F.F. CRUZ & CO., INC.

Civil & Geodetic Engineers • Constructors


800 EDSA, Quezon City
DAILY REPORT

PROJECT TITLE: ATI MANILA SOUTH HARBOUR EXPANSION PROJECT : EIB RECLAMATION DATE: Saturday, April 13, 2019
LOCATION: ATI MANILA SOUTH HARBOUR, MANILA DR. NO. DR-051

DETAILS OF WORK / ACTIVITY

START FINISH LOCATION DESCRIPTION OF WORK ISSUES/CONCERN

Laying of sand blanket at the EIB in the following designated areas:


"A20", "A17", "A13" and "A16".

8:00 AM 10:00 PM Offshore


Dredging works for Dragflow at EIB in the following designated
areas: "A20", "A17", "A13" and "A16".

Felipe 2 with M/T Aida arrive in EIB AT 9:03 PM with 1,993 cu.m
Arrived in EIB at 9:03 PM Offshore
of sand filling materials.

Prepared by: Reviewed by: Noted by:

Engr. Mark Angelo Fernandez


Engr. Victor Bartolome Engr. Raymond Fruto
Engr. Don Villanueva Engr. Joey Albert Cipriano
Field Engineer Project Engineer Project Manager

FFC-F-EIB-001 Revision: 0 Effective: 03-01-2019