You are on page 1of 1

 

INSTRUCTIONS   BRAINSTORMING AREA   NEXT STEPS


MURAL TEMPLATE

Define the project you want to visualize


   FLOW KEY
Brainstorm stages and assign recommended
Align roles and shape codes Reduce
time of
request
Reduce
time of
request Start/End
Every process has a start and
an end point. Use this shape to
Think about which stakeholders or teams are involved
responsibilities for a
identify both moments.

Get Get
Place the stakeholders in the lanes and supplies supplies

project
faster faster This shape is used for
map the process from start to finish Action
actions or instructions, the
things that must be done.
Review the system
Group data Group data

Swimlane Diagram
by type by type
The diamond shape is
Prioritize actions and next steps commonly used for asking a
a template brought to you by your friends at MURAL Decision question or for decisions. In
this step, two arrows will
come out of it, depending on
the answer.

Use this shape when a


INTRODUCTION Delay process is delayed, and you
need to wait.

A swimlane diagram (also called a swimlane flowchart) uses the


visual metaphor of a pool to provide clarifying structure to
Project name: It is used to represent data
or information that can be
complex processes and responsibilities. It can help team
Document read.
members or different teams work together more efficiently by
visualizing everyone’s ‘swimlane’.
If you’re onboarding a new team member or experiencing
confusion on project responsibilities, using our swimlane diagram
template is a great solution. Use vertical ‘lanes’ to divide focus
Points toward the next step.
CUSTOMER
areas and shapes and connectors to show how tasks or projects INICIO
move ahead in the workflow.

No se
¿Se va a dar inicio al No planteará el
Diseño arquitectónico diseño
proyecto? 
arquitectónico

   VISUAL KEY
PEOPLE TIME DIFFICULTY
1+ 1 hour Beginner You can also make your diagrams more
Yes
engaging by using images and icons!

TOOL TIPS
Start/End
Create connections at the speed of thought:
SALES

Recolecto los
documentos Fase de Fase de
obligatorios prediseño diseño
Hold   C
C   + click

and drag to draw Action


a connector.

¿Cuento con las


Turn on  No
documentaciones para cada
connector points fase? Decision
to create new
diagrams faster.

Delay
DESIGN

Documentación Desarrollo
Cartografía y
Paso a la  preliminar del sitio y programático del
Click on the FASE DE PRE-DISEÑO el proyecto
evaluación física del Normativa vigente
proyecto y cuadro de
sitio
connector points arquitectónico áreas
to instantly add
Document
new connectors
Otros documentos
and shapes. contemplados para
Liquidación de
Estudio de redes y Verificación y análisis
honorarios
liquidación de tarifas servicios del estudio de suelos
profesionales
profesionales

Change Add your own!


connector styles.

Defino y completo los ESQUEMA BÁSICO


No ¿Completé la fase de Yes Paso a la  Planos generales de
documentos que ANTE-PROYECTO
prediseño? FASE DE DISEÑO diseño arquitectónico
hagan falta PROYECTO
DEVELOPMENT

Switch between
different shapes
and sticky notes
quickly.

Establezco los ¿Cuento con las


productos derivados  definiciones previas?

Bulk edit objects


of the same type No Establezco las
by filtering your definiciones previas
selection from
the toolbar.

Planos generales
RESOURCES destinados a la
obtención de
licencias
ACTOR

The ability to "connect the


ORGANIZE IDEAS INTO A
dots" and find relations to
STRUCTURED DIAGRAM
come up with great ideas is
Mind mapping allows you
one of Mural's main benefits.
to take your ideas and
organize them into a
structured, visual diagram.
You can easily create
connectors from the border Planos generales
Starting with your main
idea as the central point,
of an element to the next to
build neat flowcharts. To add destinados a estudio The Templates team loves
sub-themes branch out and
connect to supporting
a connector: Hold C + click
from the 1st point you want técnico feedback! We’re always
to connect (the ...
ideas - and so on. This
allows you to see a broad
looking for ways to enhance
Mural
overview of
the template experience,
Mural
and most importantly
ensure specific templates
are meeting your needs.
Click here to leave
feedback. Thank you!
Google

You might also like