NATIONAL TRANSMISSION & DESPATCH COMPANY LIMITED

DEPUTY MANAGER (P&I)

No. ______________/DM(P&I)/500KV/RYK Dated: /05/2019

Executive Engineer EHV-II,


S&I Division NTDC,
Rahim Yar Khan.

Subject: 01 NO. PT (Y-PHASE) INSTALLED FOR BACK UP ENERGY METERS OF


CDP POINTS INSTEAD OF 03 NO. PTs (R, Y, B PHASE) AT 500KV G/S RYK

Ref:- 1. This office Letter No. 81-84 Dated: 20-05-2019


2. This office Letter No. 236-239 Dated: 26-11-2018
3. This office Letter No. 183-186 Dated: 24-08-2018
4. This office Letter No. 112-115 Dated: 21-05-2018
5. This office Letter No. 24-27 Dated: 09-02-2018

It is submitted that at 500kV Grid Station NTDC, Rahim Yar Khan, only 01 No. PT is
installed on Yellow Phase instead of 03-No. P.Ts on each phase i.e. Red, Yellow & Blue for backup
metering of CDP points at 132kV side of each 220/132kV 250MVA auto-transformers T-5, T-6 and
132/11.5 kV 6.3MVA Power transformer T-7 . It is further added that only 01 No. P.T is installed on
Yellow Phase for each 132kV Bus Bar.

It is worth mentioning that the P.Ts play main role for accurate backup metering of
CDP points and 03 No. P.Ts for each phase i.e Red, Yellow & Blue may be installed as soon as possible
on above said transformers.

Therefore, it is requested to approach the quarter concerned to resolve the above


mentioned issue for proper and accurate backup metering of CDP points and proper monitoring of
voltage of system to avoid any unforeseen situation between MEPCO/NTDC at belated stage in the
best interest of the authority please.
Matter Most Urgent Please

DEPUTY MANAGER (P&I)


500KV GRID STATION NTDCL
RAHIM YAR KHAN
CC:
1. The Chief Engineer, Asset Management (N) Region, NTDC, Multan.
2. Superintending Engineer AM(N) 500KV Circle, NTDC, Multan.
3. Regional Manager (T.S), M&T-II MEPCO Region, Multan.

P&I Division 500-KV Grid Station NTDCL, KLP Road Near Sardargarh, Rahim Yar Khan.
Mob.# 0335-7401548