type of New RRU pole to be provided No need No need, Pole on wall,Pole on tower leg,Pole on existing Ant pole
8 Qty of New RRU pole 0
9 400mm Width Horizontal Cable Tray(outdoor)
10 400mm Width Vertical Cable Tray(outdoor)
Proposed 2G/4G-900Mhz Antenna System and RRUs Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Installation Reused Reused Reused Reused,New,N/A
2 Antenna Model
3 Antenna Band
4 Qty of Antennas
5 Qty of Antenna Ports 2,4,6
6 Height (AGL)
7 Azimuth
8 Mechanical tilt
9 Electrical Tilt
10 RRU Model
11 RRU Qty.
12 RRU Mounting location
13 RRU Jumper Length (m)(3/5/>5(Value)) Every sector
14 RRU Jumper Qty Every sector
15 RRU Jumper Type Every sector
16 Total 1/2" Feeder length 0 0 0 0 0 0
17 RRU Fiber Length Every sector
18 RRU Grounding Cable Length(m) Every sector
19 DC Power Cable Length(m) Every sector
20 DC Power Cable Type Every sector
21 ODCPD5 needed(Sets) 0 0 0 0 0 0 Every sector
22 Clamp for CPRI & RRU Power cable 0 Every sector
Proposed GL1800/UL2100 Antenna System and RRUs Information
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Installation Reused,New,N/A
2 Antenna Model 0 0 0 0 0 0 connect to 2 antenna should mark here
3 Antenna Band Tri
4 Qty of Antennas
5 Qty of Antenna Ports 2,4,6
6 Height (AGL)
7 Azimuth
8 Mechanical tilt
9 Electrical Tilt
10 RRU Model
11 RRU Qty.
12 RRU Mounting location
13 RRU Jumper Length (m)(3/5/>5(Value)) Every sector
14 RRU Jumper Qty Every sector
15 RRU Jumper Type Every sector
16 1/2" Feeder length(Jumper Length>5m) 0 0 0 0 0 0
17 RRU Fiber Length Every sector
18 RRU Grounding Cable Length(m) Every sector
19 DC Power Cable Length(m) Every sector
20 DC Power Cable Type Every sector
21 ODCPD5 needed(Sets) 0 0 0 0 0 0 Every sector
22 Clamp for CPRI & RRU Power cable 0 Every sector
23 Aisg cable length(m) Every sector
Proposed 3G-2100Mhz Antenna System and RRUs Information (Split Cell/additional Cell)
Item Sector-1 Sector-2 Sector-3 Sector-4 Sector-5 Sector-6 Tips
1 Antenna Installation Reused,New,N/A
2 Antenna Model
3 Antenna Band Tri
4 Qty of Antennas
5 Qty of Antenna Ports 2,4,6
6 Height (AGL)
7 Azimuth
8 Mechanical tilt
9 Electrical Tilt
10 RRU Model
11 RRU Qty.
12 RRU Mounting location
13 RRU Jumper Length (m)(3/5/>5(Value)) Every sector
14 RRU Jumper Qty Every sector
15 RRU Jumper Type Every sector
16 1/2" Feeder length(Jumper Length>5m) 0 0 0 0 0 0
17 RRU Fiber Length Every sector
18 RRU Grounding Cable Length(m) Every sector
19 DC Power Cable Length(m) Every sector
20 DC Power Cable Type Every sector
21 ODCPD5 needed(Sets) 0 0 0 0 0 0 Every sector
22 Clamp for CPRI & RRU Power cable 0 Every sector

23 Aisg cable length(m) Every sector