• Pre-feasibility:
– major sampling and test work programs, including mineralogical
examination of the ore and pilot plant testing to ascertain the
viability of the selected mineral processing option and likely
recoverability.
– It evaluates the various options and possible combinations of
technical and business issues.
• Feasibility study:
– drilling, assaying, mineralogical, and pilot plant test work will
continue.
– the feasibility study confirms and maximizes the value of the
preferred technical and business option identified in the
prefeasibility study stage.
@ Syafrizal, 2014 Kuliah Tamu di UMI Makassar, 8 Desember 2014 5
TAHAPAN EVALUASI (Technical Study);
JORC Code 2012
• A Scoping Study is an order of magnitude technical and economic
study of the potential viability of Mineral Resources. It includes
appropriate assessments of realistically assumed Modifying Factors
together with any other relevant operational factors that are
necessary to demonstrate at the time of reporting that progress to a
Pre-Feasibility Study can be reasonably justified.
Common Presentation
• Sebaiknya jelas, ringkas, dan logis.
Sense • Tidak hanya merupakan gambaran
sumberdaya atau cadangan, tetapi juga
Classification Estimation
of Results Parameters untuk pihak lain yang membutuhkannya.
• Tidak hanya kuantitatif, tetapi juga bersifat
kualitatif sehingga hasil akhir sebaiknya
Estimation
Methods berupa estimasi atau perkiraan, bukan
kalkulasi.
Geologist
Geologist
• Melakukan interpretasi geologi deposit
dan menyampaikan kepada semua yang
Technical terlibat dalam proses estimasi.
Team and Geostatistician
Management
Communication Geostatistician
• Menjelaskan metode perhitungan yang
akan digunakan dan meyakinkan
adanya hubungan yang relevan antara
metode tersebut dengan aspek geologi
Metallurgist
Mining dan pertambangan.
Engineer
Geologist
Mining Engineer
• Harus memahami secara keseluruhan
Technical mengenai cara mendapatkan hasil
Team and Geostatistician
Management estimasi sesuai dengan batasan yang
dapat diterima.
Communication
Metallurgist
• Lebih berperan dalam tahapan analisis
hasil pengeboran, pengambilan sampel,
Metallurgist
Mining dan penentuan kadar batas.
Engineer
Model Geologi Resources Insitu Gridded Model Pit Geometri Pit Optimizer
Parameter Geoteknik Mine Design (alternatif 1 s.d n) Reserve optimation (Insitu Reserve
dan ROM Reserve) Penjadualan
Measured Resources
There are fish in the lake. You may
even be able to see them. You have
your boat on the trailer, but you
may go golfing instead.
Modifying Factors
tidak terpenuhi
Insitu Reserve
Mineable Reserve
Kontinuitas ~ Homogenitas
KONDISI GEOLOGI
PARAMETER
SEDERHANA MODERAT KOMPLEK
I. Aspek Sedimentasi
1. Variasi ketebalan Sedikit bervariasi Bervariasi Sangat bervariasi
2. Kesinambungan Ribuan meter Ratusan meter Puluhan meter
3. Percabangan Hampir tidak ada Beberapa Banyak
II. Aspek Tektonik
1. Sesar Hampir tidak ada Jarang Rapat
2. Lipatan Hampir tidak terlipat Terlipat sedang Terlipat kuat
3. Intrusi Tidak berpengaruh Berpengaruh Sangat berpengaruh
4. Kemiringan Landai Sedang Curam
III. Aspek Kualitas
Variasi kualitas Sedikit bervariasi Bervariasi Sangat bervariasi
Kondisi SUMBERDAYA
Kriteria
Geologi Hipotetik Tereka Tertunjuk Terukur
Tidak
Sederhana Jarak titik informasi (m) 1000 < X ≤ 1500 500 < X ≤ 1000 X ≤ 500
Terbatas
Tidak
Moderat Jarak titik informasi (m) 500 < X ≤ 1000 250 < X ≤ 500 X ≤ 250
Terbatas
Tidak
Komplek Jarak titik informasi (m) 200 < X ≤ 400 100 < X ≤ 200 X ≤ 100
Terbatas
700 j 700
k
r
l
m s
n
t
650 o 650
p u
q
b
eoh 173.35
c
d
600 e 600
f
g-h v
i x CUT 1 (N 240ºE/49º)
550 550
CUT 1A (N 240ºE/33º)
eoh 241.15m z
CUT 1B (N 240ºE/60º)
eoh 238.80 m
X = 9502.065
Y = 8660.626
Z = 744.011
500 500
Interpretasi
Awal
3,1 1,2 2,8 3,2 Tebal Urat (m)
Berdasarkan kontrol geologi dan model genetik merupakan kontrol struktur geologi.
DH-01 DH-02
Batas Bijih
Batas endapan (interpretasi atau yang direncanakan)
W aste
Ore
P it Limit
M ineable
M ineral Inventory
(Resources)
150 150
S. Lawai
100 100
50 50
0 0
1,5 m
• Tentukan kadar rata-rata
Nikel pada sumur uji di k 2 = 2,2 % Ni t2
samping.
4,0 m
k 3 = 2,5 % Ni t3
6,5 m
k 4 = 2,0 % Ni t4
8,0 m
k 1 = 1,9 % Ni t1
2,0 m
k 4 = 1,7 % Ni t4
7,5 m