Professional Documents
Culture Documents
February 6, 2019
CC : EDMUND BALANON
Site Inspector
AECOM
NOE PENDOM
Site Inspector
AECOM
SUBJECT : OFFICIAL CONTROL POINTS OF ELEVATION AND LOCATION FOR EIB RECLAMATION
Engineering Islands Basin Reclamation
ATI, Manila South Harbor
Hi Sir,
This pertains to our actual data gathered during our traverse work from TS station to ATI-1 and ATI-2 and
from MMA-3821 and MMA-3824. TS were located at Pier 13 and were used as reference point in several
project at ATI. In-line with this, we will now use ATI- and ATI-2 as our official control points for horizontal
and vertical for EIB reclamation Project. In addition to this, station TS were tied up from MMA-61 which is
located at finance road and traversed by PPA, ATI-1 and ATI-2 were tied-up from MMA-3824 and MMA-3821
both are NAMRIA stations and traversed by F.F CRUZ AND CO., INC using Global Positioning System.
Attached herewith are copy of our data gathered, location Captured in Google earth map with corresponding
pictures and NAMRIA certificates of original stations for your comments and approval.
Prepared by:
Jay-ar Rola
Geodetic Engineer, FFCCI
Noted by,
800 E. DE LOS SANTOS AVENUE, WEST KAMIAS, QUEZON CITY, PHILIPPINES 1102
TEL: +63-2-927-3324 FAX: +63-2-921-1223 E-MAIL: ffcruz@ffcruz.com.ph WEBSITE: www.ffcruz.com.ph
HIGHWAYS & BRIDGES • PORTS & HARBORS • DREDGING & RECLAMATION • EARTHWORKS & DAMS • IRRIGATION & PIPELINE WORKS
INDUSTRIAL PLANTS • SURVEYING, MAPPING, & GIS • GEOTECHNICAL INVESTIGATION