Project No. 1952.000 v
e
R
Approvals
Rev Date Description By Chk. Appr. Rev Date Description By Chk. Appr.
0 For Inquiry
Art Montemayor API 650 Storage Tank March 12, 2002
Rev: 0
API 650 Design Calculations
Shell
Shell Desi
Design
gn : FROM
FROM ( BOTT
BOTTOM
OM COUR
COURSE
SE)) PLA
PLATE TO
TO (TOP
(TOP COU
COURS
RSE)
E) PLA
PLATE
TE
D = Normal
Normal tank diameter , in feet = 50.00
H = depth of tank
tank , in feet = 32.00
G = design Specific gravity of liquid = 1
Sd = allowable StrStre
ess fo
for De
Design co
condition 21,30
,300
E = joint efficiency 0.85%
St = allowable stress516-60 Hydro Test 24,000
CA = Corrosion Allowance 0.0625
FileName: 230781857.xls.ms_office
Page 2 of 8 WorkSheet: Steel Design
Art Montemayor API 650 Storage Tank March 12, 2002
Rev: 0
2
Tank Shell
Shell surface = p*D*H = 5,027 Ft of Shell surface area
FileName: 230781857.xls.ms_office
Page 3 of 8 WorkSheet: Steel Design
Art Montemayor API 650 Storage Tank March 12, 2002
Rev: 0
FOUNDATION DESIGN:
DATA GIVEN:
Seismic Zone; 3
Zone Coefficient Z= 0.3
Importance Factor I = 1.0
Diameter of Tank D= 94.5
Height of Liquid Content (Design) H= 44.5
Shell Height Hs = 48
Design Specific Gravity G= 0.79
Thickness of Bottom PL Under Shell tb = 0.3750
Yeild Strength of Bottom PL Fby = 36,0
36,000
00 PSI
PSI
W eight of Shell Ws = 221
221 Kips
Kips
W eight of Roof + Live Load = 107.4 + 210.4 Wy = 317.
317.8
8 Kips
Kips
2
Weight of Product PI()/4(94.5) (44.5)(.79)(62.4) Wt = 15,3
15,386
86 Kips
Kips
CALCULATIONS:
Seismic Coefficients:
Xs = 19.6
19.685
85 Ft
C1 = 0.60
D/H = 2.12
K = 0.6
0.5 0.5
T =K (D ) =.6 *(94.5 )= 5.83 Seconds
2 2
If Greater Than 4.5 seconds 3.375 (s/T ) = 3.375*1.5/5.83 = 0.149 Seconds
FileName: 230781857.xls.ms_office
Page 4 of 8 WorkSheet: Foundation Design - 1
Art Montemayor API 650 Storage Tank March 12, 2002
Rev: 0
FOUNDATION DESIGN:
Seismic Loads:
M = (Z)(I) {
(Z)(I) { (C1)(Ws)(Xs)+(C1)(Wr)(Ht)+(C1)(W)(X)+(C2)(W 2)(X2)}
V = (Z)(I) {(C1)(Ws)+(C1)(Wr)(Ht)+(C1)
{(C1)(Ws)+(C1)(Wr)(Ht)+(C1)(W)(X)+(C2)(W2)(X2)}
(W)(X)+(C2)(W2)(X2)}
USE 4153 # / ft
Shell Compression: Per E-5
M= 36415 ft
ft-kips
2
M / D (Wt + W L) (G76)/(G
(G76)/(G13)
13) (6.12)
(6.12)
36415 54653 0.666 > 0.785
b = 1.815+1.273*36415/94.5^2 b = 7.0
FileName: 230781857.xls.ms_office
Page 5 of 8 WorkSheet: Foundation Design - 1
Art Montemayor API 650 Storage Tank March 12, 2002
FOUNDATION DESIGN: Rev: 0
Max
Max. Over
verturning Mome
Momen
nt Due To Seism
ismic Loads. 36,415 Kips
Compression or Tension Due To Moment: 5.19 kpf
Seismic Base Shear: 0.27 kips
RINGWALL DESIGN:
Use Following Weight Values for Materials
3
Wt. of Steel 490lb/ft
3
Wt. Of Compacted Soil 110 lb/ft
3
Wt. Of Concrete Wall 150 lb/ft
3
Wt. Of Product in Tank 50 lb/ft
F=Kah(g*p*H+1/2 soh)+270
0.3*6.0[(50*44.5+0.5*110*6.0)]+270 4,869 kips
Hoop Tension:
(2)(1100)/50(44.5)-2(6.0)(150-110) 1.26
Use 16"
16" Thick Concrete Wall
12"
Top of Ground Elevation
16"
48"
12"
FileName: 230781857.xls.ms_office
Page 6 of 8 WorkSheet: Foundation Design - 2
Art Montemayor API 650 Storage Tank March 12, 2002
Rev: 0
Case 1
Case 2
FileName: 230781857.xls.ms_office
Page 7 of 8 WorkSheet: Foundation Design - 2
Art Montemayor API 650 Storage Tank March 12, 2002
DETAILED FOUNDATION DESIGN: Rev: 0
47" - 3"
12" .
q 10" Pad of Sand 10"
E
e
c
a
F Well-Compacted Gravel
h
c
95% Compacted
a 50 / 100 % Passing # 4 Sieve
E
s
r
a
" B # 4 Bars 12" O/C Each Face
0
-
' 9
4 #
6
95 % Compacted Subgrade or fill Material
1'-4" Wall
"
2
1
3' - 6"
NOTES:
1. Oiled sand to be mixture of sand and liquid asphalt (mc70):
2. Use 10 gallons of asphalt per cubic yard of sand:
3. Top of concrete to be smooth and level with 1/8" +/- in any 30 feet of circumferential length:
4. Maximum Deiation to be less than 1/4" overall:
FileName: 230781857.xls.ms_office
Page 8 of 8 WorkSheet: Foundation Design - 3