(1) SUPERVISION & MANPOWER WITH EQUIPMENT, TOOLS, STAGING MATERIALS & CONSUMABLES TO
PERFORM THE FOLLOWING WORKS ON BOARD VESSEL AT EASTERN WORKING ANCHORAGE POSITION :-
(1.1) STERN SHEAVES (PORT & STBD) HULL CHEEK AREAS POWER TOOLING, CHIPPING & DISC SANDING
DOWN (APPROX. 40M²) & APPLIED WITH RUST CONVERTER (FALCHEM/RUST-CON) FOLLOWED BY
RINSING, & THREE COATS OF PAINT (JOTAMASTIC 87 ALUMINIUM A+B X 2 COATS, & J-HARDTOP AS
WHITE A+B X 1 COAT) WITH THE MINIMUM CURING PERIOD IN BETWEEN EACH COAT; HANGING
STAGING (4ML X 3~4MW X 8MH X MULTIPLE TIER X 2 SETS) ERECTED FOR JOB ACCESS, UPON
COMPLETION OF ALL WORKS OF WHICH DISMANTLED.
Note : Deep pitted areas on the hull cheek surfaces were patched up with superior repair putty
patching up and grinding flush at curing in conjunction.
(1) LAND TRANSPORTATION & SHORE CRANE SERVICES WITH CUSTOMS D.S.A. DOCUMENTATION FOR
EQUIPMENT, STAGING MATERIALS, TOOLS, ETC. MOBILIZATION & DEMOBILIZATION VESSEL AT
ANCHORAGE THROUGH PENJURU TERMINAL BY AGENTS’ CARGO BOAT ON THE 26 JANUARY &
28 JANUARY 2023.
(2) LAND TRANSPORTATION FOR MANPOWER MOBILIZATION & DEMOBILIZATION VESSEL AT ANCHORAGE
THROUGH MARINA SOUTH PIER BY AGENTS’ FERRY BOAT AS & WHEN REQUIRED ACCORDINGLY.
________________________________________________________________________________
___________________________________ ________________________________
ACCEPTED BY (SIGNATURE & STAMP) K-MARINE ENGINEERING PTE LTD